Article 188 Information on FRR

United Kingdom

Original text. Later amendments are not shown.

1.

All TSOs of each LFC block shall F1publish the FRR availability requirements and requirements for the control quality specified in accordance with Article 158(2) and the technical requirements for the connection specified in accordance with Article 158(3) for their LFC block F2... at least 3 months before their applicability.

2.

All TSOs of each LFC block shall publish the FRR dimensioning rules specified for their LFC block in accordance with Article 157(1) ... at least 3 months before the applicability of the LFC block operational agreement.

3.

All TSOs of F3the GB synchronous area shall publish, by 30 November of each year, an outlook of the reserve capacities on FRR of each LFC block for the next year ....

4.

All TSOs of the GB synchronous area shall publish, within 30 days after the end of the quarter, the actual reserve capacities on FRR of each LFC block of the past quarter ....

Annotations

Textual amendments

F1

Words in art. 188(1)-(4) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 120(2)(a) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F2

Words in art. 188(1)-(4) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 120(2)(b) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F3

Words in Art. 188(3)(4) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 120(3) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)