Article 49 Scheduled data exchange
United Kingdom
Unless otherwise provided by the TSO, each power generating facility owner of a power generating module which is a SGU in accordance with Article 2(1)(a) and 2(1)(e) connected to the distribution system shall provide the TSO and the DSO to which it has the connection point, with at least the following data:
- (a)
its scheduled unavailability, scheduled active power restriction and its forecasted scheduled active power output at the connection point;
- (b)
any forecasted restriction in the reactive power control capability F1...
- (c)
...
Annotations
Textual amendments
- F1
Art. 49(c) and word omitted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 42 (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)