Division 8.1.8.4.2 PDP calibration
United Kingdom
A positive-displacement pump (PDP) shall be calibrated to determine a flow-versus-PDP speed equation that accounts for flow leakage across sealing surfaces in the PDP as a function of PDP inlet pressure. Unique equation coefficients shall be determined for each speed at which the PDP is operated. A PDP flow meter shall be calibrated as follows:
- (a)
The system shall be connected as shown in Figure 6.5;
- (b)
Leaks between the calibration flow meter and the PDP shall be less than 0,3 % of the total flow at the lowest calibrated flow point; for example, at the highest pressure restriction and lowest PDP-speed point;
- (c)
While the PDP operates, a constant temperature at the PDP inlet shall be maintained within ± 2 % of the mean absolute inlet temperature, T in;
- (d)
The PDP speed is set to the first speed point at which it is intended to calibrate;
- (e)
The variable restrictor is set to its wide-open position;
- (f)
The PDP is operated for at least 3 minutes to stabilize the system. Then by continuously operating the PDP, the mean values of at least 30 s of sampled data of each of the following quantities are recorded:
- (i)
The mean flow rate of the reference flow meter, ;
- (ii)
The mean temperature at the PDP inlet, T in;
- (iii)
The mean static absolute pressure at the PDP inlet, p in;
- (iv)
The mean static absolute pressure at the PDP outlet, p out;
- (v)
The mean PDP speed, n PDP;
- (i)
- (g)
The restrictor valve shall be incrementally closed to decrease the absolute pressure at the inlet to the PDP, p in;
- (h)
The steps in paragraphs 8.1.8.4.2(f) and (g) shall be repeated to record data at a minimum of six restrictor positions reflecting the full range of possible in-use pressures at the PDP inlet;
- (i)
The PDP shall be calibrated by using the collected data and the equations set out in Annex VII;
- (j)
The steps in paragraphs (f) to (i) of this point shall be repeated for each speed at which the PDP is operated;
- (k)
The equations in section 3 of Annex VII (molar based approach) or section 2 of Annex VII (mass based approach) shall be used to determine the PDP flow equation for emission testing;
- (l)
The calibration shall be verified by performing a CVS verification (i.e., propane check) as described in point 8.1.8.5;
- (m)
The PDP may not be used below the lowest inlet pressure tested during calibration.