OpenLegislation

Division 8.1.8.4.2 PDP calibration

United Kingdom

Original text. Later amendments are not shown.

A positive-displacement pump (PDP) shall be calibrated to determine a flow-versus-PDP speed equation that accounts for flow leakage across sealing surfaces in the PDP as a function of PDP inlet pressure. Unique equation coefficients shall be determined for each speed at which the PDP is operated. A PDP flow meter shall be calibrated as follows:

  1. (a)

    The system shall be connected as shown in Figure 6.5;

  2. (b)

    Leaks between the calibration flow meter and the PDP shall be less than 0,3 % of the total flow at the lowest calibrated flow point; for example, at the highest pressure restriction and lowest PDP-speed point;

  3. (c)

    While the PDP operates, a constant temperature at the PDP inlet shall be maintained within ± 2 % of the mean absolute inlet temperature, T in;

  4. (d)

    The PDP speed is set to the first speed point at which it is intended to calibrate;

  5. (e)

    The variable restrictor is set to its wide-open position;

  6. (f)

    The PDP is operated for at least 3 minutes to stabilize the system. Then by continuously operating the PDP, the mean values of at least 30 s of sampled data of each of the following quantities are recorded:

    1. (i)

      The mean flow rate of the reference flow meter, q – V ref ;

    2. (ii)

      The mean temperature at the PDP inlet, T in;

    3. (iii)

      The mean static absolute pressure at the PDP inlet, p in;

    4. (iv)

      The mean static absolute pressure at the PDP outlet, p out;

    5. (v)

      The mean PDP speed, n PDP;

  7. (g)

    The restrictor valve shall be incrementally closed to decrease the absolute pressure at the inlet to the PDP, p in;

  8. (h)

    The steps in paragraphs 8.1.8.4.2(f) and (g) shall be repeated to record data at a minimum of six restrictor positions reflecting the full range of possible in-use pressures at the PDP inlet;

  9. (i)

    The PDP shall be calibrated by using the collected data and the equations set out in Annex VII;

  10. (j)

    The steps in paragraphs (f) to (i) of this point shall be repeated for each speed at which the PDP is operated;

  11. (k)

    The equations in section 3 of Annex VII (molar based approach) or section 2 of Annex VII (mass based approach) shall be used to determine the PDP flow equation for emission testing;

  12. (l)

    The calibration shall be verified by performing a CVS verification (i.e., propane check) as described in point 8.1.8.5;

  13. (m)

    The PDP may not be used below the lowest inlet pressure tested during calibration.