Paragraph 4 I1
If the following conditions are satisfied, a designating authority may designate for the purposes of this Schedule—
a structure, or
a natural or man-made feature of the environment.
Condition 1 is that the designating authority thinks the existence or location of the structure or feature affects—
a flood risk, or
a coastal erosion risk.
Condition 2 is that the designating authority has flood or coastal erosion risk management functions in respect of the risk which is affected.
Condition 3 is that the structure or feature is not designated by another authority for the purposes of this Schedule.
Condition 4 is that the owner of the structure or feature is not a designating authority.
Annotations
Commencement
- I1
Sch. 1 para. 4 in force at 1.8.2012 by S.I. 2012/2000, art. 2(b)
Notes on Schedule 1
Modifications
- C1
Sch. 1 excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 19 Pt. 1 para. 11
- C2
Sch. 1 excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), art. 1, Sch. 17 para. 6