Paragraph 4 I1

(1)

If the following conditions are satisfied, a designating authority may designate for the purposes of this Schedule—

(a)

a structure, or

(b)

a natural or man-made feature of the environment.

(2)

Condition 1 is that the designating authority thinks the existence or location of the structure or feature affects—

(a)

a flood risk, or

(b)

a coastal erosion risk.

(3)

Condition 2 is that the designating authority has flood or coastal erosion risk management functions in respect of the risk which is affected.

(4)

Condition 3 is that the structure or feature is not designated by another authority for the purposes of this Schedule.

(5)

Condition 4 is that the owner of the structure or feature is not a designating authority.

Annotations

Commencement

I1

Sch. 1 para. 4 in force at 1.8.2012 by S.I. 2012/2000, art. 2(b)

Notes on Schedule 1

Modifications

C1

Sch. 1 excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 19 Pt. 1 para. 11

C2

Sch. 1 excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), art. 1, Sch. 17 para. 6