Paragraph 5 I1C1C2C3C4C5C6
A person may not alter, remove or replace a designated structure or feature without the consent of the responsible authority.
A designation is a local land charge.
Annotations
Modifications
- C1
Sch. 1 para. 5 excluded (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(1), Sch. 21 para. 5
- C2
Sch. 1 para. 5 excluded (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), arts. 1, 5(1)(c) (with art. 37(2))
- C3
Sch. 1 para. 5 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 21 para. 5
- C4
Sch. 1 para. 5 excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 5(1)(c)
- C5
Sch. 1 para. 5 excluded (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 5 (with art. 34(2), Sch. 12 paras. 5, 47, 79)
- C6
Sch. 1 para. 5 excluded (25.4.2024) by The Network Rail (Church Fenton Level Crossing Reduction) Order 2024 (S.I. 2024/526), arts. 1, 5(1)
Commencement
- I1
Sch. 1 para. 5 in force at 1.8.2012 by S.I. 2012/2000, art. 2(b)
Notes on Schedule 1
Modifications
- C1
Sch. 1 excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 19 Pt. 1 para. 11
- C2
Sch. 1 excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), art. 1, Sch. 17 para. 6