Paragraph 6 I1
England and Wales
The responsible authority may by notice given to the owner—
consent to specified alterations, or alterations of a specified kind, to a designated structure or feature;
vary or withdraw consent under paragraph (a) (but not retrospectively).
The responsible authority may by notice given to the owner consent to the removal or replacement of a designated structure or feature.
The authority may give notice under sub-paragraph (1) or (2)—
on the application of the owner, or
if it otherwise thinks it appropriate.
Consent may be—
general or specific;
absolute or conditional.
Before exercising a function under this paragraph in relation to an alteration, removal or replacement which may affect a flood or coastal erosion risk in Wales, the Environment Agency must consult the Natural Resources Body for Wales.
Before exercising a function under this paragraph in relation to an alteration, removal or replacement which may affect a flood or coastal erosion risk in England, the Natural Resources Body for Wales must consult the Environment Agency.
The responsible authority may refuse to give consent applied for under sub-paragraph (3)(a) only on the ground that, in the authority's opinion, the proposed alteration, removal or replacement would affect a flood risk or a coastal erosion risk.
Annotations
Textual amendments
- F1
Sch. 1 para. 6(4A)(4B) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (No. 755), art. 1(2), Sch. 2 para. 466(3) (with Sch. 7)
Commencement
- I1
Sch. 1 para. 6 in force at 1.8.2012 by S.I. 2012/2000, art. 2(b)
Notes on Schedule 1
Modifications
- C1
Sch. 1 excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 19 Pt. 1 para. 11
- C2
Sch. 1 excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), art. 1, Sch. 17 para. 6