Paragraph 2 I1
England, Wales and Scotland
A nationally significant infrastructure project as defined in sections 14 and 16 (electric lines) of the 2008 Act comprising—
In the county of Suffolk, district of Suffolk Coastal
Work No. 8A — overhead 400 kV electric lines connecting a new sealing end compound to the extended arms of the existing pylon at reference point D;
Work No. 8B — overhead 400 kV electric lines connecting a new sealing end compound to the extended arms of the existing pylon at reference point E;
and associated development within the meaning of section 115(2) of the 2008 Act comprising—
Work No. 9A — a grid connection consisting of one or more cables laid underground from Work No. 8A in an approximately northerly then westerly direction to Work No. 10;
Work No. 9B — a grid connection consisting of one or more cables laid underground from Work No. 8B in a north westerly direction to Work No. 10;
Work No. 10 — an electrical substation compound at Sizewell Wents to the west of the existing Greater Gabbard substation;
Work No. 11 — a grid connection consisting of one or more cables laid underground from Work No. 10 in a south then easterly direction, connecting to the existing underground cable at reference point F, and a grid connection laid underground from Work No. 10 to the existing Greater Gabbard substation at reference point G;
and in connection with such Work Nos. 8A to 11 and to the extent that they do not otherwise form part of any such work, further associated development shown on the plans referred to in the Requirements, or approved pursuant to the Requirements, including—
ramps, means of access and footpaths;
bunds, embankments, swales, landscaping, fencing and boundary treatments;
habitat creation;
jointing bays, cable ducts, manholes and other works associated with cable laying;
works for the provision of apparatus including cabling, water supply works, surface water management systems and culverting;
construction lay down areas and compounds and their restoration; and
such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project and which fall within the scope of the works assessed by the environmental statement.
Annotations
Commencement
- I1
Sch. 1 Pt. 1 para. 2 in force at 15.6.2013, see art. 1