The Galloper Wind Farm Order 2013
S.I. 2013/1203 · Made 24 May 2013 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 24th May 2013
Coming into force 15th June 2013
The application was examined by a Panel appointed as the Examining authority by the Chair of the Infrastructure Planning Commission pursuant to Chapter 2 of Part 6 of the 2008 Act, and following the abolition of the Commission, by the Secretary of Statef3, and the examination was carried out in accordance with Chapter 4 of Part 6 of the 2008 Act, and the Infrastructure Planning (Examination Procedure) Rulesf4;
The Examining authority, having considered the application together with the documents that accompanied it, and the representations made and not withdrawn, has, in accordance with section 74 of the 2008 Act, made a report and recommendation to the Secretary of State;
The Secretary of State, having considered the report and recommendation of the Panel, and decided the application, has determined to make an Order giving effect to the proposals comprised in the application with modifications;
The Secretary of State, in exercise of the powers conferred by sections 114, 115, 120 and 149A of the 2008 Act, makes the following Order:
Annotations to the whole text
Footnotes
- f1
-
S.I. 2009/2264, amended by S.I. 2010/602, 2012/635, 2012/2732.
- f2
-
2008 c. 29. Parts 1 to 7 were amended by Part 6 of Chapter 6 of, and Schedule 13 to, the Localism Act 2011 (c. 20). Section 149A was inserted by paragraph 4 in Part 1 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23).
- f3
-
Following the abolition of the Infrastructure Commission on 1st April 2012 the Panel appointed under section 61(2) of the Planning Act 2008 is treated as if appointed by the Secretary of State by virtue of a direction given by the Secretary of State under section 129 of the Localism Act.
- f4
-
S.I. 2010/103, amended by S.I. 2012/635.
Contents
- 1Citation and commencement
- 2Interpretation
- 3Development consent etc. granted by the Order
- 4Maintenance of authorised project
- 5Operation of an offshore electricity generating station and keeping of overhead lines
- 6Requirements, appeals, etc.
- 7Benefit of the Order
- 8Public rights of navigation
- 9Abatement of works abandoned or decayed
- 10Deemed licence under the Marine and Coastal Access Act 2009
- 11Saving for Trinity House
- 12Crown rights
- 13Street works
- 14Agreements with street authorities
- 15Authority to survey and investigate the land
- 16Compulsory acquisition of land
- 17Time limit for exercise of authority to acquire land compulsorily
- 18Compulsory acquisition of rights
- 19Private rights
- 20Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 21Acquisition of subsoil only
- 22Rights under or over streets
- 23Temporary use of land for carrying out the authorised project
- 24Temporary use of land for maintaining authorised project
- 25For the protection of specified undertakers
- 26Statutory undertakers
- 27Recovery of costs of new connections
- 28Application of landlord and tenant law
- 29Operational land for purposes of the 1990 Act
- 30Certification of plans etc.
- 31Arbitration
- Signature
- Schedule 1: Authorised project
- Part 1: Authorised development
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 2Ancillary works
- Part 3: Requirements
- 1Interpretation
- 2Time limits
- 3Design parameters for wind turbines
- 4Approval of detailed wind turbine design parameters by the Secretary of State
- 5Further offshore design requirements
- 6Further offshore design requirements
- 7Further offshore design requirements
- 8Further offshore design requirements
- 9Offshore safety management
- 10Aids to navigation
- 11Aids to navigation
- 12Aids to navigation
- 13Aids to navigation
- 14Aids to navigation
- 15Aids to navigation
- 16Aids to navigation
- 17Provision against danger to navigation
- 18Offshore decommissioning
- 19Stages of authorised development onshore
- 20Detailed design approval onshore
- 21Detailed design approval onshore
- 22Provision of landscaping
- 23Implementation and maintenance of landscaping
- 24Fencing and other means of enclosure
- 25Surface and foul water drainage
- 26Archaeology
- 27Ecological management plan
- 28Construction code of practice
- 29Construction hours
- 30Control of noise during operational phase
- 31Control of artificial light emissions
- 32Detailed emergency response plan
- 33European protected species
- 34Restoration of land used temporarily for construction
- 35Interference with telecommunications
- 36Onshore decommissioning
- 37Requirement for written approval
- 38Amendments to approved details
- Schedule 2: Deemed licence under the Marine and Coastal Access Act 2009
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed marine activities
- 3Details of licensed marine activities
- Part 2: Conditions
- 1Design parameters for wind turbines
- 2Approval of detailed wind turbine design parameters by the Secretary of State
- 3Further offshore design requirements
- 4Further offshore design requirements
- 5Further offshore design requirements
- 6Further offshore design requirements
- 7Notifications and inspections
- 8Chemicals, drilling and debris
- 9Force majeure
- 10Pre-construction plans and documentation
- 11Pre-construction plans and documentation
- 12Pre-construction plans and documentation
- 13Seasonal restrictions
- 14Reporting of engaged agents, contractors and vessels
- 15Equipment and operation of vessels engaged in licensed activities
- 16Pre-construction monitoring
- 17Construction monitoring
- 18Post construction
- 19Offshore decommissioning
- 20Requirement for written approval
- Schedule 3Streets subject to street works
- Schedule 4Land in which only new rights etc., may be acquired
- Schedule 5Land of which temporary possession may be taken
- Schedule 6
- Part 1: For the protection of specified undertakers
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 2: For the protection of EDF Energy
- 1Paragraph 1
- 2Sizewell C proposed intake infrastructure
- 3Quality of Sizewell B cooling water intake
- 4Buffer zone for Sizewell B offshore infrastructure
- Explanatory note