OpenLegislation

Paragraph 1 InterpretationI1

England, Wales and Scotland

In this Part of this Schedule—

  • “AIS” means automatic identification system;

  • “AOD” means above ordnance datum;

  • “the Approval Application” means the application made by the undertaker to the Secretary of State under paragraph 4;

  • “the Approval Notice” means the notice issued by the Secretary of State under paragraph 4;

  • “the CAA” means the Civil Aviation Authority constituted by the Civil Aviation Act 1982f1;

  • “CNIS” means Channel Navigation Information Service;

  • “commence” means, in relation to the authorised project, beginning to carry out any activity not comprising a material operation (as defined in section 155 of the 2008 Act), and in relation to the authorised development the carrying out of a material operation, and the words “commenced” and “commencement” shall be construed accordingly;

  • “connection works” means Work Nos. 3B to 7 and any further associated development in connection with those works as described in paragraph 1 of Part 1 of this Schedule;

  • “Defence Infrastructure Organisation Safeguarding” means Ministry of Defence Safeguarding, Defence Infrastructure Organisation, Kingston Road, Sutton Coldfield. West Midlands B75 7RL and any successor body to its functions;

  • “LAT” means lowest astronomical tide;

  • “the Maximum WTG Number” means the number of wind turbine generators specified in the Approval Notice;

  • “the Minimum Clearance Level” means the minimum distance, measured in metres, between the lowest point of the rotating blade of a wind turbine generator and MHWS specified in the Approval Notice;

  • “Natural England” means the body established by section 1 of the Natural Environment and Rural Communities Act 2006f2 and includes any successor to its statutory functions;

  • “notice to mariners” includes any notice to mariners which may be issued by the Admiralty, Trinity House, Queen’s harbourmasters, government departments and harbour and pilotage authorities;

  • “onshore works” means the connection works and the transmission works above MLWST together;

  • F1“the Percentage Reduction” means the reduction of 15.2% in the predicted mortality of lesser black-backed gulls, by restricting the number of predicted mortalities attributable to the authorised development to a maximum of 101;

  • “Radar” means radio detection and ranging;

  • “relevant works” means the connection works or the transmission works as the case may be, to the intent that the approval of details, commencement and/or completion of the works, and/or the commencement of commercial operation of the works, in relation to the connection works is not dependent on any such matter in relation to the transmission works and vice versa;

  • “transmission works” means Work Nos. 8A to 11 and any further associated development as described in paragraph 2 of Part 1 of this Schedule;

  • “TSS” means traffic separation scheme;

  • “UK Hydrographic Office” means the UK Hydrographic Office of Admiralty Way, Taunton, Somerset TA1 2DN or any replacement body or successor to its functions;

  • “Work No” means that part of the authorised development with the corresponding number specified in Part 1 of this Schedule;

  • “the WTG Specification” means the manufacturer and model of wind turbine generators specified in the Approval Notice.

Annotations

Textual amendments

F1

Words in Sch. 1 Pt. 3 para. 1 substituted (21.8.2013) by The Galloper Wind Farm (Correction) Order 2013 (S.I. 2013/2086), arts. 1, 2, Sch.

Commencement

I1

Sch. 1 Pt. 3 para. 1 in force at 15.6.2013, see art. 1

Footnotes

f1

1982 c. 16.

f2

2006 c. 16. Section 1 was amended by section 311(2) and (3) of the Marine and Coastal Access Act 2009 (c. 23).