In the District of West Somerset and the County of Somerset In the District of West Somerset and the County of Somerset
England, Wales and Scotland
Work No. 1A
HPC Main Site: An electricity generating station with a nominal gross electrical capacity of 3,260 MW power generated by two nuclear reactor units, including the following works—
- (a)
site preparation works, including site clearance (including fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soil stripping and storage, site levelling, spoil screening / storage for re-use on site); provision of spoil retaining structures; deep excavations; provision and relocation of drainage infrastructure (including culverts, outfalls, balancing ponds);
- (b)
establishment of site construction compounds, temporary vehicle parking, construction hoardings, perimeter enclosure, security fencing, construction related buildings, structures, plant, machinery (including concrete batching), cranes, concrete silos, construction lighting and internal haulage routes;
- (c)
further to works F1listed at (a), earthworks, including spoil bunds and ground terracing to formation levels, utilities trenches, service tunnels and associated access points and surface and foul water drainage system;
- (d)
a nuclear reactor unit (unit 1), associated balance of plant, below ground services, ancillary buildings including—
- (i)
buildings, structures and plant housing ‘Nuclear Island’ for Unit 1, including—
Reactor Building;
Fuel Building;
Safeguard Buildings;
Nuclear Auxiliary Building;
Access Tower;
Fuel Building Hall;
Boron Storage;
Radioactive Waste Storage Building;
Radioactive Waste Process Building;
Hot Laundry;
Hot Workshop, Hot Warehouse, Facilities for Decontamination;
Refuelling Water Storage Tank
Emergency Diesel Generator Buildings;
Cooling Water Discharge Weir (Buildings); F6...
...
- (ii)
- (iii)
buildings, structures and plant housing ‘Cooling Water Pumphouse and Associated Buildings’ for Unit 1, including—
- (i)
- (e)
a nuclear reactor unit (unit 2), associated balance of plant, below ground services, ancillary buildings including—
- (i)
buildings, structures and plant housing ‘Nuclear Island’ for Unit 2, including—
Reactor building;
Fuel building;
Safeguard Buildings;
Nuclear Auxiliary Building;
Access Tower;
Fuel Building Hall;
Boron Storage;
Radioactive Waste Treatment Building;
Hot Laundry;
Hot Workshop, Hot Warehouse, Facilities for Decontamination;
Effluent Tanks;
Emergency Diesel Generator Buildings;
F12Battery Load Bank;
Cooling Water Discharge Weir (Buildings); and
Refuelling Water Storage Tank
- (ii)
- (iii)
buildings, structures and plant housing ‘Cooling Water Pumphouse and Associated Buildings’ for Unit 2, including—
Cooling Water Pumphouse;
Forebay;
Outfall Pond;
Filtering Debris Recovery Pit; including associated fish return system infrastructure; and
Fire-Fighting Water Building;
- (i)
- (f)
buildings, structures and plant housing ‘Remaining Balance of Plant’ and other plant, including—
- (g)
buildings, structures and plant housing ‘Fuel and Waste Storage’ including—
Interim Spent Fuel Store;
Access Control Building; and
Intermediate Level Waste Interim Storage Facility;
- (h)
ancillary and supporting buildings, structures and plant including—
Operational Service Centre;
Main Control and Access Building;
F19...
F20Auxiliary Administration Building;
F21...
F22...
Meteorological Station;
Meteorological Mast;
Garage for Handling Facilities;
Oil and Grease Storage and Oil Ancillary Building;
Areva Warehouse;
Raw Water and Potable Water Supply;
Outage Access Control Building;
Contaminated Tools Store F23...;
Conventional Waste Storage;
Transit Area for Very Low Level Waste and Low Level Waste;
F26Back-up Emergency Equipment Store
Service Access Buildings; F27...
F28 Underground Tunnel High Points;
F29Services Ventilation Building;
Valve Room for Demineralisation Station.
F32Emergency Response Centre; and
Emergency Response Energy Centre.
- (i)
buildings and structures housing—
Simulator Building/Training Centre; and
Public Information Centre;
- (j)
National Grid Substation and associated buildings and plant;
- (k)
transmission towers (pylons) and associated overhead line transmission infrastructure to provide connection to the National Grid Substation (Work No. 1A(j));
- (l)
landscape works, comprising temporary and permanent works, external lighting, footpaths, maintenance buildings and car parking;
- (m)
site access points, internal access roads, internal rail track, hardstanding and vehicle, motorcycle and bicycle parking areas F33..., access roundabout;
- (n)
perimeter and internal fencing, signage, secured entrance, security buildings, CCTV poles, gates, barriers and bollards;
- (o)
establishment and maintenance of a sea wall and associated coastal defences, including foreshore rock armour revetments; and
- (p)
an emergency access road, including junction to existing highway, and Bridge over Bum Brook.
The location of the above works is shown on sheet no. 2.
- (a)
Work No. 1B
A new access road, approximately 700m in length, and roundabout connecting to the C182, associated laying, replacement, realignment and diversions of apparatus and associated works, the location of which is shown on sheet no. 2.
Work No. 1C
F34Off-site Delivery Checkpoint , layby and turning head, adjacent to the C182, the location of which is shown on sheet no. 2.
Annotations
Textual amendments
- F1
Words in Sch. 1 Pt. 1 substituted (20.11.2013) by The Hinkley Point C (Nuclear Generating Station) (Correction) Order 2013 (S.I. 2013/2938), art. 1, Sch. Table 2
- F2
Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(2)(a)
- F3
Words in Sch. 1 Pt. 1 inserted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(2)(a)
- F4
Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(2)(b)
- F5
Word in Sch. 1 Pt. 1 inserted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(2)(b)
- F6
Words in Sch. 1 Pt. 1 omitted (24.3.2018) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(2)(c)
- F7
Word in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(3)(a)
- F8
Words in Sch. 1 Pt. 1 substituted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(3)(b)
- F9
Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(3)(c)
- F10
Word in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(4)(a)
- F11
Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(4)(b)
- F12
Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(5)
- F13
Word in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(6)(a)
- F14
Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(6)(b)
- F15
Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(7)(a)
- F16
Word in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(7)(b)
- F17
Word in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(7)(c)
- F18
Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(7)(d)
- F19
Words in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(a)
- F20
Words in Sch. 1 Pt. 1 substituted (7.1.2022) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(b)
- F21
Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(8)(a)
- F22
Words in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(c)
- F23
Words in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(8)(b)
- F24
Words in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(d)
- F25
Word in Sch. 1 Pt. 1 omitted (10.9.2015) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(8)(c)
- F26
Words in Sch. 1 Pt. 1 substituted (7.1.2022) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(e)
- F27
Word in Sch. 1 Pt. 1 omitted (24.3.2018) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(3)(a)
- F28
Words in Sch. 1 Pt. 1 inserted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(3)(b)
- F29
Words in Sch. 1 Pt. 1 inserted (10.9.2015) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 (S.I. 2015/1666), arts. 1, 3(8)(f)
- F30
Words in Sch. 1 Pt. 1 inserted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), arts. 1, 3(3)(c)
- F31
Word in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(f)
- F32
Words in Sch. 1 Pt. 1 inserted (7.1.2022) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(2)(g)
- F33
Word in Sch. 1 Pt. 1 omitted (7.1.2022) by virtue of The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 3(3)
- F34
Words in Sch. 1 Pt. 1 substituted (7.1.2022) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2021 (S.I. 2021/1474), arts. 1, 4
Notes on Part 1
Commencement
- I1
Sch. 1 Pt. 1 in force at 9.4.2013, see art. 1