Schedule 12 DESIGN PARAMETERSI1
England and Wales
F1Table 9
(1) Building or structure | (2) Maximum length (metres) | (3) Maximum width (metres) | (4) Maximum height (metres above 0 meters above ordnance datum) | (5) Maximum diameter (metres) |
|---|---|---|---|---|
| Single gas turbine and generator | 31 | 20 | 20 | - |
| Gas turbine building | 50 | 35 | 29 | - |
| Exhaust stack | - | - | 56 | 12 |
| Air intakes | 24 | 16 | 40 | - |
| Fin-fan cooler | 30 | 15 | 17 | - |
| Control room, workshops, stores | 35 | 20 | 16 | - |
| Demineralised tank, firewater tank | - | - | 32 | 24 |
Annotations
Textual amendments
- F1
Sch. 12 table substituted (28.3.2024) by The Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024 (S.I. 2024/446), arts. 1, 3
Commencement
- I1
Sch. 12 in force at 1.9.2020, see art. 1