OpenLegislation

Paragraph 19 I1

The alteration of a dam or reservoir in Wales where the additional volume of water to be held back by the dam or stored in the reservoir as a result of the alteration is expected to exceed 1 million cubic metres but not to exceed 10 million cubic metres.

Annotations

Commencement

I1

Sch. 1 para. 19 in force at 15.12.2025, see reg. 1