OpenLegislation

The Infrastructure Planning (Model Provisions) (England and Wales) Order 2009

S.I. 2009/2265 · Made 1 September 2009

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Infrastructure Planning

Made 1st September 2009

Laid before Parliament 8th September 2009

Coming into force 1st October 2009

The Secretary of State, in exercise of the powers conferred by section 38 of the Planning Act 2008f1, makes the following Order:

Annotations to the whole text

Footnotes

f1

2008 c.29.

Contents

  1. 1Citation and commencement
  2. 2Model provisions
  3. Signature
  4. Schedule 1: General model provisions
  5. 1Interpretation
  6. 2Development consent etc. granted by the Order
  7. 3Maintenance of authorised project
  8. 4Benefit of Order
  9. 5Consent to transfer benefit of Order
  10. 6Application and modification of legislative provisions
  11. 7Defence to proceedings in respect of statutory nuisance
  12. 8Street works
  13. 9Stopping up of streets
  14. 10Public rights of way
  15. 11Temporary stopping up of streets
  16. 12Access to works
  17. 13Agreements with street authorities
  18. 14Discharge of water
  19. 15Protective work to buildings
  20. 16Authority to survey and investigate the land
  21. 17Removal of human remains
  22. 18Compulsory acquisition of land
  23. 19Compulsory acquisition of land – incorporation of the mineral code
  24. 20Time limit for exercise of authority to acquire land compulsorily
  25. 21Compulsory acquisition of rights
  26. 22Private rights of way
  27. 23Application of the Compulsory Purchase (Vesting Declarations) Act 1981
  28. 24Acquisition of subsoil only
  29. 25Acquisition of land limited to subsoil lying more than 9 metres beneath surface
  30. 26Acquisition of part of certain properties
  31. 27Rights under or over streets
  32. 28Temporary use of land for carrying out the authorised project
  33. 29Temporary use of land for maintaining authorised project
  34. 30Special category land
  35. 31Statutory undertakers
  36. 32Apparatus and rights of statutory undertakers in stopped-up streets
  37. 33Recovery of costs of new connections
  38. 34Railway and navigation undertakings
  39. 35Application of landlord and tenant law
  40. 36Operational land for purposes of the 1990 Act
  41. 37Deemed consent under section 34 of the Coast Protection Act 1949
  42. 38Deemed licence under Part 2 of the Food and Environment Protection Act 1985
  43. 39Felling or lopping of trees
  44. 40Trees subject to tree preservation orders
  45. 41Certification of plans etc
  46. 42Arbitration
  47. Part edule A: AUTHORISED PROJECT
  48. Part 1AUTHORISED DEVELOPMENT
  49. Part 2ANCILLARY WORKS
  50. edule BSTREETS SUBJECT TO STREET WORKS
  51. Part edule C: STREETS TO BE STOPPED UP
  52. Part 1STREETS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
  53. Part 2STREETS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
  54. edule DSTREETS TO BE TEMPORARILY STOPPED UP
  55. edule EACCESS TO WORKS
  56. edule FLAND OF WHICH ONLY SUBSOIL MORE THAN 9 METRES BENEATH SURFACE MAY BE ACQUIRED
  57. edule GLAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
  58. edule HDEEMED CONSENT UNDER COAST PROTECTION ACT 1949
  59. edule IDEEMED LICENCE UNDER THE FOOD AND ENVIRONMENT PROTECTION ACT 1985
  60. edule JTREES SUBJECT TO TREE PRESERVATION ORDERS
  61. Schedule 2: Model provisions for railways
  62. Part Preliminary
  63. 1Interpretation
  64. 2Incorporation of the Railway Clauses Acts
  65. 3Application and modification of legislative provisions
  66. Part Principal powers
  67. 4Development consent etc. granted by the Order
  68. 5Maintenance of authorised project
  69. 6Limits of Deviation
  70. 7Benefit of Order
  71. 8Consent to transfer benefit of Order
  72. Part Streets
  73. 9Street works
  74. 10Construction and maintenance of new or altered streets
  75. 11Stopping up of streets
  76. 12Application of the 1991 Act
  77. 13Public rights of way
  78. 14Temporary stopping up of streets
  79. 15Access to works
  80. 16Agreements with street authorities
  81. 17Construction of bridges and tunnels
  82. 18Level Crossings
  83. 19Railway and navigation undertakings
  84. Part Supplemental powers
  85. 20Discharge of water
  86. 21Protective work to buildings
  87. 22Authority to survey and investigate the land
  88. 23Removal of human remains
  89. Part Powers of acquisition
  90. 24Compulsory acquisition of land
  91. 25Compulsory acquisition of land – incorporation of the mineral code
  92. 26Time limit for exercise of authority to acquire land compulsorily
  93. 27Compulsory acquisition of rights
  94. 28Private rights of way
  95. 29Application of the Compulsory Purchase (Vesting Declarations) Act 1981
  96. 30Acquisition of subsoil only
  97. 31Acquisition of land limited to subsoil lying more than 9 metres beneath surface
  98. 32Acquisition of part of certain properties
  99. 33Application of the Land Compensation Act 1973
  100. 34Rights under or over streets
  101. 35Temporary use of land for carrying out the authorised project
  102. 36Temporary use of land for maintaining authorised project
  103. 37Special category land
  104. 38Statutory undertakers
  105. 39Apparatus and rights of statutory undertakers in stopped up streets
  106. 40Recovery of costs of new connections
  107. Part Operations
  108. 41Operation and use of railways
  109. 42Fares
  110. 43Deemed consent under section 34 of the Coast Protection Act 1949
  111. 44Deemed licence under Part 2 of the Food and Environment Protection Act 1985
  112. 45Felling or lopping of trees
  113. 46Trees subject to tree preservation orders
  114. Part Miscellaneous and general
  115. 47Application of landlord and tenant law
  116. 48Operational land for purposes of the 1990 Act
  117. 49Defence to proceedings in respect of statutory nuisance
  118. 50Protections of Interests
  119. 51Certification of plans etc
  120. 52Arbitration
  121. Part edule A: AUTHORISED PROJECT
  122. Part 1AUTHORISED DEVELOPMENT
  123. Part 2ANCILLARY WORKS
  124. edule BSTREETS SUBJECT TO STREET WORKS
  125. Part edule C: STREETS TO BE STOPPED UP
  126. Part 1STREETS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
  127. Part 2STREETS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
  128. edule DSTREETS TO BE TEMPORARILY STOPPED UP
  129. edule EACCESS TO WORKS
  130. edule FLAND OF WHICH ONLY SUBSOIL MORE THAN 9 METRES BENEATH SURFACE MAY BE ACQUIRED
  131. edule GLAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
  132. edule HDEEMED CONSENT UNDER COAST PROTECTION ACT 1949
  133. edule IDEEMED LICENCE UNDER THE FOOD AND ENVIRONMENT PROTECTIONI ACT 1985
  134. edule JTREES SUBJECT TO TREE PRESERVATION ORDERS
  135. edule KLEVEL CROSSINGS
  136. edule LPROTECTIVE PROVISIONS
  137. Schedule 3: Model provisions for harbours
  138. Part Preliminary
  139. 1Interpretation
  140. 2Incorporation of the Harbours, Docks and Piers Clauses Act 1847
  141. Part Principal powers
  142. 3Development consent etc. granted by the Order
  143. 4Period for completion of work
  144. 5Limits of harbour
  145. 6Maintenance of authorised project
  146. 7Subsidiary works
  147. 8Benefit of Order
  148. 9Consent to transfer benefit of Order
  149. Part Streets
  150. 10Street works
  151. 11Stopping up of streets
  152. 12Temporary stopping up of streets
  153. 13Access to works
  154. 14Agreements with street authorities
  155. 15Public rights of way
  156. Part Supplemental powers
  157. 16Discharge of water
  158. 17Protective work to buildings
  159. 18Authority to survey and investigate the land
  160. 19Removal of human remains
  161. 20Right to dredge
  162. 21Tidal works not to be executed without approval of Secretary of State
  163. 22Abatement of works abandoned or decayed
  164. 23Survey of tidal works
  165. 24Lights on tidal works etc. during construction
  166. 25Provision against danger to navigation
  167. 26Permanent lights on tidal works
  168. 27Rights to lease etc.
  169. Part Powers of acquisition
  170. 28Compulsory acquisition of land
  171. 29Compulsory acquisition of land – incorporation of the mineral code
  172. 30Time limit for exercise of authority to acquire land compulsorily
  173. 31Compulsory acquisition of rights
  174. 32Private rights of way
  175. 33Application of the Compulsory Purchase (Vesting Declarations) Act 1981
  176. 34Acquisition of subsoil only
  177. 35Acquisition of land limited to subsoil lying more than 9 metres beneath surface
  178. 36Acquisition of part of certain properties
  179. 37Rights under or over streets
  180. 38Temporary use of land for carrying out the authorised project
  181. 39Temporary use of land for maintaining authorised project
  182. 40Special category land
  183. 41Statutory undertakers
  184. 42Apparatus and rights of statutory undertakers in stopped up streets
  185. 43Recovery of costs of new connections
  186. Part Miscellaneous and general
  187. 44Deemed consent under section 34 of the Coast Protection Act 1949
  188. 45Deemed licence under Part 2 of the Food and Environment Protection Act 1985
  189. 46Felling or lopping of trees
  190. 47Trees subject to tree preservation orders
  191. 48Railway and navigation undertakings
  192. 49Application of landlord and tenant law
  193. 50Operational land for purposes of the 1990 Act
  194. 51Defence to proceedings in respect of statutory nuisance
  195. 52Protection of interests
  196. 53Saving for Trinity House
  197. 54Disapplication of regulation 60 of the Conservation (Natural Habitats, &c.) Regulations 1994
  198. 55Planning, etc. jurisdiction
  199. 56Certification of plans etc
  200. 57Arbitration
  201. Part edule A: AUTHORISED PROJECT
  202. Part 1AUTHORISED DEVELOPMENT
  203. Part 2ANCILLARY WORKS
  204. edule BSTREETS SUBJECT TO STREET WORKS
  205. Part edule C: STREETS TO BE STOPPED UP
  206. Part 1STREETS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
  207. Part 2STREETS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
  208. edule DSTREETS TO BE TEMPORARILY STOPPED UP
  209. edule EACCESS TO WORKS
  210. edule FLAND OF WHICH ONLY SUBSOIL MORE THAN 9 METRES BENEATH SURFACE MAY BE ACQUIRED
  211. edule GLAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
  212. edule HDEEMED CONSENT UNDER COAST PROTECTION ACT 1949
  213. edule IDEEMED LICENCE UNDER THE FOOD AND ENVIRONMENT PROTECTION ACT 1985
  214. edule JTREES SUBJECT TO TREE PRESERVATION ORDERS
  215. edule KLIMITS OF HARBOUR
  216. edule LPROTECTIVE PROVISIONS
  217. Schedule 4: Model provisions in respect of requirements
  218. 1Interpretation
  219. 2Time limits
  220. 3Stages of authorised development
  221. 4Detailed design approval
  222. 5Detailed design approval
  223. 6Detailed design approval
  224. 7Provision of landscaping
  225. 8Implementation and maintenance of landscaping
  226. 9Trees
  227. 10Highway accesses
  228. 11Public rights of way
  229. 12Fencing – special roads
  230. 13Fencing and other means of enclosure
  231. 14Surface water drainage
  232. 15Contaminated land and groundwater
  233. 16Archaeology
  234. 17Ecological management plan
  235. 18Code of construction practice
  236. 19Code of construction practice
  237. 20Design of roads
  238. 21External lighting
  239. 22Construction traffic
  240. 23Control of noise during construction and maintenance
  241. 24Construction hours
  242. 25Control of noise during operational phase
  243. 26Control of odour emissions
  244. 27Control of artificial light emissions
  245. 28Control of dust emissions
  246. 29Control of smoke emissions
  247. 30Control of steam emissions
  248. 31Control of insects
  249. 32Accumulations and deposits
  250. 33Travel plan
  251. 34European protected species
  252. 35Restoration of land used temporarily for construction
  253. 36Requirement for written approval
  254. 37Amendments to approved details
  255. 38Requirement for consent of Civil Aviation Authority and Ministry of Defence
  256. Explanatory note