Paragraph 2 Authorised development to be carried out in accordance with certified plans and documents and with matters approved under requirementsI1

England and Wales

(1)

The authorised development must be carried out in accordance with–

(a)

the plans and documents certified by the Secretary of State as true copies of the documents referred to in this Order;

(b)

subject to requirement 20, any other plans, schemes or documents approved in writing by the relevant planning authority pursuant to the requirements; and

(c)

the parameters specified in Tables 1 – 11 below.

(2)

In these tables “AOD” means above ordnance datum.

Table 1

Gas Processing plant (Work No.14)

Building or structure (part of Work No.14)Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 33-34 metres AOD)Minimum height (metres above existing site level of approximately 33-34 metres AOD)
Control room workshop30.040.05.0
Substation20.025.04.0
Instrument room (DCS)6.08.04.0
Compressor house (2 off)20.028.010.0
First gas fill compressor and cooler package6.028.07.0
Motor coolers (10 off)6.08.04.0
Gas coolers18.022.05.0
Drying towers (4 off)4.04.010.0
Air cooled condensers (2 off)6.08.04.0
Regeneration heaters (6 off)12.06.05.0
Water heater buildings (2 off)10.025.08.0

Transformers

/VSD’s (5 off)

6.015.05.0
Glycol storage (2 off)15.021.04.0
Gas Preheater Boiler Vents (4 off)

0.8 (external diameter)

0.69 (internal diameter)

–10.010.0
Glycol Regeneration Boiler Vents (6 off)

0.8 (external diameter)

0.22 (internal diameter)

–10.010.0
Emergency cold vent0.60(Diameter)–25.025.0

Table 2

Solution mining compound (Work Nos 4 & 23)

Building or structure (part of Work No.4 or 23)Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 37-38 metres AOD)Minimum height (metres above existing site level of approximately 37-38 metres AOD)
Pumphouse for both weak brine and water booster pumps12.565.04.0
Pump switchrooms (2 off)10.020.03.5
Control and amenities building10.014.03.5
Distributed control system building6.08.03.5
Electrical compound/switchroom (Work No 23)20.025.03.5
Liquid nitrogen storage vaporisation package8.016.03.0
Liquid nitrogen storage compound10.020.04.0
Brine de-gassing tanks (2 off)15.020.04.0
Within concrete bund20.025.03.5
Nitrogen vent0.08 (Diameter)9.05.0

Table 3

Gas marshalling compounds (Work Nos 20 & 21)

Building or structure (Part of work no.20 or 21)Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level 0f approximately 37-38 metres AOD for work no.20 and 40 metres AOD for work no.21)Minimum height (metres above existing site level of approximately37-38 metres AOD for work no.20 and 40 metres AOD for work no.21)
Compound with security fence and building listed below:50.050.03.02.4
Control kiosk3.04.02.4
Security lighting/camera1.0 (diameter)5.53.0

Table 4

Electrical 132kV to 33kV sub-station (Work No.25)

Building or structure (Part of work no.25)Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 37-38 metres AOD)Minimum height (metres above existing site level of approximately 37-38 metres AOD)
Compound with security fence for all equipment listed below:50.080.03.02.4
Transformers (2 off)5.012.07.0
Isolators (5 off)2.56.06.5
Power correction equipment2.53.04.0
Control room12.08.03.6
Switchroom12.020.03.6

New 132kV pylon (1 off)

(Adjacent to existing pylon)

5.0 at base

Arms =14.0

5.0 at base28.0

Table 5

Wellhead compound—drilling phase (Work Nos 2A to 2U)

Building or structure

Part of work no.2A to 2U)

Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 33-34 metres AOD)Minimum height (metres above existing site level of approximately 33-34 metres AOD)
Compound for equipment listed below:60.080.02.42.0
Drilling rig (vehicle mounted)3.015.036.0
Cement silos (2 off)2.02.06.0

Table 6

Wellhead compound—solution mining phase (Work Nos 2A to 2U)

Building or structure

Part of work no.2A to 2U)

Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 33-34 metres AOD)Minimum height (metres above existing site level of approximately 33-34 metres AOD)
Compound and security fence for equipment listed below:50.050.024.02.0
Solution mining wellhead1.01.02.0
Meter house2.53.02.5

Table 7

Wellhead compound—gas operation phase (Work Nos 2A to 2U)

Building or structure

Part of work no.2A to 2U)

Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 33-34 metres AOD)Minimum height (metres above existing site level of approximately 33-34 metres AOD)
Compound with security fence for equipment listed below:50.050.03.02.0
Gas wellhead1.01.04.0
Control panel3.04.03.0
Glycol injection package3.04.04.0
Security lighting/camera1.0 (Diameter)5.53.0

Table 8

Lostock works (Work No.9)

Building or structure

Part of work no.9)

Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 30 metres AOD)Minimum height (metres above existing site level of approximately 30 metres AOD)
Pumping tank6.0 (Diameter)6.0
Surge vessel (in bund)2.57.03.0

Table 9

Whitley pumping station (Work No.11)

Building or structure

Part of work no.11)

Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 50 metres AOD)Minimum height (metres above existing site level of approximately 50 metres AOD)
Existing pumphouse (to be refurbished)10.012.04.0
Surge vessel1.5(Diameter)3.52.5
Transformer3.04.02.5

Table 10

Runcorn site (Work No.10)

Building or structure

Part of work no.10)

Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 10.5 metres AOD)Minimum height (metres above existing site level of approximately 10.5 metres AOD)
Pipebridge with walkway5.050.015.518.0
Brine discharge pipeline0.5(Diameter)600.0
Diffuser pipe0.4(Diameter)15.0

Table 11

National transmission system compound (Work No.12)

Building or structure

Part of work no.12)

Maximum width (metres)Maximum length (metres)Maximum height (metres above existing site level of approximately 32metres AOD)Minimum height (metres above existing site level of approximately 32 metres AOD)
Compound with security fence for equipment listed below:50.060.03.02.4
Pig trap area8.017.02.4
Control equipment kiosk3.04.02.4
Meter cabinet0.61.51.5
Security lighting/camera1.0(Diameter)6.03.0

Annotations

Commencement

I1

Sch. 2 para. 2 in force at 5.4.2017, see art. 1