Schedule 7 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKENI1
England and Wales
(1) Plot Reference Number shown on Land Plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development |
|---|---|---|
| Land Plans – Sheet 1 | ||
| 1/6 | The main site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials. | All works |
| 1/14 | Required for works to tie in the B2039 Ockham Road North to the improved A3 Ockham Park junction. | Work No.31(c), Work No.31(h) |
| 1/30, 1/31 | For works relating to the improvement of Mill Lane at the tie-in with the A3 northbound on-slip and construction of a drainage attenuation pond. | Work No.31(e), Work No.31(d), Work No.52(a) |
| Land Plans – Sheet 2 | ||
| 2/1 | For the provision of a topsoil and materials storage and processing area, structures worksite, traffic management area, welfare facilities and for the construction of a bridleway. | All Works Work No.34 |
| 2/1a | To provide working space for the construction of a highway, a bridleway and a highway fence. | Work No.33, Work No.63(a) |
| 2/1b | To provide working space for the construction of a highway, a bridleway and highway fence. | Work No.33 |
| 2/2, 2/4 | For the provision of a topsoil and materials storage area, structures worksite, traffic management area and welfare facilities. | All Works |
| 2/3 | For the provision of a topsoil and materials storage and a structures worksite, traffic management area, welfare facilities and for the construction of a bridleway. | All Works Work No.34 |
| 2/5a | To provide working space for the construction of a highway and bridleway. | Work No.33 |
| 2/5c | For the construction of a bridleway. | Work No.34 |
| 2/6 | For the provision of a topsoil and materials storage area, structures worksite, traffic management area, welfare facilities and for the construction of a bridleway. | Work No.34 All Works |
| 2/11 | To provide working space for a utility diversion. | Work No.33, Work No.63(a) |
| 2/13 | For the construction of a highway and utilities diversion. | Work No.33, Work No.63(a) |
| 2/21, 2/21a | For the improvement and widening of the A3 northbound and to provide working space for the construction of a retaining wall and utility diversion. | Work No.2, Work No.64(a) |
| 2/26 | To provide working space and access for the realignment of Wisley Lane and diversion of a footpath. | Work No.33(e), Work No.33(h) |
| 2/27a | To provide working space and access for the realignment of Wisley Lane. | Work No.33(e) |
| 2/28 | To provide working space and access and to allow the construction of a temporary road. | Work No.33(e), Work No.33(f), Work No.33(g), Work No.65(c) |
| 2/28b | To provide working space and access during modifications to the entrance to RHS Garden Wisley and utility diversions. | Work No.33(e), Work No.33(f), Work No.33(g), Work No.62(c), Work No.65(c) |
| 2/30 | To provide working space and access and remediation of redundant carriageway. | Work No.33(e) |
| 2/31, 2/32 | To provide sufficient working space and access for the realignment of Wisley Lane and diversion of a footpath. | Work No.33(e), Work No.33(h) |
| 2/33 | To provide working space and access for diversion of a footpath. | Work No.33(h) |
| Land Plans – Sheet 3 | ||
| 3/3, 3/3c | To provide working space to construct a bridleway and utility diversion. | Work No.35, Work No.63(a) |
| 3/7 | To provide working space to construct a bridleway, utility diversions, gantry, highways fence and for the improvement and widening of the A3 northbound. | Work No.1(c), Work No.23(c), Work No.35, Work No.63(a), Work No.64(a) |
| 3/13a | To provide working space for utility diversion. | Work No.63(a) |
| 3/19b | To provide working space for the improvement of A3 southbound, works to a watercourse and access for environmental mitigation and enhancement works. | Work No.5(c), Work No.5(d), Work No.36, Work No.53(b), Work No.55 |
| 3/24 | To provide working space to construct a bridleway, utility diversions, gantry, highways fence and for the improvement and widening of the A3 northbound. | Work No.1(c), Work No.23(c), Work No.35, Work No.63(a), Work No.64(a) |
| 3/33 | To provide working space to construct a bridleway, a utility diversion, and for environmental mitigation works. | Work No.35, Work No.63(a), Work No.56 |
| 3/34 | To provide working space to construct a bridleway, utility diversion and highway fence. | Work No.35, Work No.63(a) |
| 3/37a | To provide working space to extend a culvert, construct a utility diversion and a highway fence. | Work No.1(e), Work No.63(a) |
| Land Plans – Sheet 4 | ||
| 4/3, 4/3b | To provide working space to construct a bridleway, a utilities diversion and for environmental mitigation works. | Work No.35, Work No.56, Work No.63(a) |
| 4/3a | To provide sufficient working space and access to construct a new maintenance access and bridleway, to divert a gas pipeline and associated equipment, to build a highway fence and to construct a filter drain. | Work No.35, Work No.63(a) |
| 4/4c | To provide working space to construct a bridleway, a utility diversion, a highways fence and for the improvement and widening of the A3 northbound. | Work No.1(c), Work No.35, Work No.63(a) |
| 4/15b | To provide working space for the alteration of the A3 southbound on-slip, improvement of junction of Old Lane, a utility diversion and construction of a highways fence. | Work No.4, Work No.65(a) |
| 4/19 | To provide working space for the construction of a bridleway, stopping up of existing accesses and improvement of junction of Old Lane. | Work No.4, Work No.35(d) |
| 4/22 | To provide working space to construct a bridleway and footpath. | Work No.35, Work No.35(b), Work No.35(d) |
| 4/22a | To provide working space for the realignment of the access points to Ockham Common Car Park and to construct a bridleway and soakaway. | Work No.35(d) |
| 4/24 | To provide working space for the realignment of the access points to Ockham Bites Café and Ockham Common Car Park, the construction of a bridleway, the alteration and widening of the A3 southbound on-slip, the construction of an environmental barrier and highways fence and a utility diversion. | Work No.4, Work No.35(d), Work No.65(a), Work No.61(d) |
| 4/25 | To provide working space for the alteration and widening of the A3 southbound on-slip, improvement of junction of Old Lane and utility diversions | Work No.4, Work No.62(f), Work No.65(a) |
| 4/27 | To provide working space to construct a bridleway. | Work No.35(d) |
| 4/30a | To provide working space for the alteration and widening of the A3 southbound on-slip, demolition of the Cockcrow overbridge, the construction of bridleway, environmental barrier and utilities diversion. | Work No.4, Work No.35(b), Work No.35, Work No.61(d), Work No.65(a) |
| 4/32, 4/33 | To provide working space to construct a bridleway and footpath. | Work No.35, Work No.35(b) |
| 4/35 | To provide working space for the alteration and widening of the A3 southbound on-slip, demolition of the Cockcrow overbridge, the construction of bridleway, environmental barrier and utility diversion. | Work No.4, Work No.35, Work No.61(d), Work No.65(a) |
| 4/40, 4/40a | To provide working space to construct a bridleway, a utility diversion, and to construct an access to a drainage attenuation pond. | Work No.35(b), Work No.35(c), Work No.63(a), Work No.52(e) |
| 4/42 | To provide working space to construct a bridleway, a drainage attenuation pond and a soakaway. | Work No.35, Work No.52(f) |
| 4/45, 4/45a | To provide working space for the widening of the A3 northbound, construction of a gantry, bridleway, utility diversions and a highways fence. | Work No.1(c), Work No.23(d), Work No.35, Work No.62(e), Work No.63(a), Work No.64(b), Work No.65(d) |
| 4/46a, 4/46b | To provide working space to construct a bridleway and utility diversion. | Work No.35, Work No.63(a) |
| 4/48, 4/49, 4/49b | To provide working space to construct a bridleway and realignment to a private means of access. | Work No.35(c) |
| 4/48b | To provide working space to construct a bridleway, realignment to a private means of access and soakaway. | Work No.35(c) |
| 4/52a | For use as a construction access route. | All Works |
| 4/57 | To provide working space to construct a bridleway and utilities diversion. | Work No.35(c), Work No.63(a) |
| 4/58 | To provide working space and access to construct a bridleway, utilities diversion, environmental barrier and improvement of the A3 northbound carriageway. | Work No.1(c), Work No.35(c), Work No.63(a), Work No.61(a) |
| 4/62 | To provide working space to construct utilities diversion, environmental barrier and improvement of the A3 northbound carriageway. | Work No.1(c), Work No.63(a), Work No.61(a) |
| 4/64, 4/65, 4/66, 4/66a | To provide working space to construct a utility diversion and to construct an access to a drainage attenuation pond. | Work No.63(a), Work No.52(e) |
| 4/69 | For the provision of a structures worksite. | Work No.35(b) |
| 4/74, 4/76, 4/78, 4/78a, 4/79, 4/80 | To provide working space to construct an access to a drainage attenuation pond. | Work No.52(e) |
| 4/81, 4/81a | To provide working space to construct a utility diversion and to construct an access to a drainage attenuation pond. | Work No.63(a), Work No.52(e) |
| 4/84 | To provide working space to for the demolition of the Cockcrow overbridge, construction of a drainage attenuation pond, utilities diversions, environmental barrier and improvement of the A3 northbound carriageway. | Work No.1(c), Work No.63(a), Work No.61(a), Work No.35(b), Work No.52(e), Work No.61(a) |
| 4/88 | For the provision of a site compound and working space for the improvement of the A3 northbound off-slip and construction of a drainage attenuation pond. | All Works |
| Land Plans – Sheet 5 | ||
| 5/1 | For the provision of topsoil storage and to provide working space for the construction of a free-flow slip lane, alteration and widening of the M25 westbound off-slip, a bridleway, utilities diversions and environmental barrier. | Work No.11, Work No.28, Work No.35, Work No.62(f), Work No.61(d), Work No.65(a) |
| 5/2 | To provide working space to construct a bridleway and a drainage attenuation pond and fencing. | Work No.35, Work No.52(g) |
| 5/2a | To provide working space to construct a drainage attenuation pond and fencing. | Work No.52(g) |
| 5/7b | To provide working space for the construction of a free-flow slip lane, for the alteration and widening of the M25 eastbound on-slip and the construction of a bridleway, environmental barrier and the diversion or realignment of a watercourse. | Work No.10, Work No.26, Work No.35, Work No.53(f), Work No.61(c) |
| 5/9 | To provide working space to construct a bridleway, a diversion or realignment of a watercourse and to construct a drainage attenuation pond and fencing. | Work No.35, Work No.53(f), Work No.52(i) |
| 5/11 | For use as a construction access route. | All Works |
| 5/12 | To provide working space for the construction of a temporary slip road, free-flow slip lane, environmental barrier, for a utility diversion, improvement of the M25 westbound on-slip and for the diversion and/or realignment of a watercourse. | Work No.29, Work No.8, Work No.53(d), Work No.62(g), Work No.61(a) |
| 5/13 | To provide working space for the construction of a temporary slip road, free-flow slip lane, environmental barrier, for a utility diversion and improvement of A3 northbound off-slip. | Work No.3, Work No.8, Work No.62(g), Work No.61(a) |
| 5/22, 5/23 | To provide working space for the construction of a temporary slip road, free-flow slip lane, the improvement, realignment and widening of the M25 eastbound off-slip, the improvement, realignment and widening of the A3 northbound on-slip and the construction of an environmental barrier. | Work No.9, Work No.14, Work No.25, Work No.61(b) |
| 5/31 | To provide working space to construct a gantry. | Work No.23(f) |
| Land Plans – Sheet 6 | ||
| 6/2a, 6/12, 6/12a, | To provide working space to construct a bridleway. | Work No.35 |
| 6/5, 6/5a | For use as a structures worksite. | Work No.35(f) |
| 6/13, 6/13a, 6/13b, 6/14 | To provide working space to construct a bridleway. | Work No.39 |
| 6/18 | To provide working space for the improvement of the A3 southbound carriageway, works associated with stopping up an access to Painshill Park, to construct a retaining wall, a utility diversion and a highway fence. | Work No.17(a), Work No.17(b), Work No.17(e), Work No.65(a) |
| 6/21a, 6/21b | To provide working space for the improvement of the A3 southbound carriageway, to construct a retaining wall, a utility diversion and a highway fence. | Work No.17(a), Work No.17(b), Work No.23(h), Work No.65(a) |
| 6/22b | To provide working space for the improvement of the A3 southbound carriageway, to construct a retaining wall, a utility diversion and a highway fence. | Work No.17(a), Work No.17(b), Work No.65(a) |
| Land Plans – Sheet 7 | ||
| 7/6 | For the provision of a construction site compound. | All works |
| 7/12, 7/22 | For the provision of topsoil and materials storage. | All works |
| 7/13, 7/13a, 7/14 | To provide access and working space for a utility diversion. | Work No.63(c) |
| 7/23a, 7/28 | To provide working space for the improvement and widening of the A3 northbound off-slip, utility diversion and highway fence. | Work No.16, Work No.62(k) |
| Land Plans – Sheet 8 | ||
| 8/7a, 8/7b | To provide working space to construct a footpath, utilities diversions and highways fence. | Work No.41, Work No.62(l), Work No.63(c), Work No.65(a) |
| 8/27, 8/28, 8/29, 8/30 | To provide working space to improve the A245 Portsmouth Road at the tie-in with the A3 Painshill junction. | Work No.42(a), Work No.42(b) |
| 8/34 | To provide working space to improve the A3 southbound carriageway, the A3 Painshill junction and the A245 Portsmouth Road at the tie-in with the A3 Painshill junction. | Work No.17(a), Work No.42(a), Work No.42(b) |
| Land Plans – Sheet 9 | ||
| 9/4 | To provide working space to construct improvements to the A245 Byfleet Road westbound and eastbound carriageways and B365 Seven Hills Road, a dedicated slip road, a utility diversion and a highway fence. | Work No.44(a), Work No.44(e), Work No.44(f), Work No.45, Work No.47(a), Work No.62(p) |
| 9/4a | To provide working space to construct new private access to Feltonfleet School from B365 Seven Hills Road. | Work No.45, Work No.46 |
| 9/7 | To provide working space to construct improvements and widening to the A245 Byfleet Road westbound and eastbound carriageways, a dedicated slip road, stopping up of an access, utilities diversions and a highway fence. | Work No.44(a), Work No.44(b), Work No.44(c), Work No.44(d), Work No.44(e), Work No.44(f), Work No.47(a), Work No.47(b), Work No.62(p), Work No.62(o) |
| 9/8, 9/9, 9/10 | To provide working space and construct improvements to the A245 Byfleet Road eastbound carriageway. | Work No.47(a) |
| 9/12 | To provide working space for the improvement and widening of the A245 Byfleet Road eastbound carriageway and for the construction of a footway, utilities diversions and a highway fence. | Work No.47(a), Work No.47(b), Work No.47(e), Work No.62(q), Work No.64(k), Work No.65(h) |
| Land Plans – Sheet 11 | ||
| 11/1 | To provide working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip and the construction of an environmental barrier. | Work No.27(a), Work No.29, Work No.61(a) |
| 11/9, 11/9a | For the provision of topsoil and materials storage and working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip, the construction of a soakaway and an environmental barrier. | All Works |
| 11/10, 11/10a, 11/11 | For the provision of topsoil and materials storage and working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip, the construction of a soakaway and an environmental barrier. | All Works |
| 11/26 | To provide working space for the construction of a bridleway and drainage attenuation pond and fencing. | Work No.49, Work No.52(m) |
| Land Plans – Sheet 12 | ||
| 12/1d | To provide working space for the construction of a bridleway and drainage attenuation pond and fencing. | Work No.49, Work No.52(m) |
| 12/5 | To provide working space for the construction of a bridleway and demolition and replacement of existing Clearmount overbridge. | Work No.49 |
| 12/25a | To provide working space for the construction of a bridleway tie-in to an existing permissive signposted route. | Work No.49 |
| 12/25d | To provide working space for the construction of a new gas main diversion under the M25. | Work No.63(e) |
| Land Plans – Sheet 13 | ||
| 13/1 | To provide working space to construct a bridleway, a diversion or realignment of a watercourse and drainage ditch. | Work No.35(e), Work No.53(f) |
| 13/1a | To provide working space to construct a bridleway. | Work No.35(e) |
| F113/9 | For use as a construction compound. | All works. |
| Land Plans – Sheet 20 | ||
| 20/1a, 20/5 | For modifications to road signage. | Work No.33(i) |
| Land Plans – Sheet 23 | ||
| 23/2 | For modifications to the entrance to Orchard Cottage. | Work No.34 |
| 23/3 | To provide working space for the construction of a turning head on Elm Lane. | Work No.34 |
| 23/5, 23/6 | To provide access to construction of Work No.34. | Work No.34 |
| 23/7 | For modifications to the entrance to Orchard Cottage and to provide working space for the construction of a turning head on Elm Lane. To provide access to construction of Work No.34. | Work No.34 |
| Land Plans – Sheet 24 | ||
| 24/1 | To provide working space to tie-in Elm Lane to Elm Corner. | Work No.50(a) |
| 24/2 | For the improvement of Byway 525 (Byway Open to All Traffic), between Elm Corner and Old Lane. | Work No.50(a) |
| 24/3 | For the improvement of Byway 525 (Byway Open to All Traffic), between Elm Corner and Old Lane. To provide working space to tie-in Elm Lane to Hatch Lane. | Work No.50(a) |
| 24/4, 24/4a, 24/4b | To provide working space to tie-in Elm Lane to Old Lane and to install two toad underpasses and associated reptilian fencing along Old Lane. To provide working space to clear trees and other vegetation to create a visibility splay including road traffic mitigation measures | Work No.50(a) Work No.50(b) |
| Land Plans – Sheet 26 | ||
| 26/2a | To provide working space for the construction of a footpath. | Work No.51 |
Annotations
Textual amendments
- F1
Words in Sch. 7 inserted (19.1.2023) by The M25 Junction 10/A3 Wisley Interchange Development Consent (Correction) Order 2023 (S.I. 2023/46), arts. 1, 2(11)
Commencement
- I1
Sch. 7 in force at 2.6.2022, see art. 1