Schedule 10 LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKENI1
England and Wales
(1) Plot reference Number shown on Land Plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development |
|---|---|---|
| Land Plans – Sheet 2 | ||
| 2/3z, 2/58a, 2/58b, 2/59 | Required for provision of a temporary construction compound. | Works Nos. 3 ,6 and 70 |
| 2/52 | Temporary possession associated with the Solihull Road Overbridge and temporary alignments to ensure Solihull road remains open. | Work Nos. 3 and 70 |
| 2/2a | Required for the provision of temporary access to facilitate the construction works | Work Nos. 1 and 5 |
| 2/2c | Required for construction of a diversion to an existing local high pressure gas main; and to provide temporary access to land associated with the provision of environmental mitigation. | Work No. 55 |
| 2/3a | Required for construction of a new M42 off slip road and the demolition of an existing sheet pile wall. | Work No. 4 |
| 2/3c | Required for storage of earthworks and for the construction of a diversion to an existing local high pressure gas main. | Works Nos. 3 and 55 |
| 2/3d | Required for construction of a new M42 off slip road and the demolition of an existing sheet pile wall and to provide temporary access to land associated with environmental mitigation. | Work No. 4 |
| 2/3g, 2/3h, 2/3i, 2/3j, 2/3p, 2/3r, 2/22 | Required to provide temporary access to land associated with the provision of environmental mitigation. | Work Nos. 3, 4 and 5 |
| 2/3o, 2/10c, 2/29, 2/30 | Required for construction of diversions to existing utilities apparatus and equipment. | Work No. 3 |
| 2/3u, 2/3ah | Required for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for construction of a reinforced cover slab for an existing fuel pipeline. | Works Nos. 56, 62 and 66 |
| 2/3w | Required for construction of a temporary two lane single carriageway; and for the stockpiling of construction materials. | Work No. 70 |
| 2/3aa | Required for access to drainage attenuation and treatment systems; for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for the stockpiling of construction materials. | Works No. 33, 56 and 62 |
| 2/3ab | Required for construction of a temporary merge onto the M42 for construction vehicles; and for the stockpiling of construction materials. | All Works |
| 2/10a, 2/10b, 2/11 | Required for lining and signing works. | All Works |
| 2/62a | Required for construction of realigned B4438 Catherine- de- Barnes Lane. | Work No. 11 |
| 2/65 | Required for construction of a temporary southbound diverge for construction traffic. | All Works |
| 2/76a | Required for temporary access to land associated with alteration works to the existing Warwickshire Gaelic Athletic Association facilities. | Work No. 68 |
| Land Plans – Sheet 3 | ||
| 3/3d, 3/51a, 3/57, 3/58a | Required for the stockpiling of construction materials. | All Works |
| 3/4b | Required for access to drainage attenuation and treatment systems; for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for the stockpiling of construction materials. | Works No. 33, 56 and 62 |
| 3/4f | Required for access to drainage attenuation and treatment systems; and for the stockpiling of construction materials. | Work No. 33 |
| 3/15a, 3/15c,3/15e | Required for temporary access to land associated with alteration works to the existing Warwickshire Gaelic Athletic Association facilities. | Work No. 68 |
| 3/22a, 3/22b | To access land to be used in connection with the provision, maintenance and retention of mitigation within Bickenhill Meadows SSSI – Shadowbrook Meadows unit | Work No. 76 |
| 3/32b, 3/32c | To access land in connection with the monitoring of the Bickenhill Meadows SSSI – Shadowbrook Meadows unit. | All Works |
| 3/23, 3/73f | Required for construction of diversions to existing utilities apparatus and equipment. | All Works |
| 3/73d | Required for construction of diversions to existing utilities apparatus and equipment. | Work No. 69 |
| Required for the provision of a temporary construction compound. | All Works | |
| 3/25 | Required for access to land associated with the provision of environmental mitigation within the Bickenhill Meadows SSSI – Shadowbrook Meadows unit. | Work No.76 |
| For construction of diversions to existing utilities apparatus and equipment. | All Works | |
| 3/30 | Required for access to construct a diversion to a private means of access. | Work No.17 |
| 3/87a, 3/87b | Required for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus. | Works Nos. 57, 64 and 65 |
| Land Plans – Sheet 4 | ||
| 4/1a, 4/1i, 4/1ad, 4/1af, 4/1ag, 4/1ah, 4/1ai, 4/1ak, 4/1al, 4/3r, 4/146 | Required for signage installation. | All Works |
| 4/1c, 4/1bf, 4/3b, 4/3c, 4/3ai, 4/3aj, 4/3s, 4/3x, 4/6n, 4/6p, 4/10 | Required for construction of a new free flow link road; and for the construction of a footway/cycleway; and for the construction of a diversion to an existing medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment. | Works Nos. 21, 45 and 59 |
| 4/1d | Required for construction of improvements to the existing Clock Interchange; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange. | Work No. 20 |
| 4/1f | Required for construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for alterations to the existing Bickenhill Lane carriageway; and for construction of diversions to existing utilities apparatus and equipment. | Works Nos. 22, 23 and 24 |
| 4/1g | Required for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for access to and over land to be used for the construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for construction of diversions to existing utilities apparatus and equipment. | Works Nos. 20 and 22 |
| 4/1h, 4/3ab | Required for access to construct a new free flow link road; and for construction of a diversion to an existing medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment. | Works Nos. 2, 21 and 59 |
| 4/1k | Required for the realignment of Public Right of Way M106; and for access and construction of a diversion to an existing medium pressure gas main. | Works Nos. 53 and 60 |
| 4/1m, 4/1s, 4/1x, 4/1ap, 4/1bb, 4/3f, 4/3g, 4/62, 4/71, 4/147 | Required for lining and signing works; and for construction of diversions to existing utilities apparatus and equipment. | Work No. 19 |
| 4/1n | Required for lining and signing works; and for access and construction of a diversion to a medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment. | Works Nos. 19 and 60 |
| 4/1p, 4/25c | Required for access to monitor existing drainage attenuation features. | Work No.20 |
| 4/1q, 4/3h, 4/3k, 4/3m | Required for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for construction of diversions to existing utilities apparatus and equipment. | Work No. 20 |
| 4/1r | Required for access to construct a pedestrian overbridge; and for construction of a diversion to a medium pressure gas main. | Works Nos. 39 and 60 |
| 4/1t, 4/1u | Required for signage installation and the construction of diversions to existing utilities apparatus and equipment. | Work No.2 |
| 4/1v, 4/1am, 4/3j, 4/3ae, 4/4n, 4/4v, 4/4x, 4/25b, 4/25d, 4/25s, 4/73, 4/76, 4/151, 4/152, 4/153 | Required for access and construction of diversions to existing utilities apparatus and equipment. | All Works |
| 4/1w, 4/3e; 4/3o, 4/3p, 4/6e, 4/6f, 4/6g, 4/6h, 4/25e, 4/25g, 4/25l, 4/25n, 4/66, 4/89, 4/91, 4/93, 4/94, 4/99, 4/102, 4/106, 4/109, 4/150, 4/155 | Required for lining and signing works; and for access and construction of diversions to existing utilities apparatus and equipment. | Work No. 2 |
| 4/1z | Required for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for access to and over land to be used for the construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road. | Works Nos. 20 and 22 |
| 4/1aa, 4/1ab, 4/1ac, 4/1ax, 4/3ad | Required for temporary access to construct a realignment of the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road. | Work No. 22 |
| 4/1ao, 4/7b | Required for temporary access to construct alterations to the existing Bickenhill Lane carriageway; and for drainage. | Work No. 24 |
| 4/1aq, 4/1bc | Required for access and construction of a realignment to an existing private means of access; and for access and construction of environmental mitigation; and for monitoring of attenuation devices. | Work No. 21 |
| 4/1as | Required for lining and signing works; and for construction of diversions to existing utilities apparatus and equipment. | Work No. 2 |
| 4/1az, 4/1ba | Required for access and construction of a diversion to an existing aqueduct pipeline. | Work No. 63 |
| 4/2a, 4/2b, 4/2c, 4/2d, 4/3af, | Required for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus. | Works Nos. 57, 64 and 65 |
| 4/25f | Required for access and construction of improvements to the eastbound and westbound carriageway of the A45; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus. | Works Nos. 2, 57, 64 and 65 |
| 4/3d | Required for construction of improvements to the existing Clock Interchange; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange; and for construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for alterations to the existing Bickenhill Lane carriageway; and for construction of diversions to existing utilities apparatus and equipment. | Works Nos. 20, 22, 23 and 24 |
| 4/3i, 4/3l | Required for access and construction of diversions to existing utilities apparatus and equipment. | Work Nos. 2 and 20 |
| 4/3n | Required for temporary access to construct improvements to the existing Clock Interchange. | Work No. 20 |
| 4/3u, 4/3v, 4/3ag | Required for access to construct a new free flow single carriageway with hard shoulder; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus. | Works Nos. 26, 57, 64 and 65 |
| 4/3y | Required for access and construction of improvements to the existing Clock Interchange; and for construction of a new free flow link road; and for construction of diversions to existing utilities apparatus and equipment; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange. | Works Nos. 20 and 21 |
| 4/3ah, 4/4u, 4/25q, 4/25u, 4/160 | Required for access to and construction of a diversion to an existing aqueduct pipeline; and for access to and construction of diversions to existing utilities apparatus and equipment. | Work No. 63 |
| 4/4g, 4/4k | Required for provision of a temporary construction compound, [to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste]; and for the realignment of Public Right of Way M106; and for construction of diversions to existing utilities apparatus and equipment. | Works Nos. 53 and 69 |
| 4/4w | Required for provision of a temporary construction compound, [to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste]; and for access and construction of a diversion to an existing aqueduct pipeline; and for the realignment of Public Right of Way M106; and for construction of diversions to existing utilities apparatus and equipment. | Works Nos. 53, 63 and 69 |
| 4/6a | Required for construction of a new free flow link road; and for the construction of a footway/cycleway; and for the construction of a diversion to an existing medium pressure gas main; and for construction of a diversion to an existing aqueduct pipeline; and for construction of diversions to existing utilities apparatus and equipment. | Works Nos. 21, 45, 59 and 63 |
| 4/6b | Required for access and construction of diversions to existing electric lines, cables, equipment and apparatus; and for access and construction of an extension to an existing culvert. | Works Nos. 57, 64 and 65 |
| 4/6d | Required for construction of a pedestrian overbridge; and for access and construction of a diversion to an existing medium pressure gas main; and for access and construction of an extension to an existing culvert; and for the construction of diversions to existing electric lines, cables, equipment and apparatus. | Works Nos. 39, 57, 60, 64 and 65 |
| 4/7a | Required for alterations to the existing Bickenhill Lane carriageway; and for the construction of diversions to existing electric lines, cables, equipment and apparatus. | Works Nos. 23 and 24 |
| 4/9 | Required for lining and signing works; and for access and construction of a diversion to a medium pressure gas main; and for access and construction of diversions to existing utilities apparatus and equipment. | Works Nos. 2 and 59 |
| 4/11b | Required for access to construct a pedestrian overbridge across the A45. | Work No. 39 |
| 4/25a, 4/69, 4/80 | Required for access and construction of improvements to the existing Clock Interchange; and for construction of diversions to existing utilities apparatus and equipment; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange. | Work No. 20 |
| 4/11a, 4/25i, 4/25m | Required for access and construction of a cantilever gantry; and for lining and signing; and for access and construction of diversions to existing utilities apparatus and equipment. | Work No. 2 |
| 4/25j, 4/25o and 4/25p | Required for construction of a cantilever gantry and demolition of a portal gantry; and for access and construction of a pedestrian overbridge; and for lining and signing works; and for access and construction of diversions to existing utilities equipment and apparatus. | Works Nos. 2 and 39 |
| 4/59 | Required for lining and signing; and for access to and construction of a new free flow link road; and for access to and construction of a realignment to a private means of access. | Works Nos. 2 and 21 |
| 4/82 | Required for lining and signing works; and for access to and construction of a pedestrian overbridge; and for access to and construction of a diversion to an existing medium pressure gas main; and access to and construction of diversions to existing utilities apparatus and equipment. | Works Nos. 2, 39 and 60 |
| 4/149 | Required for lining and signing works; and for access to and construction of a diversion to an aqueduct pipeline; and for access to and construction of diversions to existing utilities apparatus and equipment. | Works Nos. 2 and 63 |
| 4/156 | Required for lining and signing works; and for access to and construction of a new free flow link; and for access to and construction of a footway/cycleway; and for access to and construction of a diversion to a medium pressure gas main; and for access to and construction of diversions to existing utilities apparatus and equipment. | Works Nos. 2, 21, 45, 59 and 63 |
| 4/158, 4/159 | Required lining and signing in connection with Airport Way connector road; and for access to and construction of a free flow link road; and for access to and construction of a diversion to a medium pressure gas main; and for access to and construction of diversions to existing utilities apparatus and equipment. | Works Nos. 21 and 59 |
| Land Plans – Sheet 5 | ||
| 5/1a, 5/1b | Required for access to and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus. | Works Nos. 57, 64 and 65 |
| 5/7 | Required for lining and signing works; and for access and construction of diversions to existing utilities apparatus and equipment. | Work No. 2 |
| 5/29b, 5/29c, 5/29h, 5/29t, 5/29u and 5/29y | Required for access to construct a new free flow single carriageway with hard shoulder; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus. | Works Nos. 26, 57, 64 and 65 |
| 5/29p, 5/29r | Required for removal of existing East Way Roundabout. | Work No. 30(a) |
| 5/62 | Required for lining and signing works. | Work No. 31 |
| Land Plans – Sheet 6 | ||
| 6/2c | Required for access to and construction of a new free flow single carriageway. | Work No. 26 |