OpenLegislation

Schedule 1E ACTIVE ELECTRICAL ENERGY METERS (MI-003) (Annex V to the Directive)F1

England, Wales and Scotland

F1The relevant requirements of Schedule 1A, the specific requirements of this Schedule and the conformity assessment procedures listed in this Schedule, apply to active electrical energy meters.

  1. 1Accuracy
  2. 2Rated operating conditions
  3. 3MPEs
  4. 4Paragraph 4
  5. 4.1Paragraph 4.1
  6. 4.2Effect of disturbances of long duration
  7. 4.3Permissible effect of transient electromagnetic phenomena
  8. 4.3.1Paragraph 4.3.1
  9. 4.3.2Paragraph 4.3.2
  10. 5Suitability
  11. 5.1Paragraph 5.1
  12. 5.2Paragraph 5.2
  13. 5.3Paragraph 5.3
  14. 5.4Running with no load
  15. 5.5Starting
  16. 6Units
  17. 7Putting into use

Annotations

Textual amendments

F1

Schs. 1A-1K inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 49 (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)

F1

Schs. 1A-1K inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 49 (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)