Schedule 1E ACTIVE ELECTRICAL ENERGY METERS (MI-003) (Annex V to the Directive)F1
England, Wales and Scotland
F1The relevant requirements of Schedule 1A, the specific requirements of this Schedule and the conformity assessment procedures listed in this Schedule, apply to active electrical energy meters.
- 1Accuracy
- 2Rated operating conditions
- 3MPEs
- 4Paragraph 4
- 4.1Paragraph 4.1
- 4.2Effect of disturbances of long duration
- 4.3Permissible effect of transient electromagnetic phenomena
- 4.3.1Paragraph 4.3.1
- 4.3.2Paragraph 4.3.2
- 5Suitability
- 5.1Paragraph 5.1
- 5.2Paragraph 5.2
- 5.3Paragraph 5.3
- 5.4Running with no load
- 5.5Starting
- 6Units
- 7Putting into use
Annotations
Textual amendments
- F1
Schs. 1A-1K inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 49 (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F1
Schs. 1A-1K inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 49 (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)