Paragraph 2 Detailed design approvalI1
England, Wales and Scotland
The authorised development must be carried out in accordance with the approved plans listed in Table 1 below, inclusive of any limits of deviation, and any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authorities pursuant to any requirement (as the same may be amended by approval of the relevant planning authorities pursuant to requirement 19)—
Table 1
| Works plans |
| Rights of way, streets and access plan |
| The access road visibility splay plan |
The authorised development must be carried out in accordance with the parameters specified below (as the same may be amended by approval of the relevant planning authorities pursuant to requirement 19)—
F1Table 2
| Building or structure | Maximum height (metres above existing site level of approximately 31.5 metres AOD unless otherwise stated) | Minimum height (metres above existing site level of approximately 31.5 metres AOD unless otherwise stated) | Maximum length (metres) | Minimum length (metres) | Maximum width (metres) | Minimum width (metres) |
|---|---|---|---|---|---|---|
| The gas turbine generator (including gas turbine, generator, air inlet filter house, air inlet duct, exhaust diffuser, and auxiliaries such as lube oil system, air dryers, fuel gas filter package, instrument air system, compressor washing) (Part of numbered work 1A) | 27 | – | 50 | – | 40 | – |
| The exhaust gas emission flue stack (part of numbered work 1A) | 35 | 32.5 | 12 | – | 12 | – |
| Control room/office/ workshop (part of numbered work 1B) | 7 | – | 45 | – | 25 | – |
| Emergency generator (part of numbered work 1B) | 6 | – | 13 | – | 5 | – |
| Raw/fire water tank (part of numbered work 1B) | 15 | – | 15 | – | 15 | – |
| Demineralised water tank (part of numbered work 1B) | 5 | – | 5 | – | 5 | – |
| Gas receiving station (including compression station, emergency generator, Joule-Thompson boilers and other auxiliary control cabinets) (part of numbered work 1B) | 10 | – | 70 | – | 50 | – |
| Fin Fan Cooler(s) (part of numbered work 1A) | 10 | – | 28 | – | 14 | – |
| Transformer compound (including generator step up transformer, unit and other transformers, overhead line gantry and associated equipment) (part of numbered work 1C) | 15 | – | 65 | – | 60 | – |
| Gatehouse (part of numbered work 1D) | 4.5 | – | 9 | – | 8 | – |
| Above ground installation (numbered work 3A)* | 3 | – | 85 | – | 35 | – |
| Pipeline inspection gauge facility (part of numbered work 3A)* | 3 | – | 35 | – | 30 | – |
| Minimum offtake connection (part of numbered work 3A)* | 3 | – | 35 | – | 35 | – |
| Substation (including the auxiliary building) (part of numbered work 6)** | 14 | – | 100 | – | 60 | – |
* Existing site level is approximately 70m AOD ** Existing site level is approximately 49m AOD
To the extent that design principles for any numbered work are set out in the design principles statement, that numbered work must be designed substantially in accordance with the relevant design principles set out therein.
Except to the extent approved pursuant to requirement 5, numbered works 1, 3AF2... and 6(a) must not commence until, for that numbered work, details of the layout, scale and external appearance of the numbered work have been submitted to and approved by the relevant planning authorities.
Annotations
Textual amendments
- F1
Sch. 2 para. 2 Table 2 substituted (9.4.2020) by The Millbrook Gas Fired Generating Station (Amendment) Order 2020 (S.I. 2020/413), arts. 1, 4(2), Sch. 1
- F2
Word in Sch. 2 para. 2(4) omitted (9.4.2020) by virtue of The Millbrook Gas Fired Generating Station (Amendment) Order 2020 (S.I. 2020/413), arts. 1, 4(3)
Commencement
- I1
Sch. 2 para. 2 in force at 3.4.2019, see art. 1