The Morgan Offshore Wind Project Generation Assets Order 2025
S.I. 2025/1012 · Made 29 August 2025 · Extends to England and Wales
Infrastructure Planning
Made 29th August 2025
Coming into force 22nd September 2025
An application has been made to the Secretary of State under section 37 of the Planning Act 2008f1 (“the 2008 Act”) for an Order granting development consent.
The application was examined by a panel of three members (appointed by the Secretary of State) in accordance with Part 6 of the 2008 Act and carried out in accordance with the Infrastructure Planning (Examination Procedure) Rules 2010f2.
The panel, having considered the representations made and not withdrawn and the application together with the accompanying documents, in accordance with section 74(2) of the 2008 Act, has submitted a report and recommendation to the Secretary of State.
The Secretary of State has considered the representations made and not withdrawn, and the report and recommendation of the panel, has taken into account the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f3, and, as a national policy statement as effect in relation to the proposed development, has had regard to the documents and matters referred to in section 104(2) of the 2008 Act.
The Secretary of State, having decided the application, has determined to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application.
The Secretary of State, in exercise of the powers conferred by sections 114, 115, 120, 140 and 149A and schedule 5 to the 2008 Act, makes the following Order.
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Section 37 was amended by section 128(2) and Schedule 13, Part 1, paragraphs 1 to 5 of the Localism Act 2011 (c. 20).
- f2
-
S.I. 2010/103. This instrument was amended by S.I. 2012/635.
- f3
Contents
- Part 1: Preliminary
- 1Citation and commencement
- 2Interpretation
- Part 2: Principal Powers
- 3Development consent etc. granted by the Order
- 4Operation of generating station
- 5Deemed marine licences under the 2009 Act
- 6Power to maintain the authorised project
- 7Benefit of the Order
- Part 3: Miscellaneous and general
- 8Abatement of works abandoned or decayed
- 9Saving provisions for Trinity House
- 10Crown rights
- 11Certification of plans, etc.
- 12Service of notices
- Signature
- Schedule 1: Authorised Development
- Part 1: Authorised Development
- 1Paragraph 1
- 2Paragraph 2
- Part 2: Ancillary Works
- 3Paragraph 3
- Schedule 2: Requirements
- 1Time limits
- 2Design parameters
- 3Aviation safety
- 4St Anne’s and Lowther Hill Primary Surveillance Radar
- 5Operation of Warton Aerodrome (Air traffic services)
- 6Warton Aerodrome Primary Surveillance Rader
- 7Operation of Walney Aerodrome (Air traffic services)
- 8Air traffic services at Isle of Man Airport
- 9Operation of Blackpool Airport
- 10Decommissioning
- 11Requirement for written approval
- 12Amendments to approved details
- Schedule 3: Deemed Marine Licence under the 2009 Act – Licence 1: Wind Turbine Generators and Associated Infrastructure
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed marine activities
- 3Details of licensed marine activities
- 4Details of licensed marine activities
- 5Details of licensed marine activities
- 6Details of licensed marine activities
- 7Details of licensed marine activities
- 8Details of licensed marine activities
- 9Details of licensed marine activities
- Part 2: Conditions
- 10Design parameters
- 11Design parameters
- 12Design parameters
- 13Maintenance of the authorised scheme
- 14Extension of time periods
- 15Notifications and inspections
- 16Aids to navigation
- 17Colouring of structures
- 18Chemicals, drilling and debris
- 19Force Majeure
- 20Pre-construction plans and documentation
- 21Pre-construction plans and documentation
- 22Underwater Sound Management Strategy
- 23Low order unexploded ordnance clearance
- 24Marine Noise Registry
- 25Offshore safety management
- 26Reporting of engaged agents, contractors and vessels
- 27Pre-construction monitoring and surveys
- 28Construction monitoring
- 29Post-construction monitoring
- 30Reporting of scour and cable protection
- 31Completion of construction
- 32Requirement for written approval
- Schedule 4: Deemed Marine Licence under the 2009 Act – Licence 2: Offshore Substation Platforms and Interconnector Cables
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed marine activities
- 3Details of licensed marine activities
- 4Details of licensed marine activities
- 5Details of licensed marine activities
- 6Details of licensed marine activities
- 7Details of licensed marine activities
- 8Details of licensed marine activities
- 9Details of licensed marine activities
- Part 2: Conditions
- 10Design parameters
- 11Design parameters
- 12Design parameters
- 13Maintenance of the authorised scheme
- 14Extension of time periods
- 15Notifications and inspections
- 16Aids to navigation
- 17Colouring of structures
- 18Chemicals, drilling and debris
- 19Force Majeure
- 20Pre-construction plans and documentation
- 21Pre-construction plans and documentation
- 22Underwater Sound Management Strategy
- 23Low order unexploded ordnance clearance
- 24Marine Noise Registry
- 25Offshore safety management
- 26Reporting of engaged agents, contractors and vessels
- 27Pre-construction monitoring and surveys
- 28Construction monitoring
- 29Post-construction monitoring
- 30Reporting of scour and cable protection
- 31Completion of construction
- 32Requirement for written approval
- Schedule 5: Documents to be certified
- 1Paragraph 1
- Explanatory note