Part 8 ENVIRONMENTAL STATEMENT DOCUMENTSI1
England, Wales and Scotland
| Document title | Document number | Version |
|---|---|---|
| ES Non Technical Summary | 5.1 | A |
| ES Chapter 1 Introduction | 5.2.1 | A |
| ES Chapter 2 Project Need and Alternatives | 5.2.2 | A |
| ES Chapter 3 Description of the Project | 5.2.3 | A |
| ES Chapter 4 Approach to preparing the ES | 5.2.4 | A |
| ES Chapter 5 Legislative and Policy Overview | 5.2.5 | A |
| ES Chapter 6 Landscape and Visual | 5.2.6 | A |
| ES Chapter 7 Historic Environment | 5.2.7 | A |
| ES Chapter 8 Biodiversity | 5.2.8 | A |
| ES Chapter 9 Hydrology | 5.2.9 | A |
| ES Chapter 10 Geology and Hydrogeology | 5.2.10 | A |
| ES Chapter 11 Agriculture and Soils | 5.2.11 | A |
| ES Chapter 12 Traffic and Transport | 5.2.12 | A |
| ES Chapter 13 Air Quality | 5.2.13 | A |
| ES Chapter 14 Noise and Vibration | 5.2.14 | A |
| ES Chapter 15 Health and Wellbeing | 5.2.15 | A |
| ES Chapter 16 Socio economics | 5.2.16 | A |
| ES Chapter 17 Climate Change | 5.2.17 | A |
| ES Chapter 18 Cumulative Effects | 5.2.18 | A |
| Environmental Statement Errata Document | 5.2.19 | E |
| Environmental Statement Addendum | 5.2.22 | B |
| Appendix 1A Details of Experts and their Experience.pdf | 5.3.1A | A |
| Appendix 2A Our Approach to Consenting (National Grid) | 5.3.2A | A |
| Appendix 2B Our Approach to Options Appraisal (National Grid) | 5.3.2B | A |
| Appendix 3A Embedded Measures Schedule | 5.3.3A | C |
| Appendix 3B Code of Construction Practice | 5.3.3B | E |
| Appendix 3C Archaeological Written Scheme of Investigation | 5.3.3C | A |
| Appendix 3D Biodiversity Mitigation Strategy | 5.3.3D | B |
| Appendix 3E Outline Soil Management Plan | 5.3.3E | B |
| Appendix 3F Construction Traffic Management Plan | 5.3.3F | D |
| Appendix 3G Public Rights of Way Management Plan | 5.3.3G | B |
| Appendix 3H Noise and Vibration Management Plan | 5.3.3H | B |
| Appendix 3I Arboricultural Impact Assessment (Part 1 of 3) | 5.3.3I (Part 1 of 3) | D |
| Appendix 3I Arboricultural Impact Assessment (Part 2 of 3) | 5.3.3I (Part 2 of 3) | D |
| Appendix 3I Arboricultural Impact Assessment (Part 3 of 3) | 5.3.3I (Part 3 of 3) | D |
| Appendix 4A Scoping Opinion | 5.3.4A | A |
| Appendix 4B Transboundary Screening Matrix | 5.3.4B | A |
| Appendix 5A (No Appendices) | 5.3.5A | A |
| Appendix 6A EIA Scoping Opinion Responses on Landscape and Visual Assessment | 5.3.6A | A |
| Appendix 6B Technical Engagement on Landscape and Visual Assessment | 5.3.6B | A |
| Appendix 6C Landscape and Visual Impact Assessment Methodology | 5.3.6C | A |
| Appendix 6D Landscape Character Baseline | 5.3.6D | A |
| Appendix 6E Landscape Character Sensitivity Assessment | 5.3.6E | A |
| Appendix 6F Landscape Character Receptor Assessment | 5.3.6F | A |
| Appendix 6G Visual Receptor Assessment | 5.3.6G | A |
| Appendix 6H Viewpoint Assessment | 5.3.6H | A |
| Appendix 7A Historic Environment Desk Based Assessment | 5.3.7A | A |
| Appendix 7B Overton Geophysical Survey Results (Plan Only) | 5.3.7B | A |
| Appendix 7C Monk Fryston Geophysical Survey Results (Plan Only) | 5.3.7C | A |
| Appendix 7D Tadcaster Geophysical Survey (Report) | 5.3.7D | A |
| Appendix 7E Trial Trenching at Overton Substation and Monk Fryston Substation | 5.3.7E | A |
| Appendix 7F Technical Note for Beningbrough Hall | 5.3.7F | A |
| Appendix 7G Technical Note for Scheduled Monument at Lead | 5.3.7G | A |
| Appendix 7H Watching Brief on SI works at Marston Moor | 5.3.7H | A |
| Appendix 7I Shipton Geophysical Survey Report | 5.3.7I | B |
| Appendix 7J Tadcaster Geophysical Survey Results (Plan Only) | 5.3.7J | A |
| Appendix 8A Scoping of Assessment Summary | 5.3.8A | A |
| Appendix 8B Extended Phase 1 Habitat Survey Report | 5.3.8B | D |
| Appendix 8C CONFIDENTIAL Badger Survey Report | 5.3.8C | A |
| Appendix 8D Otter and Water Vole Survey Report | 5.3.8D | A |
| Appendix 8E 2021 Wintering Birds Survey Report | 5.3.8E | A |
| Appendix 8F 2021-2022 Wintering Birds Survey Report | 5.3.8F | A |
| Appendix 8G CONFIDENTIAL Schedule 1 Breeding Bird Survey Report | 5.3.8G | A |
| Appendix 8H Bat Survey Report | 5.3.8H | B |
| Appendix 8I GCN District Level Licensing Impact Assessment and Conservation Payment Certificate | 5.3.8I | A |
| Appendix 8J Confidential Schedule 1 Bird Survey Information | 5.3.8J | A |
| Appendix 9A Conservation Sites Screening | 5.3.9A | A |
| Appendix 9B WFD Waterbody Status and Objectives | 5.3.9B | A |
| Appendix 9C Infrastructure Located in WFD Waterbody | 5.3.9C | A |
| Appendix 9D Flood Risk Assessment | 5.3.9D | B |
| Appendix 10A Walkover Survey Records | 5.3.10A | A |
| Appendix 10B Assessment of Physical Effects on Ground Water (Focus Areas) | 5.3.10B | A |
| Appendix 10C Extracts from Unexploded Ordnance (UXO) Reports | 5.3.10C | A |
| Appendix 10D Hydrogeology Water Framework Directive (WFD) Assessment | 5.3.10D | A |
| Appendix 10E Factual Report on Ground Investigation (Socotec 2022) | 5.3.10E | A |
| Appendix 11A Agricultural Land Classification for Shipton North and South CSEC Area | 5.3.11A | A |
| Appendix 11B Agricultural Land Classification for Overton Substation | 5.3.11B | A |
| Appendix 11C Agricultural Land Classification for Tadcaster CSECs | 5.3.11C | A |
| Appendix 11D Agricultural Land Classification for Monk Fryston Substation | 5.3.11D | A |
| Appendix 12A Traffic Modelling Tables | 5.3.12A | A |
| Appendix 13A IAQM Construction Dust Assessment Methodology Tables | 5.3.13A | A |
| Appendix 14A Baseline Noise Report | 5.3.14A | A |
| Appendix 14B Construction Plant and Activity Assumptions | 5.3.14B | A |
| Appendix 14C Construction Modelling Results | 5.3.14C | A |
| Appendix 14D Acoustic Screening Strategy | 5.3.14D | A |
| Appendix 14E Overhead Line Noise Assessment | 5.3.14E | A |
| Appendix 14F National Grid Policy Statement PS(T)134 (2021) | 5.3.14F | A |
| Appendix 14G National Grid Technical Report TR(E)564 (2021) | 5.3.14G | A |
| Appendix 14H National Grid Technical Guidance Note TGN(E)322 (2021) | 5.3.14H | A |
| Appendix 15A (No Appendices) | 5.3.15A | A |
| Appendix 16A (No Appendices) | 5.3.16A | A |
| Appendix 17A (No Appendices) | 5.3.17A | A |
| Appendix 18A Cumulative Effects Assessment Long List of Other Developments | 5.3.18A | C |
| ES Chapter 1 Introduction Figures | 5.4.1 | A |
| ES Chapter 2 Project Need and Alternatives Figures | 5.4.2 | A |
| ES Chapter 3 Description of the Project Figures | 5.4.3 | E |
| ES Chapter 4 Approach to preparing the ES Figures (No Figures) | 5.4.4 | A |
| ES Chapter 5 Legislative and Policy Overview Figures (No Figures) | 5.4.5 | A |
| ES Chapter 6 Landscape and Visual Figures (Part 1 of 15) | 5.4.6 (Part 1 of 15) | B |
| ES Chapter 6 Landscape and Visual Figures (Part 2 of 15) | 5.4.6 (Part 2 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 3 of 15) | 5.4.6 (Part 3 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 4 of 15) | 5.4.6 (Part 4 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 5 of 15) | 5.4.6 (Part 5 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 6 of 15) | 5.4.6 (Part 6 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 7 of 15) | 5.4.6 (Part 7 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 8 of 15) | 5.4.6 (Part 8 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 9 of 15) | 5.4.6 (Part 9 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 10 of 15) | 5.4.6 (Part 10 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 11 of 15) | 5.4.6 (Part 11 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 12 of 15) | 5.4.6 (Part 12 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 13 of 15) | 5.4.6 (Part 13 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 14 of 15) | 5.4.6 (Part 14 of 15) | A |
| ES Chapter 6 Landscape and Visual Figures (Part 15 of 15) | 5.4.6 (Part 15 of 15) | A |
| ES Chapter 7 Historic Environment Figures | 5.4.7 | A |
| ES Chapter 8 Biodiversity Figures (Part 1 of 2) | 5.4.8 (Part 1 of 2) | C |
| ES Chapter 8 Biodiversity Figures (Part 2 of 2) | 5.4.8 (Part 2 of 2) | C |
| ES Chapter 9 Hydrology Figures (Part 1 of 2) | 5.4.9 (Part 1 of 2) | B |
| ES Chapter 9 Hydrology Figures (Part 2 of 2) | 5.4.9 (Part 2 of 2) | B |
| ES Chapter 10 Geology and Hydrogeology Figures | 5.4.10 | A |
| ES Chapter 11 Agriculture and Soils Figures | 5.4.11 | A |
| ES Chapter 12 Traffic and Transport Figures | 5.4.12 | B |
| ES Chapter 13 Air Quality Figures | 5.4.13 | A |
| ES Chapter 14 Noise and Vibration Figures | 5.4.14 | A |
| ES Chapter 15 Health and Wellbeing Figures | 5.4.15 | A |
| ES Chapter 16 Socio economics Figures | 5.4.16 | A |
| ES Chapter 17 Climate Change Figures (No Figures) | 5.4.17 | A |
| ES Chapter 18 Cumulative Effects Figures | 5.4.18 | B |
Annotations
Commencement
- I1
Sch. 2 Pt. 8 in force at 5.4.2024, see art. 1