Paragraph 18 Construction, Operation and MaintenanceI1
England, Wales and Scotland
The relevant undertaker must—
(a)
not discharge waste concrete slurry or wash water from concrete or cement into the marine environment; and
(b)
site concrete and cement mixing and washing areas at least 10 metres from the River Tees or surface water drain to minimise the risk of run off entering the marine environment.
Annotations
Commencement
- I1
Sch. 10 para. 18 in force at 11.3.2024, see art. 1