Paragraph 315 Further provisions about worksI1
England, Wales and Scotland
(1)
All piling within 1.5 metres of the centreline of a pipeline must be non-percussive.
(2)
Where piling is required within 50 metres of the centreline of a pipeline or which could have an effect on the operation or maintenance of a pipeline or access to a pipeline, details of the proposed method for and location of the piling must be provided to HPU for approval in accordance with paragraph 308.
Annotations
Commencement
- I1
Sch. 12 para. 315 in force at 11.3.2024, see art. 1