Schedule 15 DESIGN PARAMETERSI1
England, Wales and Scotland
Table 14
| Component | Maximum Length (m) | Maximum Width (m) | Maximum Height (m AOD) |
|---|---|---|---|
| Gas turbine hall | 76 | 76 | 43 |
| Heat recovery steam generator building | 63 | 28 | 63 |
| Heat recovery steam generator stack | F19.0 m (inner diameter) | 98 | |
| Steam turbine hall | 64 | 54 | 43 |
| Absorber tower | 35 | 25 | 93 |
| Absorber stack | F27.0 m (inner diameter) | 128 | |
| Low carbon electricity generating station electrical substation | 130 | 120 | 42 |
| New electrical substation at Tod Point | 22 | ||
| National Grid Tod Point substation extension (northern bay) | 22 | ||
| National Grid Tod Point substation extension (southern bay) | 22 |
Annotations
Textual amendments
- F1
Word in Sch. 15 Table 14 substituted (29.7.2026) by The Net Zero Teesside (Amendment) Order 2026 (S.I. 2026/890), arts. 1, 3(a)
- F2
Word in Sch. 15 Table 14 substituted (29.7.2026) by The Net Zero Teesside (Amendment) Order 2026 (S.I. 2026/890), arts. 1, 3(b)
Commencement
- I1
Sch. 15 in force at 11.3.2024, see art. 1