The Construction (Design and Management) Regulations (Northern Ireland) 2016
S.R. 2016/146 · Made 11 March 2016 · Extends to Northern Ireland
Health And Safety
Made 11th March 2016
Coming into operation 1st August 2016
The Department of Enterprise, Trade and Investment M1, being the Department concerned M2, makes the following Regulations in exercise of the powers conferred by Articles 17(1), (2), (3), (5) M3, 43(2) and (3), 54(1) and (2) and 55(2) of, and paragraphs 1(1) and (2), 5 to 11, 13, 14(1), 15, 17, 19 and 20 of Schedule 3 to the Health and Safety at Work (Northern Ireland) Order 1978 M4 (“the 1978 Order”).
The Regulations give effect without modifications to proposals submitted to it by the Health and Safety Executive for Northern Ireland under Article 13(1A) M5 of the 1978 Order after the Executive has carried out consultations in accordance with Article 46(3) M6.
It appears to the Department that the modifications to the Fire Precautions (Workplace) Regulations (Northern Ireland) 2001 M7 and to the REACH Enforcement Regulations 2008 M8 in Schedule 6 are expedient for the purposes of Article 54(1) of the 1978 Order. It also appears to the Department not to be appropriate to consult bodies in respect of those modifications for the purposes of Article 54(5) of the 1978 Order.
Annotations to the whole text
Marginal citations
- M1
Formerly the Department of Economic Development; see S.I. 1999/283 (N.I. 1), Article 3(5); that Department was formerly the Department of Manpower Services; see S.I. 1982/846 (N.I. 11), Article 3
- M2
See Article 2(2) of S.I. 1978/1039 (N.I. 9)
- M3
Article 17 shall be read with S.I. 1992/1728 (N.I. 17), Articles 3(2) and 4(2)
- M4
S.I. 1978/1039 (N.I. 9): the general purposes of Part II referred to in Article 17(1) were extended by S.I. 1992/1728 (N.I. 17), Articles 3(1) and 4(1). Article 55(2) was amended by S.I. 1998/2795 (N.I. 18), Article 6(1) and Schedule 1, paragraph 19
- M5
Article 13(1) was substituted by S.I. 1998/2795 (N.I. 18), Article 4
- M6
Article 46(3) was amended by S.I. 1998/2795 (N.I. 18), Article 6(1) and Schedule 1, paragraphs 8 and 18
- M7
S.R. 2001 No. 348, as amended by S.R. 2003 No. 152, S.R. 2003 No. 454 and S.R. 2007 No. 291
- M8
S.I. 2008/2852, as amended by S.I. 2009/716, S.R. 2009 No. 238, S.I. 2010/1513, S.I. 2011/3058, S.I. 2012/632, S.I. 2013/119, S.I. 2013/755, S.I. 2013/1948, S.I. 2013/2919, S.I. 2014/469, S.I. 2014/1638, S.R. 2014 No. 224, S.I. 2014/2882, S.I. 2014/3248, S.I. 2015/21, S.I. 2015/51, S.R. 2015 No. 223, S.I. 2015/1682 and S.R. 2015 No. 339; revoked in part by S.I. 2009/716 and S.R. 2009 No. 238
Contents
- Part 1: INTRODUCTION
- 1Citation and commencement
- 2Interpretation
- 3Application within the territorial sea or a designated area
- Part 2: CLIENT DUTIES
- 4Client duties in relation to managing projects
- 5Appointment of the principal designer and the principal contractor
- 6Notification
- 7Application to domestic clients
- Part 3: HEALTH AND SAFETY DUTIES AND ROLES
- 8General duties
- 9Duties of designers
- 10Designs prepared or modified outside Northern Ireland
- 11Duties of a principal designer in relation to health and safety at the pre-construction phase
- 12Construction phase plan and health and safety file
- 13Duties of a principal contractor in relation to health and safety at the construction phase
- 14Principal contractor's duties to consult and engage with workers
- 15Duties of contractors
- Part 4: GENERAL REQUIREMENTS FOR ALL CONSTRUCTION SITES
- 16Application of Part 4
- 17Safe places of construction work
- 18Good order and site security
- 19Stability of structures
- 20Demolition or dismantling
- 21Excavations
- 22Cofferdams and caissons
- 23Reports of inspections
- 24Energy distribution installations
- 25Prevention of drowning
- 26Traffic routes
- 27Vehicles
- 28Prevention of risk from fire, flooding or asphyxiation
- 29Emergency procedures
- 30Emergency routes and exits
- 31Fire detection and fire-fighting
- 32Fresh air
- 33Temperature and weather protection
- 34Lighting
- Part 5: GENERAL
- 35Civil Liability
- 36Enforcement in respect of fire
- 37Transitional and saving provisions
- 38Revocations and consequential amendments
- Signature
- Schedule 1: PREMISES AND ACTIVITIES WITHIN THE TERRITORIAL SEA OR A DESIGNATED AREA
- 1Interpretation
- 2Offshore installations
- 3Wells
- 4Pipelines
- 5Mines
- 6Gas Importation and Storage
- 7Production of Energy from Water or Wind
- 8Underground Coal Gasification
- 9Other activities
- Schedule 2: PARTICULARS TO BE NOTIFIED UNDER REGULATION 6
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- Schedule 3: MINIMUM WELFARE FACILITIES REQUIRED FOR CONSTRUCTION SITES
- 1Sanitary conveniences
- 2Washing facilities
- 3Drinking water
- 4Changing rooms and lockers
- 5Facilities for rest
- Schedule 4: WORK INVOLVING PARTICULAR RISKS
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Schedule 5: TRANSITIONAL AND SAVING PROVISIONS
- 1Paragraph 1
- 2Paragraph 2
- 3Projects with no existing CDM co-ordinator or principal contractor
- 4Projects with an existing CDM co-ordinator
- 5Duties of CDM co-ordinator during transitional period
- 6Duties disapplied pending appointment of principal designer
- 7Projects with only one contractor
- 8Savings
- Schedule 6AMENDMENTS
- Explanatory note