Regulation 7 Class B: existing renewable power stationsI1

England and Wales

(1)

Class B consists of any hereditament in relation to which the conditions in paragraph (2) are fulfilled.

(2)

The conditions mentioned in paragraph (1) are that—

(a)

the hereditament is a renewable power station;

(b)

the hereditament was first entered onto a F1list before 1st April 2013; and

F2(c)

the rateable value for the hereditament is greater than the notional baseline.

F3(2A)

For the purposes of this regulation, the notional baseline is—

(a)

for a day falling within the period beginning with 1st April 2018 and ending with 31st March 2024, the amount calculated in accordance with the formula—

X×YY1

where—

  • X is the rateable value shown for the hereditament in the list for 31st March 2013;

  • Y is the rateable value shown for the hereditament in the list for 1st April 2017;

  • Y1 is the rateable value shown for the hereditament in the list for 31st March 2017;

(b)

for a day falling within the period beginning with 1st April 2024 and ending with 31st March 2026, the amount calculated in accordance with the formula—

X1×Y2Y3

where—

  • X1 is the notional baseline for 31st March 2024;

  • Y2 is the rateable value shown for the hereditament in the list for 1st April 2023;

  • Y3 is the rateable value shown for the hereditament in the list for 31st March 2023;

(c)

for a day on or after 1st April 2026, the amount calculated in accordance with the formula—

J×ZZ1

where—

  • J is the notional baseline for the last day on which the list immediately preceding the current list was in force;

  • Z is the rateable value shown for the hereditament in the list for the day on which the current list was compiled;

  • Z1 is the rateable value shown for the hereditament in the list for the last day on which the list immediately preceding the current list was in force.

F4(3)

For a hereditament to which regulation 19 (change in rateable value F5...) applies, this regulation has effect subject to the modification made by that provision.

F6(4)

In this regulation—

  • “list” means a local non-domestic rating list for the area of a billing authority in England which shows the hereditament concerned;

  • “current list” means the list in force on the day concerned.

Annotations

Textual amendments

F1

Word in reg. 7(2)(b) substituted (1.4.2024) by The Non-Domestic Rating (Rates Retention and Renewable Energy Projects) (Amendment) Regulations 2024 (S.I. 2024/184), regs. 1(2), 5(2)(a)

F2

Reg. 7(2)(c) substituted (1.4.2024) by The Non-Domestic Rating (Rates Retention and Renewable Energy Projects) (Amendment) Regulations 2024 (S.I. 2024/184), regs. 1(2), 5(2)(b)

F3

Reg. 7(2A) inserted (1.4.2024) by The Non-Domestic Rating (Rates Retention and Renewable Energy Projects) (Amendment) Regulations 2024 (S.I. 2024/184), regs. 1(2), 5(3)

F4

Reg. 7(3) inserted (14.12.2017) by The Non-Domestic Rating (Renewable Energy Projects) (Amendment) Regulations 2017 (S.I. 2017/1132), regs. 1, 3(b)

F5

Words in reg. 7(3) omitted (1.4.2024) by virtue of The Non-Domestic Rating (Rates Retention and Renewable Energy Projects) (Amendment) Regulations 2024 (S.I. 2024/184), regs. 1(2), 5(4)

F6

Reg. 7(4) inserted (1.4.2024) by The Non-Domestic Rating (Rates Retention and Renewable Energy Projects) (Amendment) Regulations 2024 (S.I. 2024/184), regs. 1(2), 5(5)

Commencement

I1

Reg. 7 in force at 18.2.2013, see reg. 1(1)