Part 2 EXISTING HIGHWAYSI1

England, Wales and Scotland

(1)

Area

(2)

Extent of Highway

(3)

(i) Current Classification

(ii) Highway Authority

(4)

Event determining change of classification

(5)

Proposed Classification

(6)

Classes of Traffic

(7)

Highway Authority

District of South NorthamptonshireThe length of highway the centreline of which is shown coloured dark blue and between the points 1 and 2 on the highway classification plans (Document 2.5A).

(i) All Purpose Trunk Road

(ii) Highways England

Opening to traffic of the length of highway stated in column (2).Special RoadClass I and Class IIHighways England
The length of highway the centreline of which is shown coloured orange and between the points 5 and 6 on the highway classification plans (Document 2.5A).

(i) Unclassified Road

(ii) The local highway authority

Commencement of Works No. 8 shown on the works plans (Documents 2.2A and 2.2B).Trunk RoadAll purposeHighways England
The length of highway the centreline of which is shown coloured dark blue and between the points 7 and 8 on the highway classification plans (Document 2.5A).

(i) All Purpose Trunk Road

(ii) Highways England

Opening to traffic of the length of highway stated in column (2).Special RoadClass I and Class IIHighways England
The length of highway the centreline of which is shown coloured orange and between the points 9 and 10 on the highway classification plans (Document 2.5A).

(i) Principal Road

(ii) The local highway authority

Commencement of Works No. 8 shown on the works plans (Documents 2.2A and 2.2B).Trunk RoadAll purposeHighways England

Annotations

Commencement

I1

Sch. 7 Pt. 2 in force at 30.10.2019, see art. 1