Part 3 Requirements
England, Wales and Scotland
- 1Time limits
- 2Detailed offshore design parameters
- 3Detailed offshore design parameters
- 4Detailed offshore design parameters
- 5Detailed offshore design parameters
- 6Base port travel plan
- 7Lighting
- 8Offshore decommissioning
- 9Stages of authorised development onshore
- 10Design approval onshore
- 11Provision of landscaping
- 12Implementation and maintenance of landscaping
- 13Highway accesses
- 14Permanent highway accesses in the South Downs National Park
- 15Public rights of way
- 16National Trail in the South Downs National Park
- 17Fencing and means of enclosure
- 18Temporary fencing in the South Downs National Park
- 19Surface and foul water drainage
- 20Contaminated land and groundwater
- 21Landfill site
- 22Flood risk
- 23Archaeology
- 24Archaeology in the South Downs National Park
- 25Scheduled monument at Tottington Mount
- 26Construction environmental management plan
- 27Watercourse crossings
- 28Ecological and landscape management plan
- 29Ecological and landscape management plan for the South Downs National Park
- 30Construction health, safety and environmental plan
- 31Construction traffic management plan
- 32Construction hours
- 33External lighting and control of artificial light emissions
- 34External lighting in the South Downs National Park
- 35Control of noise during construction
- 36Control of noise during operational phase
- 37European protected species onshore
- 38European protected species within the South Downs National Park
- 39Restoration of land used temporarily for construction
- 40Restoration of land within the South Downs National Park used temporarily for construction
- 41Onshore decommissioning
- 42Amendments to approved details
- 43Consultation with local planning authority