The Rampion Offshore Wind Farm Order 2014
S.I. 2014/1873 · Made 16 July 2014 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 16th July 2014
Coming into force 6th August 2014
The application was examined by a Panel appointed as an Examining authority by the Secretary of State pursuant to Chapter 4 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 2010f3;
The Examining authority, having considered the application with the documents that accompanied it, and the representations made and not withdrawn, has, in accordance with section 74 of the 2008 Act made a report and recommendation to the Secretary of State;
The Secretary of State, having considered the report and recommendation of the Panel, and decided the application, has determined to make an Order giving effect to the proposals comprised in the application with modifications which in his opinion do not make substantial change to the proposals;
The Secretary of State, in exercise of the powers conferred by sections 114, 115, 120, and 149A of the 2008 Act, makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
S.I. 2009/2264 as amended by the Localism Act 2011 (Infrastructure Planning) (Consequential Amendments) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Prescribed Consultees and Interested Parties etc) (Amendment) Regulations 2013 (S.I. 2013/522). There are other amendments to the Regulations which are not relevant to this Order.
- f2
-
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of, and Schedule 13 to, the Localism Act 2011 (c. 20), and by sections 22-27 of the Growth and Infrastructure Act 2013 (c. 27), see S.I. 2013/1124 for transitional provisions. Section 149A was inserted by section 112(1) of, and paragraph 4 of Part 1 of Schedule 8 to, the Marine and Coastal Access Act 2009 (c. 33).
- f3
-
S.I. 2010/103 as amended by S.I. 2012/635.
Contents
- 1Citation and commencement
- 2Interpretation
- 3Development consent etc granted by the Order
- 4Power to maintain authorised project
- 5Operation of electricity generating station
- 6Requirements, appeals etc
- 7Benefit of the Order
- 8Application and modification of legislative provisions
- 9Public rights of navigation
- 10Abatement of works abandoned or decayed
- 11Deemed marine licences under the Marine and Coastal Access Act 2009
- 12Saving for Trinity House
- 13Crown rights
- 14Defence to proceedings in respect of statutory nuisance
- 15Street works
- 16Temporary stopping up of streets
- 17Public rights of way
- 18Access to works
- 19Agreements with street authorities
- 20Discharge of water
- 21Authority to survey and investigate the land
- 22Temporary suspension of public access to access land
- 23Compulsory acquisition of land
- 24Time limit for exercise of authority to acquire land compulsorily
- 25Compulsory acquisition of rights
- 26Private rights
- 27Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 28Acquisition of subsoil only
- 29Acquisition of part of certain properties
- 30Rights under or over streets
- 31Temporary use of land for carrying out the authorised project
- 32Temporary use of land for maintaining the authorised project
- 33Statutory undertakers
- 34Recovery of costs of new connections
- 35Application of landlord and tenant law
- 36Operational land for purposes of the 1990 Act
- 37Felling or lopping of trees and removal of hedgerows
- 38Trees subject to tree preservation orders
- 39Procedure in relation to further approvals, etc
- 40Certification of plans etc
- 41Protective provisions
- 42Arbitration
- Signature
- Schedule 1: Authorised project
- Part 1: Authorised development
- 1Paragraph 1
- 2Paragraph 2
- 2Ancillary works
- Part 3: Requirements
- 1Time limits
- 2Detailed offshore design parameters
- 3Detailed offshore design parameters
- 4Detailed offshore design parameters
- 5Detailed offshore design parameters
- 6Base port travel plan
- 7Lighting
- 8Offshore decommissioning
- 9Stages of authorised development onshore
- 10Design approval onshore
- 11Provision of landscaping
- 12Implementation and maintenance of landscaping
- 13Highway accesses
- 14Permanent highway accesses in the South Downs National Park
- 15Public rights of way
- 16National Trail in the South Downs National Park
- 17Fencing and means of enclosure
- 18Temporary fencing in the South Downs National Park
- 19Surface and foul water drainage
- 20Contaminated land and groundwater
- 21Landfill site
- 22Flood risk
- 23Archaeology
- 24Archaeology in the South Downs National Park
- 25Scheduled monument at Tottington Mount
- 26Construction environmental management plan
- 27Watercourse crossings
- 28Ecological and landscape management plan
- 29Ecological and landscape management plan for the South Downs National Park
- 30Construction health, safety and environmental plan
- 31Construction traffic management plan
- 32Construction hours
- 33External lighting and control of artificial light emissions
- 34External lighting in the South Downs National Park
- 35Control of noise during construction
- 36Control of noise during operational phase
- 37European protected species onshore
- 38European protected species within the South Downs National Park
- 39Restoration of land used temporarily for construction
- 40Restoration of land within the South Downs National Park used temporarily for construction
- 41Onshore decommissioning
- 42Amendments to approved details
- 43Consultation with local planning authority
- Schedule 2Streets subject to street works
- Schedule 3Footpath to be permanently stopped up
- Schedule 4Public rights of way to be temporarily stopped up
- Schedule 5Access to works
- Schedule 6Temporary suspension of public access to access land
- Schedule 7Land in which only new rights etc, may be acquired
- Schedule 8: Modification of compensation and compulsory purchase enactments for creation of new rights and restrictive covenants
- Compensation enactments
- 1Paragraph 1
- 2Paragraph 2
- Application of the 1965 Act
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Schedule 9Land of which temporary possession may be taken
- Schedule 10Important hedgerows
- Schedule 11Trees subject to tree preservation orders
- Schedule 12: Protective provisions
- Part 1: For the protection of railway interests
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- Part 2: For the protection of National Grid Electricity Transmission plc
- 1Application
- 2Interpretation
- 3Interpretation
- 4Apparatus of protected person in stopped up streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection: electricity undertakers
- 10Expenses
- 11Indemnity
- 12Ground subsidence monitoring scheme in respect of protected person’s apparatus
- 13Enactments and agreements
- 14Co-operation
- 15Access
- 16Arbitration
- 17Transfer of agreements
- Part 3: For the protection of South Eastern Power Networks plc
- 1Application
- 2Interpretation
- 3Interpretation
- 4Apparatus of protected undertakers in stopped up streets
- 5Acquisition of land
- 6Removal of apparatus
- 7Facilities and rights for alternative apparatus
- 8Retained apparatus: protection
- 9Expenses
- 10Expenses
- 11Enactments and agreements
- 12Co-operation
- 13Access
- 14Arbitration
- Part 4: For the protection of Southern Water Services Limited
- 1Application
- 2Interpretation
- 3Interpretation
- 4Acquisition of land
- 5Removal of apparatus
- 6Facilities and rights for alternative apparatus
- 7Retained apparatus: protection
- 8Expenses
- 9Expenses
- 10Enactments and agreements
- Part 5: For the protection of gas pipeline owners, pipeline owners and sewerage undertakers
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- Schedule 13: Deemed licence under Marine and Coastal Access Act 2009 – array
- Part 1: Licensed marine activities
- 1Paragraph 1
- 2Details of licensed marine activities
- 3Details of licensed marine activities
- 4Details of licensed marine activities
- 5Details of licensed marine activities
- 6Details of licensed marine activities
- Part 2: Conditions
- 1Design parameters
- 2Design parameters
- 3Design parameters
- 4Design parameters
- 5Notifications and inspections
- 6Navigational practice, safety and emergency response
- 7Aids to navigation
- 8Aids to navigation
- 9Chemicals, drilling and debris
- 10Force majeure
- 11Pre-construction plans and documentation
- 12Pre-construction plans and documentation
- 13Reporting of engaged agents, contractors and vessels
- 14Equipment and operation of vessels engaged in licensed activities
- 15Pre-construction monitoring and surveys
- 16Construction monitoring
- 17Post construction surveys
- 18Black bream spawning
- 19Herring spawning
- 20Restrictions on monopile foundations
- 21Monitoring of shoreline sediment morphology
- 22Decommissioning
- Schedule 14: Deemed licence under Marine and Coastal Access Act 2009 – export cables
- Part 1: Licensed marine activities
- 1Paragraph 1
- 2Details of licensed marine activities
- 3Details of licensed marine activities
- 4Details of licensed marine activities
- 5Details of licensed marine activities
- 6Details of licensed marine activities
- Part 2: Conditions
- 1Design parameters
- 2Notifications and inspections
- 3Navigational practice, safety and emergency response
- 4Aids to navigation
- 5Chemicals, drilling and debris
- 6Force majeure
- 7Pre-construction plans and documentation
- 8Pre-construction plans and documentation
- 9Reporting of engaged agents, contractors and vessels
- 10Equipment and operation of vessels engaged in licensed activities
- 11Pre-construction monitoring and surveys
- 12Construction monitoring
- 13Post construction surveys
- 14Decommissioning
- 15Monitoring of shoreline sediment morphology
- Explanatory note