Part 6 Banding and grandfathering
- 27The amount of electricity to be stated in each SROC
- 28Electricity generated by qualifying combined heat and power generating stations
- 28AHigh-range co-firing in the 2013/14 obligation period
- 28BCo-firing of regular bioliquid in the 2013/14 and 2014/15 obligation periods
- 28CLow-range co-firing in the 2013/14 and 2014/15 obligation periods
- 28DLow-range co-firing of relevant energy crops
- 28ELow-range co-firing of relevant energy crops with CHP
- 29Microgenerators
- 30Generating stations which were accredited as at 11th July 2006
- 30AOffshore wind generating stations using 2006/10 wind turbines
- 30BWave and tidal stream generating stations
- 30COffshore wind generating stations using test and demonstration wind turbines
- 30DOffshore wind generating stations using floating wind turbines
- 31Generating stations which were accredited, or held preliminary accreditation, as at 31st March 2009
- 32Generating stations in respect of which a statutory grant has been awarded
- 33Review of banding provisions