Article 11 Temporary closure of public rights of wayI1
England and Wales As made
The undertaker may in connection with the carrying out of the authorised project, temporarily close each of the public rights of way specified in column (2) of Schedule 4 (public rights of way to be temporarily closed) to the extent specified in column (3) of that Schedule, by reference to the letters shown on the public rights of way plan.
Annotations
Commencement
- I1
Art. 11 in force at 9.5.2024, see art. 1