The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024
S.I. 2024/564 · Made 17 April 2024 · Extends to England and Wales
Infrastructure Planning
Made
17th April 2024Coming into force
9th May 2024The application was examined by a Panel appointed by the Secretary of State pursuant to section 61f3 and 65f4 of Part 6 of the 2008 Act and carried out in accordance with Chapter 4 of that Act and with the Infrastructure Planning (Examination Procedure) Rules 2010f5. The Panel has made a report and recommendation to the Secretary of State under section 74(2)f6 of the 2008 Act.
The Secretary of State has considered the report and recommendation of the Panel, has taken into account the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f7 and has had regard to the documents and matters referred to in section 104(2)f8 of the 2008 Act.
The Secretary of State is satisfied that special category land comprised within the Order land, when burdened with the new rights authorised for compulsory acquisition under the terms of this Order, will be no less advantageous than it was before such acquisition to the persons in whom it is vested; other persons, if any, entitled to rights of common or other rights; and the public; and that, accordingly, section 132(3)f9 of the 2008 Act applies.
The Secretary of State, having decided the application, has determined to make an order granting development consent for the development described in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.
Accordingly, the Secretary of State, in exercise of the powers in sections 114, 115, 120f10, 122, 123, 140 and 149A of the 2008 Act, makes the following Order:
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Section 37 was amended by Chapter 6 of Part 6 of, and Schedule 13 to, the Localism Act 2011 (c. 20).
- f2
- f3
-
Section 61 was amended by section 128(2) and Schedule 13, paragraph 18 to the Localism Act 2011 (c. 20) and by section 26 of the Infrastructure Act 2015 (c. 7).
- f4
-
Section 65 was amended by Schedule 13, paragraph 22(2) and Schedule 25, paragraph 1 to the Localism Act 2011 (c. 20) and by section 27(1) of the Infrastructure Act 2015 (c. 7).
- f5
-
S.I. 2010/2013, amended by S.I. 2012/635.
- f6
-
Section 74 was amended by sections 128(2) and 237 and by Schedule 13, paragraph 29 and Schedule 25, paragraph 1, to the Localism Act 2011 (c. 20).
- f7
- f8
-
Section 104 was amended by section 58(5) of the Marine and Coastal Access Act 2009 (c. 23) and by section 128(2) and Schedule 13, paragraphs 1 and 49(1) to (6) of the Localism Act 2011 (c. 20).
- f9
-
Section 132 was amended by section 24(3) of the Growth and Infrastructure Act 2013 (c. 27).
- f10
-
Sections 114, 115 and 120 were amended by sections 128(2) and 140 and Schedule 13, paragraphs 1, 55(1), (2) and 60(1) and (3) of the Localism Act 2011 (c. 20). Relevant amendments were made to section 115 by section 160(1) to (6) of the Housing and Planning Act 2016 (c. 22)
Contents
- Part 1: Preliminary
- 1Citation and commencement
- 2Interpretation
- Part 2: Principal powers
- 3Development consent granted by the Order
- 4Maintenance of the authorised project
- 5Benefit of Order
- 6Disapplication and modification of legislative provisions
- 7Defence to proceedings in respect of statutory nuisance
- Part 3: Streets
- 8Street works
- 9Application of the 1991 Act
- 10Temporary closure of streets
- 11Temporary closure of public rights of way
- 12Access to works
- 13Agreements with street authorities
- Part 4: Supplemental powers
- 14Discharge of water
- 15Protective work to buildings
- 16Authority to survey and investigate land
- Part 5: Powers of acquisition
- 17Compulsory acquisition of land
- 18Time limit for exercise of authority to acquire land compulsorily
- 19Compulsory acquisition of rights
- 20Private rights over land
- 21Application of the 1981 Act
- 22Acquisition of subsoil or airspace only
- 23Modification of Part 1 of the 1965 Act
- 24Rights under or over streets
- 25Temporary use of land for carrying out the authorised project
- 26Temporary use of land for maintaining the authorised project
- 27Statutory undertakers
- 28Recovery of costs of new connections
- Part 6: Operations
- 29Operation of generating station
- 30Deemed marine licences under the 2009 Act
- Part 7: Miscellaneous and general
- 31Application of landlord and tenant law
- 32Operational land for purposes of the 1990 Act
- 33Felling or lopping of trees and removal of hedgerows
- 34Trees subject to tree preservation orders
- 35Saving provisions for Trinity House
- 36Crown rights
- 37Certification of plans and documents, etc.
- 38Abatement of works abandoned or decayed
- 39Funding
- 40Protective provisions
- 41Service of notices
- 42Arbitration
- 43Procedure in relation to approvals, etc. under requirements
- 44Modification of DOW section 36 consent
- 45Compensation
- Signature
- Schedule 1: Authorised project
- Part 1: Authorised development
- 1Paragraph 1
- 2Paragraph 2
- Part 2: Ancillary works
- 1Paragraph 1
- Schedule 2
- Part 1: Requirements
- 1Time limits
- 2Detailed offshore design parameters
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Offshore decommissioning
- 9Scenarios and Phases of authorised development
- 10Detailed design parameters onshore
- 11Provision of landscaping
- 12Implementation and maintenance of landscaping
- 13Ecological management plan
- 14Fencing and other means of enclosure
- 15Traffic and Transport
- 16Highway accesses
- 17Operational Drainage Strategy
- 18Onshore Archaeology
- 19Code of construction practice
- 20Construction hours
- 21Control of noise during operational phase
- 22Control of artificial light emissions
- 23European protected species: onshore
- 24Public Rights of Way Strategy
- 25Restoration of land used temporarily for construction
- 26Local skills and employment
- 27Ministry of Defence surveillance operations
- 28Cromer and Claxby Primary Surveillance Radar
- 29Onshore decommissioning
- 30Notification of generation of power
- 31Amendments to approved details
- 32Contaminated land and groundwater scheme
- 33Onshore collaboration
- 34Mitigation of effects on pink footed geese
- 35Obstacle free zone for navigational safety
- Part 2: Approval of matters specified in requirements
- 1Applications made under requirements
- 2Further information
- 3Provision of information by Consultees
- 4Fees
- 5Appeal
- Schedule 3: Streets subject to street works
- Schedule 4: Public Rights of Way to be temporarily closed
- Schedule 5: Streets to be temporarily closed
- Schedule 6: Access to works
- Schedule 7: Land in which only new rights, etc may be acquired
- Schedule 8: Modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants
- 1Compensation enactments
- 2Paragraph 2
- 3Paragraph 3
- 4Application of Part 1 of the 1965 Act
- 5Paragraph 5
- Schedule 9: Land of which only temporary possession may be taken
- Schedule 10: Marine Licence 1: Sheringham Shoal Extension Project Offshore Generation – Work Nos. 1A, 2A and 6A or 6C
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed marine activities
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 2: Conditions
- 1Design parameters
- 2Paragraph 2
- 3Paragraph 3
- 4Scenarios and Phases of authorised project
- 5Vessels under the undertaker’s control
- 6Extension of time periods
- 7Notifications and inspections
- 8Aids to navigation
- 9Colouring of Structures
- 10Aviation safety
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14Site Integrity Plan
- 15Approval of programmes, statements etc
- 16Offshore safety management
- 17Reporting of engaged agents, contractors and vessels
- 18Pre-construction monitoring and surveys
- 19Construction monitoring and surveys
- 20Post-construction monitoring and surveys
- 21Reporting of scour and cable protection
- 22Completion of construction
- 23Sediment Sampling
- 24Collaboration
- 25Obstacle free zone for navigational safety
- Schedule 11: Marine Licence 2: Dudgeon Extension Project Offshore Generation – Work No 1B, 2B and Work No 6B or 6C
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed marine activities
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 2: Conditions
- 1Design parameters
- 2Paragraph 2
- 3Paragraph 3
- 4Scenarios and Phases of authorised project
- 5Vessels under the undertaker’s control
- 6Extension of time periods
- 7Notifications and inspections
- 8Aids to navigation
- 9Colouring of Structures
- 10Aviation safety
- 11Chemicals, drilling and debris
- 12Force majeure
- 13Pre-construction plans and documentation
- 14Site Integrity Plan
- 15Approval of programmes, statements etc
- 16Offshore safety management
- 17Reporting of engaged agents, contractors and vessels
- 18Pre-construction monitoring and surveys
- 19Construction monitoring and surveys
- 20Post-construction monitoring and surveys
- 21Reporting of scour and cable protection
- 22Completion of construction
- 23Sediment Sampling
- 24Collaboration
- 25Obstacle free zone for navigational safety
- Schedule 12: Marine Licence 3: Sheringham Shoal Extension Project Offshore Transmission – Work Nos 3A to 7A or 3C to 7C
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed marine activities
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- Part 2: Conditions
- 1Design parameters
- 2Paragraph 2
- 3Scenarios and Phases of authorised project
- 4Vessels under the undertaker’s control
- 5Extension of time periods
- 6Notifications and inspections
- 7Aids to navigation
- 8Colouring of structures
- 9Aviation safety
- 10Chemicals, drilling and debris
- 11Force majeure
- 12Pre-construction plans and documentation
- 13Site Integrity Plan
- 14Paragraph 14
- 15Offshore safety management
- 16Reporting of engaged agents, contractors and vessels
- 17Pre-construction monitoring and surveys
- 18Construction monitoring and surveys
- 19Post-construction monitoring and surveys
- 20Reporting of scour and cable protection
- 21Completion of construction
- 22Sediment Sampling
- 23Collaboration
- 24Seasonal Restriction
- 25Obstacle free zone for navigational safety
- Schedule 13: Marine Licence 4: Dudgeon Extension Project Offshore Transmission – Work Nos 3B to 7B or 3C to 7C
- Part 1: Licensed marine activities
- 1Interpretation
- 2Details of licensed marine activities
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- Part 2: Conditions
- 1Design parameters
- Cables and cable protection
- 2Paragraph 2
- 3Scenarios and Phases of authorised project
- 4Vessels under the undertaker’s control
- 5Extension of time periods
- 6Notifications and inspections
- 7Aids to navigation
- 8Colouring of structures
- 9Aviation safety
- 10Chemicals, drilling and debris
- 11Force majeure
- 12Pre-construction plans and documentation
- 13Site Integrity Plan
- 14Paragraph 14
- 15Offshore safety management
- 16Reporting of engaged agents, contractors and vessels
- 17Pre-construction monitoring and surveys
- 18Construction monitoring and surveys
- 19Post-construction monitoring and surveys
- 20Reporting of scour and cable protection
- 21Completion of construction
- 22Sediment Sampling
- 23Collaboration
- 24Seasonal Restriction
- 25Obstacle free zone for navigational safety
- Schedule 14: Protective provisions
- Part 1: Protection of electricity, gas, water and sewerage undertakers
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Acquisition of land
- 5Removal of apparatus
- 6Facilities and rights for alternative apparatus
- 7Retained apparatus
- 8Expenses and costs
- 9Paragraph 9
- 10Miscellaneous
- 11Paragraph 11
- Part 2: Protection for operators of electronic communications code networks
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Part 3: For the protection of Network Rail Infrastructure Limited
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- 22Paragraph 22
- Part 4: For the protection of the Environment Agency
- 1Paragraph 1
- 2Submission and approval of plans
- 3Construction of protective works
- 4Timing of works and service of notices
- 5Works not in accordance with this Schedule
- 6Maintenance of works
- 7Remediating impaired drainage work
- 8Agency access
- 9Free passage of fish
- 10Indemnity
- 11Paragraph 11
- 12Disputes
- Part 5: For the protection of the drainage authorities
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- Part 6: For the protection of National Gas Transmission Plc as Gas Undertaker
- 1Application
- 2Interpretation
- 3On Street Apparatus
- 4Apparatus of National Gas Transmission in closed streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection
- 10Expenses
- 11Indemnity
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
- 16Notices
- Part 7: For the protection of National Grid Electricity Transmission Plc
- 1Application
- 2Interpretation
- 3On Street Apparatus
- 4Apparatus of National Grid in closed streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection
- 10Expenses
- 11Indemnity
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
- 16Notices
- Part 8: For the protection of Cadent Gas Limited as Gas Undertaker
- 1Application
- 2Interpretation
- 3On Street Apparatus
- 4Apparatus of Cadent in closed streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection of Cadent
- 10Expenses
- 11Indemnity
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
- 16Notices
- Part 9: For the protection of Anglian Water Services Limited
- 1Application
- 2Interpretation
- 3Apparatus in closed streets
- 4Protective works to buildings
- 5Acquisition of land
- 6Removal of apparatus
- 7Facilities and rights for alternative apparatus
- 8Retained apparatus
- 9Expenses and costs
- 10Paragraph 10
- 11Paragraph 11
- 12Cooperation
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- Part 10: For the protection of Norfolk Vanguard
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- Part 11: For the protection of Norfolk Boreas
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- Part 12: For the protection of Eastern Power Networks Plc
- 1Application
- 2Interpretation
- 3Paragraph 3
- 4Apparatus of Protected Persons in closed streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: Protection
- 10Expenses
- 11Paragraph 11
- 12Enactments and agreements
- 13Co-operation
- 14Access
- 15Arbitration
- Part 13: For the protection of National Highways Limited
- 1Application etc.
- 2Interpretation
- 3General
- 4Paragraph 4
- 5Paragraph 5
- 6Works outside the Order limits
- 7Prior approvals and security
- 8Construction of the specified works
- 9Payments
- 10Provisional certificate
- 11Opening
- 12Final condition survey
- 13Defects period
- 14Final certificate
- 15Security
- 16Commuted sums
- 17Insurance
- 18Indemnity
- 19Maintenance of the specified works
- 20Land
- 21Expert Determination
- Part 14: For the protection of Perenco North Sea Limited
- 1Application
- 2Interpretation
- 3Works affecting the facilities
- 4Cooperation
- Schedule 15: Arbitration Rules
- 1Primary objective
- 2Time periods
- 3Timetable
- 4Procedure
- 5Arbitrator’s powers
- 6Costs
- 7Confidentiality
- Schedule 16: Hedgerows
- 1Removal of Hedgerows
- 2Removal of potentially important hedgerows
- 3Removal of important hedgerows
- Schedule 17: Compensation Measures
- Part 1: North Norfolk Coast Special Protection Area / Greater Wash Special Protection Area: Delivery of measures to compensate for sandwich tern loss
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- Part 2: Flamborough and Filey Coast Special Protection Area: Delivery of measures to compensate for kittiwake loss
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- 22Paragraph 22
- Part 3: Flamborough and Filey Coast Special Protection Area: Delivery of measures to compensate for guillemot loss
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- 26Paragraph 26
- 27Paragraph 27
- 28Paragraph 28
- 29Paragraph 29
- 30Paragraph 30
- 31Paragraph 31
- 32Paragraph 32
- Part 4: Measures of equivalent environmental benefit
- 33Paragraph 33
- 34Paragraph 34
- 35Paragraph 35
- 36Paragraph 36
- 37Paragraph 37
- 38Paragraph 38
- 39Paragraph 39
- 40Paragraph 40
- 41Paragraph 41
- 42Paragraph 42
- 43Paragraph 43
- 44Paragraph 44
- Schedule 18: Documents to be certified
- Explanatory note