The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024

S.I. 2024/564 · Made 17 April 2024 · Extends to England and Wales

As made. This is the original text, without later amendments. Read the latest version.

Infrastructure Planning

Made

17th April 2024

Coming into force

9th May 2024

An application has been made to the Secretary of State under section 37 of the Planning Act 2008f1(the “2008 Act”), and in accordance with the Infrastructure Planning (Applications: Prescribed Forms and Procedures) Regulations 2009f2for an order granting development consent.

The application was examined by a Panel appointed by the Secretary of State pursuant to section 61f3 and 65f4 of Part 6 of the 2008 Act and carried out in accordance with Chapter 4 of that Act and with the Infrastructure Planning (Examination Procedure) Rules 2010f5. The Panel has made a report and recommendation to the Secretary of State under section 74(2)f6 of the 2008 Act.

The Secretary of State has considered the report and recommendation of the Panel, has taken into account the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f7 and has had regard to the documents and matters referred to in section 104(2)f8 of the 2008 Act.

The Secretary of State is satisfied that special category land comprised within the Order land, when burdened with the new rights authorised for compulsory acquisition under the terms of this Order, will be no less advantageous than it was before such acquisition to the persons in whom it is vested; other persons, if any, entitled to rights of common or other rights; and the public; and that, accordingly, section 132(3)f9 of the 2008 Act applies.

The Secretary of State, having decided the application, has determined to make an order granting development consent for the development described in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.

Accordingly, the Secretary of State, in exercise of the powers in sections 114, 115, 120f10, 122, 123, 140 and 149A of the 2008 Act, makes the following Order:

Annotations to the whole text

Footnotes

f1

2008 c. 29. Section 37 was amended by Chapter 6 of Part 6 of, and Schedule 13 to, the Localism Act 2011 (c. 20).

f2

S.I. 2009/2264.

f3

Section 61 was amended by section 128(2) and Schedule 13, paragraph 18 to the Localism Act 2011 (c. 20) and by section 26 of the Infrastructure Act 2015 (c. 7).

f4

Section 65 was amended by Schedule 13, paragraph 22(2) and Schedule 25, paragraph 1 to the Localism Act 2011 (c. 20) and by section 27(1) of the Infrastructure Act 2015 (c. 7).

f5

S.I. 2010/2013, amended by S.I. 2012/635.

f6

Section 74 was amended by sections 128(2) and 237 and by Schedule 13, paragraph 29 and Schedule 25, paragraph 1, to the Localism Act 2011 (c. 20).

f7

S.I. 2017/572.

f8

Section 104 was amended by section 58(5) of the Marine and Coastal Access Act 2009 (c. 23) and by section 128(2) and Schedule 13, paragraphs 1 and 49(1) to (6) of the Localism Act 2011 (c. 20).

f9

Section 132 was amended by section 24(3) of the Growth and Infrastructure Act 2013 (c. 27).

f10

Sections 114, 115 and 120 were amended by sections 128(2) and 140 and Schedule 13, paragraphs 1, 55(1), (2) and 60(1) and (3) of the Localism Act 2011 (c. 20). Relevant amendments were made to section 115 by section 160(1) to (6) of the Housing and Planning Act 2016 (c. 22)

Contents

  1. Part 1: Preliminary
  2. 1Citation and commencement
  3. 2Interpretation
  4. Part 2: Principal powers
  5. 3Development consent granted by the Order
  6. 4Maintenance of the authorised project
  7. 5Benefit of Order
  8. 6Disapplication and modification of legislative provisions
  9. 7Defence to proceedings in respect of statutory nuisance
  10. Part 3: Streets
  11. 8Street works
  12. 9Application of the 1991 Act
  13. 10Temporary closure of streets
  14. 11Temporary closure of public rights of way
  15. 12Access to works
  16. 13Agreements with street authorities
  17. Part 4: Supplemental powers
  18. 14Discharge of water
  19. 15Protective work to buildings
  20. 16Authority to survey and investigate land
  21. Part 5: Powers of acquisition
  22. 17Compulsory acquisition of land
  23. 18Time limit for exercise of authority to acquire land compulsorily
  24. 19Compulsory acquisition of rights
  25. 20Private rights over land
  26. 21Application of the 1981 Act
  27. 22Acquisition of subsoil or airspace only
  28. 23Modification of Part 1 of the 1965 Act
  29. 24Rights under or over streets
  30. 25Temporary use of land for carrying out the authorised project
  31. 26Temporary use of land for maintaining the authorised project
  32. 27Statutory undertakers
  33. 28Recovery of costs of new connections
  34. Part 6: Operations
  35. 29Operation of generating station
  36. 30Deemed marine licences under the 2009 Act
  37. Part 7: Miscellaneous and general
  38. 31Application of landlord and tenant law
  39. 32Operational land for purposes of the 1990 Act
  40. 33Felling or lopping of trees and removal of hedgerows
  41. 34Trees subject to tree preservation orders
  42. 35Saving provisions for Trinity House
  43. 36Crown rights
  44. 37Certification of plans and documents, etc.
  45. 38Abatement of works abandoned or decayed
  46. 39Funding
  47. 40Protective provisions
  48. 41Service of notices
  49. 42Arbitration
  50. 43Procedure in relation to approvals, etc. under requirements
  51. 44Modification of DOW section 36 consent
  52. 45Compensation
  53. Signature
  54. Schedule 1: Authorised project
  55. Part 1: Authorised development
  56. 1Paragraph 1
  57. 2Paragraph 2
  58. Part 2: Ancillary works
  59. 1Paragraph 1
  60. Schedule 2
  61. Part 1: Requirements
  62. 1Time limits
  63. 2Detailed offshore design parameters
  64. 3Paragraph 3
  65. 4Paragraph 4
  66. 5Paragraph 5
  67. 6Paragraph 6
  68. 7Paragraph 7
  69. 8Offshore decommissioning
  70. 9Scenarios and Phases of authorised development
  71. 10Detailed design parameters onshore
  72. 11Provision of landscaping
  73. 12Implementation and maintenance of landscaping
  74. 13Ecological management plan
  75. 14Fencing and other means of enclosure
  76. 15Traffic and Transport
  77. 16Highway accesses
  78. 17Operational Drainage Strategy
  79. 18Onshore Archaeology
  80. 19Code of construction practice
  81. 20Construction hours
  82. 21Control of noise during operational phase
  83. 22Control of artificial light emissions
  84. 23European protected species: onshore
  85. 24Public Rights of Way Strategy
  86. 25Restoration of land used temporarily for construction
  87. 26Local skills and employment
  88. 27Ministry of Defence surveillance operations
  89. 28Cromer and Claxby Primary Surveillance Radar
  90. 29Onshore decommissioning
  91. 30Notification of generation of power
  92. 31Amendments to approved details
  93. 32Contaminated land and groundwater scheme
  94. 33Onshore collaboration
  95. 34Mitigation of effects on pink footed geese
  96. 35Obstacle free zone for navigational safety
  97. Part 2: Approval of matters specified in requirements
  98. 1Applications made under requirements
  99. 2Further information
  100. 3Provision of information by Consultees
  101. 4Fees
  102. 5Appeal
  103. Schedule 3: Streets subject to street works
  104. Schedule 4: Public Rights of Way to be temporarily closed
  105. Schedule 5: Streets to be temporarily closed
  106. Schedule 6: Access to works
  107. Schedule 7: Land in which only new rights, etc may be acquired
  108. Schedule 8: Modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants
  109. 1Compensation enactments
  110. 2Paragraph 2
  111. 3Paragraph 3
  112. 4Application of Part 1 of the 1965 Act
  113. 5Paragraph 5
  114. Schedule 9: Land of which only temporary possession may be taken
  115. Schedule 10: Marine Licence 1: Sheringham Shoal Extension Project Offshore Generation – Work Nos. 1A, 2A and 6A or 6C
  116. Part 1: Licensed marine activities
  117. 1Interpretation
  118. 2Details of licensed marine activities
  119. 3Paragraph 3
  120. 4Paragraph 4
  121. 5Paragraph 5
  122. 6Paragraph 6
  123. 7Paragraph 7
  124. 8Paragraph 8
  125. 9Paragraph 9
  126. Part 2: Conditions
  127. 1Design parameters
  128. 2Paragraph 2
  129. 3Paragraph 3
  130. 4Scenarios and Phases of authorised project
  131. 5Vessels under the undertaker’s control
  132. 6Extension of time periods
  133. 7Notifications and inspections
  134. 8Aids to navigation
  135. 9Colouring of Structures
  136. 10Aviation safety
  137. 11Chemicals, drilling and debris
  138. 12Force majeure
  139. 13Pre-construction plans and documentation
  140. 14Site Integrity Plan
  141. 15Approval of programmes, statements etc
  142. 16Offshore safety management
  143. 17Reporting of engaged agents, contractors and vessels
  144. 18Pre-construction monitoring and surveys
  145. 19Construction monitoring and surveys
  146. 20Post-construction monitoring and surveys
  147. 21Reporting of scour and cable protection
  148. 22Completion of construction
  149. 23Sediment Sampling
  150. 24Collaboration
  151. 25Obstacle free zone for navigational safety
  152. Schedule 11: Marine Licence 2: Dudgeon Extension Project Offshore Generation – Work No 1B, 2B and Work No 6B or 6C
  153. Part 1: Licensed marine activities
  154. 1Interpretation
  155. 2Details of licensed marine activities
  156. 3Paragraph 3
  157. 4Paragraph 4
  158. 5Paragraph 5
  159. 6Paragraph 6
  160. 7Paragraph 7
  161. 8Paragraph 8
  162. 9Paragraph 9
  163. Part 2: Conditions
  164. 1Design parameters
  165. 2Paragraph 2
  166. 3Paragraph 3
  167. 4Scenarios and Phases of authorised project
  168. 5Vessels under the undertaker’s control
  169. 6Extension of time periods
  170. 7Notifications and inspections
  171. 8Aids to navigation
  172. 9Colouring of Structures
  173. 10Aviation safety
  174. 11Chemicals, drilling and debris
  175. 12Force majeure
  176. 13Pre-construction plans and documentation
  177. 14Site Integrity Plan
  178. 15Approval of programmes, statements etc
  179. 16Offshore safety management
  180. 17Reporting of engaged agents, contractors and vessels
  181. 18Pre-construction monitoring and surveys
  182. 19Construction monitoring and surveys
  183. 20Post-construction monitoring and surveys
  184. 21Reporting of scour and cable protection
  185. 22Completion of construction
  186. 23Sediment Sampling
  187. 24Collaboration
  188. 25Obstacle free zone for navigational safety
  189. Schedule 12: Marine Licence 3: Sheringham Shoal Extension Project Offshore Transmission – Work Nos 3A to 7A or 3C to 7C
  190. Part 1: Licensed marine activities
  191. 1Interpretation
  192. 2Details of licensed marine activities
  193. 3Paragraph 3
  194. 4Paragraph 4
  195. 5Paragraph 5
  196. 6Paragraph 6
  197. 7Paragraph 7
  198. 8Paragraph 8
  199. 9Paragraph 9
  200. 10Paragraph 10
  201. Part 2: Conditions
  202. 1Design parameters
  203. 2Paragraph 2
  204. 3Scenarios and Phases of authorised project
  205. 4Vessels under the undertaker’s control
  206. 5Extension of time periods
  207. 6Notifications and inspections
  208. 7Aids to navigation
  209. 8Colouring of structures
  210. 9Aviation safety
  211. 10Chemicals, drilling and debris
  212. 11Force majeure
  213. 12Pre-construction plans and documentation
  214. 13Site Integrity Plan
  215. 14Paragraph 14
  216. 15Offshore safety management
  217. 16Reporting of engaged agents, contractors and vessels
  218. 17Pre-construction monitoring and surveys
  219. 18Construction monitoring and surveys
  220. 19Post-construction monitoring and surveys
  221. 20Reporting of scour and cable protection
  222. 21Completion of construction
  223. 22Sediment Sampling
  224. 23Collaboration
  225. 24Seasonal Restriction
  226. 25Obstacle free zone for navigational safety
  227. Schedule 13: Marine Licence 4: Dudgeon Extension Project Offshore Transmission – Work Nos 3B to 7B or 3C to 7C
  228. Part 1: Licensed marine activities
  229. 1Interpretation
  230. 2Details of licensed marine activities
  231. 3Paragraph 3
  232. 4Paragraph 4
  233. 5Paragraph 5
  234. 6Paragraph 6
  235. 7Paragraph 7
  236. 8Paragraph 8
  237. 9Paragraph 9
  238. 10Paragraph 10
  239. 11Paragraph 11
  240. Part 2: Conditions
  241. 1Design parameters
  242. Cables and cable protection
  243. 2Paragraph 2
  244. 3Scenarios and Phases of authorised project
  245. 4Vessels under the undertaker’s control
  246. 5Extension of time periods
  247. 6Notifications and inspections
  248. 7Aids to navigation
  249. 8Colouring of structures
  250. 9Aviation safety
  251. 10Chemicals, drilling and debris
  252. 11Force majeure
  253. 12Pre-construction plans and documentation
  254. 13Site Integrity Plan
  255. 14Paragraph 14
  256. 15Offshore safety management
  257. 16Reporting of engaged agents, contractors and vessels
  258. 17Pre-construction monitoring and surveys
  259. 18Construction monitoring and surveys
  260. 19Post-construction monitoring and surveys
  261. 20Reporting of scour and cable protection
  262. 21Completion of construction
  263. 22Sediment Sampling
  264. 23Collaboration
  265. 24Seasonal Restriction
  266. 25Obstacle free zone for navigational safety
  267. Schedule 14: Protective provisions
  268. Part 1: Protection of electricity, gas, water and sewerage undertakers
  269. 1Paragraph 1
  270. 2Paragraph 2
  271. 3Paragraph 3
  272. 4Acquisition of land
  273. 5Removal of apparatus
  274. 6Facilities and rights for alternative apparatus
  275. 7Retained apparatus
  276. 8Expenses and costs
  277. 9Paragraph 9
  278. 10Miscellaneous
  279. 11Paragraph 11
  280. Part 2: Protection for operators of electronic communications code networks
  281. 1Paragraph 1
  282. 2Paragraph 2
  283. 3Paragraph 3
  284. 4Paragraph 4
  285. Part 3: For the protection of Network Rail Infrastructure Limited
  286. 1Paragraph 1
  287. 2Paragraph 2
  288. 3Paragraph 3
  289. 4Paragraph 4
  290. 5Paragraph 5
  291. 6Paragraph 6
  292. 7Paragraph 7
  293. 8Paragraph 8
  294. 9Paragraph 9
  295. 10Paragraph 10
  296. 11Paragraph 11
  297. 12Paragraph 12
  298. 13Paragraph 13
  299. 14Paragraph 14
  300. 15Paragraph 15
  301. 16Paragraph 16
  302. 17Paragraph 17
  303. 18Paragraph 18
  304. 19Paragraph 19
  305. 20Paragraph 20
  306. 21Paragraph 21
  307. 22Paragraph 22
  308. Part 4: For the protection of the Environment Agency
  309. 1Paragraph 1
  310. 2Submission and approval of plans
  311. 3Construction of protective works
  312. 4Timing of works and service of notices
  313. 5Works not in accordance with this Schedule
  314. 6Maintenance of works
  315. 7Remediating impaired drainage work
  316. 8Agency access
  317. 9Free passage of fish
  318. 10Indemnity
  319. 11Paragraph 11
  320. 12Disputes
  321. Part 5: For the protection of the drainage authorities
  322. 1Paragraph 1
  323. 2Paragraph 2
  324. 3Paragraph 3
  325. 4Paragraph 4
  326. 5Paragraph 5
  327. 6Paragraph 6
  328. 7Paragraph 7
  329. 8Paragraph 8
  330. 9Paragraph 9
  331. 10Paragraph 10
  332. 11Paragraph 11
  333. Part 6: For the protection of National Gas Transmission Plc as Gas Undertaker
  334. 1Application
  335. 2Interpretation
  336. 3On Street Apparatus
  337. 4Apparatus of National Gas Transmission in closed streets
  338. 5Protective works to buildings
  339. 6Acquisition of land
  340. 7Removal of apparatus
  341. 8Facilities and rights for alternative apparatus
  342. 9Retained apparatus: protection
  343. 10Expenses
  344. 11Indemnity
  345. 12Enactments and agreements
  346. 13Co-operation
  347. 14Access
  348. 15Arbitration
  349. 16Notices
  350. Part 7: For the protection of National Grid Electricity Transmission Plc
  351. 1Application
  352. 2Interpretation
  353. 3On Street Apparatus
  354. 4Apparatus of National Grid in closed streets
  355. 5Protective works to buildings
  356. 6Acquisition of land
  357. 7Removal of apparatus
  358. 8Facilities and rights for alternative apparatus
  359. 9Retained apparatus: protection
  360. 10Expenses
  361. 11Indemnity
  362. 12Enactments and agreements
  363. 13Co-operation
  364. 14Access
  365. 15Arbitration
  366. 16Notices
  367. Part 8: For the protection of Cadent Gas Limited as Gas Undertaker
  368. 1Application
  369. 2Interpretation
  370. 3On Street Apparatus
  371. 4Apparatus of Cadent in closed streets
  372. 5Protective works to buildings
  373. 6Acquisition of land
  374. 7Removal of apparatus
  375. 8Facilities and rights for alternative apparatus
  376. 9Retained apparatus: protection of Cadent
  377. 10Expenses
  378. 11Indemnity
  379. 12Enactments and agreements
  380. 13Co-operation
  381. 14Access
  382. 15Arbitration
  383. 16Notices
  384. Part 9: For the protection of Anglian Water Services Limited
  385. 1Application
  386. 2Interpretation
  387. 3Apparatus in closed streets
  388. 4Protective works to buildings
  389. 5Acquisition of land
  390. 6Removal of apparatus
  391. 7Facilities and rights for alternative apparatus
  392. 8Retained apparatus
  393. 9Expenses and costs
  394. 10Paragraph 10
  395. 11Paragraph 11
  396. 12Cooperation
  397. 13Paragraph 13
  398. 14Paragraph 14
  399. 15Paragraph 15
  400. 16Paragraph 16
  401. 17Paragraph 17
  402. Part 10: For the protection of Norfolk Vanguard
  403. 1Paragraph 1
  404. 2Paragraph 2
  405. 3Paragraph 3
  406. 4Paragraph 4
  407. 5Paragraph 5
  408. 6Paragraph 6
  409. 7Paragraph 7
  410. 8Paragraph 8
  411. 9Paragraph 9
  412. 10Paragraph 10
  413. 11Paragraph 11
  414. 12Paragraph 12
  415. 13Paragraph 13
  416. 14Paragraph 14
  417. 15Paragraph 15
  418. 16Paragraph 16
  419. Part 11: For the protection of Norfolk Boreas
  420. 1Paragraph 1
  421. 2Paragraph 2
  422. 3Paragraph 3
  423. 4Paragraph 4
  424. 5Paragraph 5
  425. 6Paragraph 6
  426. 7Paragraph 7
  427. 8Paragraph 8
  428. 9Paragraph 9
  429. 10Paragraph 10
  430. 11Paragraph 11
  431. 12Paragraph 12
  432. 13Paragraph 13
  433. 14Paragraph 14
  434. 15Paragraph 15
  435. 16Paragraph 16
  436. Part 12: For the protection of Eastern Power Networks Plc
  437. 1Application
  438. 2Interpretation
  439. 3Paragraph 3
  440. 4Apparatus of Protected Persons in closed streets
  441. 5Protective works to buildings
  442. 6Acquisition of land
  443. 7Removal of apparatus
  444. 8Facilities and rights for alternative apparatus
  445. 9Retained apparatus: Protection
  446. 10Expenses
  447. 11Paragraph 11
  448. 12Enactments and agreements
  449. 13Co-operation
  450. 14Access
  451. 15Arbitration
  452. Part 13: For the protection of National Highways Limited
  453. 1Application etc.
  454. 2Interpretation
  455. 3General
  456. 4Paragraph 4
  457. 5Paragraph 5
  458. 6Works outside the Order limits
  459. 7Prior approvals and security
  460. 8Construction of the specified works
  461. 9Payments
  462. 10Provisional certificate
  463. 11Opening
  464. 12Final condition survey
  465. 13Defects period
  466. 14Final certificate
  467. 15Security
  468. 16Commuted sums
  469. 17Insurance
  470. 18Indemnity
  471. 19Maintenance of the specified works
  472. 20Land
  473. 21Expert Determination
  474. Part 14: For the protection of Perenco North Sea Limited
  475. 1Application
  476. 2Interpretation
  477. 3Works affecting the facilities
  478. 4Cooperation
  479. Schedule 15: Arbitration Rules
  480. 1Primary objective
  481. 2Time periods
  482. 3Timetable
  483. 4Procedure
  484. 5Arbitrator’s powers
  485. 6Costs
  486. 7Confidentiality
  487. Schedule 16: Hedgerows
  488. 1Removal of Hedgerows
  489. 2Removal of potentially important hedgerows
  490. 3Removal of important hedgerows
  491. Schedule 17: Compensation Measures
  492. Part 1: North Norfolk Coast Special Protection Area / Greater Wash Special Protection Area: Delivery of measures to compensate for sandwich tern loss
  493. 1Paragraph 1
  494. 2Paragraph 2
  495. 3Paragraph 3
  496. 4Paragraph 4
  497. 5Paragraph 5
  498. 6Paragraph 6
  499. 7Paragraph 7
  500. 8Paragraph 8
  501. 9Paragraph 9
  502. 10Paragraph 10
  503. 11Paragraph 11
  504. Part 2: Flamborough and Filey Coast Special Protection Area: Delivery of measures to compensate for kittiwake loss
  505. 12Paragraph 12
  506. 13Paragraph 13
  507. 14Paragraph 14
  508. 15Paragraph 15
  509. 16Paragraph 16
  510. 17Paragraph 17
  511. 18Paragraph 18
  512. 19Paragraph 19
  513. 20Paragraph 20
  514. 21Paragraph 21
  515. 22Paragraph 22
  516. Part 3: Flamborough and Filey Coast Special Protection Area: Delivery of measures to compensate for guillemot loss
  517. 23Paragraph 23
  518. 24Paragraph 24
  519. 25Paragraph 25
  520. 26Paragraph 26
  521. 27Paragraph 27
  522. 28Paragraph 28
  523. 29Paragraph 29
  524. 30Paragraph 30
  525. 31Paragraph 31
  526. 32Paragraph 32
  527. Part 4: Measures of equivalent environmental benefit
  528. 33Paragraph 33
  529. 34Paragraph 34
  530. 35Paragraph 35
  531. 36Paragraph 36
  532. 37Paragraph 37
  533. 38Paragraph 38
  534. 39Paragraph 39
  535. 40Paragraph 40
  536. 41Paragraph 41
  537. 42Paragraph 42
  538. 43Paragraph 43
  539. 44Paragraph 44
  540. Schedule 18: Documents to be certified
  541. Explanatory note