Paragraph 2 Detailed offshore design parametersI1
England and Wales As made
Wind turbine generator dimensions
Subject to sub-paragraph (4), wind turbine generators forming part of the authorised project must not—
exceed a height of 330 metres when measured from HAT to the tip of the vertical blade;
exceed a rotor diameter of 300 metres;
be less than 1.05 kilometres from the nearest wind turbine generator in any direction;
F1not used;
exceed 23 wind turbine generators in respect of the Sheringham Shoal Extension Project offshore works; or
exceed 30 wind turbine generators in respect of the Dudgeon Extension Project offshore works.
F2Within Work No. 1A—
The total rotor swept area must not exceed 1.42 square kilometres; and
the total rotor-swept area and the corresponding air gap for each wind turbine generator must accord with the parameters specified below—
| Where the Total Rotor-Swept Area is | Minimum Air Gap (m) |
|---|---|
| 1.01km2 or less | 30 |
| Greater than 1.01km2 and up to 1.13km2 | 31 |
| Greater than 1.13km2 and up to 1.42km 2 | 32 |
F3Within Work No. 1B—
The total rotor swept area must not exceed 1.85 square kilometres; and
the total rotor-swept area and the corresponding air gap for each wind turbine generator must accord with the parameters specified below—
| Where the Total Rotor-Swept Area is | Minimum Air Gap (m) |
|---|---|
| 1.31km2 or less | 30 |
| Greater than 1.31km2 and up to 1.47km2 | 31 |
| Greater than 1.47km2 and up to 1.85km 2 | 32 |
References to the location of a wind turbine generator are references to the centre point at the base of the wind turbine generator.
Annotations
Textual amendments
- F1
Words in Sch. 2 para. 2(1)(d) substituted (7.2.2025) by virtue ofvirtue ofThe Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm (Amendment) Order 2025 (S.I. 2025/145), arts. 1, 4(a)(ii)
- F2
Sch. 2 para. 2(2) substituted (7.2.2025) by virtue of The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm (Amendment) Order 2025 (S.I. 2025/145), arts. 1, 4(b)
- F3
Sch. 2 para. 2(3) substituted (7.2.2025) by virtue of The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm (Amendment) Order 2025 (S.I. 2025/145), arts. 1, 4(c)
Commencement
- I1
Sch. 2 Pt. 1 para. 2 in force at 9.5.2024, see art. 1