Paragraph 4 Work No. 4I1
England, Wales and Scotland
Works to lay high voltage electrical cables and to extend Sellindge Substation to facilitate grid connection including—
laying of electrical cables to connect Work No. 3 to Sellindge Substation, including tunnelling, boring, open cut trenching and horizontal directional drilling works for trenchless crossings;
works to allow electrical cable crossings of non-navigable rivers, other watercourses and drains, permissive paths, public rights of way and other highways;
works to allow installation of bridge crossings over non-navigable rivers and other watercourses and drains;
crossing of Network Rail infrastructure either—
using existing electrical ducts; or
through the installation of new cable ducts;
laying down of internal access tracks, ramps, means of access, footpaths, roads, landscaping and vegetation management, signage, information boards and temporary secured construction laydown areas; and
extension of the Sellindge Substation including—
installation of new or amended structures, including outdoor air insulated switchgear or indoor gas insulated switchgear, circuit breakers, disconnectors, earth switches, bus-bars, steel supports and ancillary electrical infrastructure;
laying down of access tracks, ramps, means of access, footpaths and roads;
construction of a retaining wall, landscaping and vegetation management, signage, information boards and temporary construction laydown areas;
fencing, gates, boundary treatment and other means of enclosure;
provision of security and monitoring measures such as CCTV columns, lighting columns and lighting, cameras, and communication infrastructure; and
drainage works;
Annotations
Commencement
- I1
Sch. 1 para. 4 in force at 13.11.2025, see art. 1
Notes on the whole SI
Textual amendments
- F1
Words in Preamble substituted (6.2.2026) by The Stonestreet Green Solar (Correction) Order 2026 (S.I. 2026/131), art. 1, Sch.