OpenLegislation

Schedule 5 STREETS SUBJECT TO ALTERATION OF LAYOUTI1

England and Wales

BoroughStreet to be alteredDescription of alterationRelevant Site
London Borough of EalingCanham RoadWorks to provide site access, temporary removal of on street parking, introduction of temporary waiting restrictions and footway widening works.Acton Storm Tanks
London Borough of EalingWarple WayWorks to provide site access, temporary removal of on street parking and introduction of temporary waiting restrictionsActon Storm Tanks
London Borough of EalingStanley GardensWorks associated with the temporary modification to kerb line, temporary removal of on street parking and introduction of temporary waiting restrictionsActon Storm Tanks
London Borough of Hammersmith and FulhamDistillery RoadWorks to provide site accessesHammersmith Pumping Station
London Borough of Hammersmith and FulhamChancellor’s RoadTemporary removal of on street parking and introduction of temporary waiting restrictions. Modification to kerb line on its junction with Distillery RoadHammersmith Pumping Station
London Borough of WandsworthThe EmbankmentWorks to provide site access, temporary removal of on street parking, the introduction of temporary waiting restrictions, formation of access to temporary slipway, temporary suspension of one-way, kerb line modifications and temporary removal of traffic islandPutney Embankment Foreshore
Works associated with environmental enhancement including footway surfacing and street furniture
London Borough of WandsworthGlendarvon StreetTemporary removal of on street parking and introduction of waiting restrictionsPutney Embankment Foreshore
London Borough of WandsworthLower Richmond RoadInstallation of ducting within carriageway and pedestrian site access gatePutney Embankment Foreshore
London Borough of WandsworthPutney High Street/Putney BridgeInstallation of vent columnPutney Embankment Foreshore
Hammersmith and FulhamCarnwath RoadWorks to provide site access, temporary removal of on street parking and introduction of temporary waiting restrictions, footway and junction modifications at its junction with Wandsworth Bridge RoadCarnwath Road Riverside
Hammersmith and FulhamWandsworth Bridge RoadModification to traffic signalised junctionCarnwath Road Riverside
London Borough of WandsworthDormay StreetWorks to provide site accessDormay Street
London Borough of WandsworthThe Causeway

Works to provide site access

Temporary removal of on street parking and introduction of temporary waiting restrictions

Dormay Street
London Borough of WandsworthArmoury WayTemporary kerb line and junction modificationsDormay Street
London Borough of WandsworthNeville Gill CloseProvision of construction access, temporary modification to kerb lines and pedestrian refugeKing George’s Park
London Borough of WandsworthBuckhold RoadModification to kerb lines, pedestrian refuge and park entranceKing George’s Park
London Borough of WandsworthYork RoadWorks to provide site accesses and works associated with the relocation of bus stop facilitiesFalconbrook Pumping Station
London Borough of WandsworthYork GardensWoks to provide site access and temporary removal of parkingFalconbrook Pumping Station
Royal Borough of Kensington and ChelseaLots RoadWorks to provide site access, temporary removal of on street parking and introduction of temporary waiting restrictionsCremorne Wharf Depot
Royal Borough of Kensington and ChelseaChelsea Embankment

Works to provide site accesses

Works to facilitate the provision of traffic management including provision of a temporary formal crossing, temporary removal of traffic island, provision of site hoarding

Works associated with environmental enhancement including footway surfacing and street furniture

Chelsea Embankment Foreshore
Royal Borough of Kensington and ChelseaThe Bull RingWorks associated with environmental enhancement including footway and carriageway surfacing and street furnitureChelsea Embankment Foreshore
London Borough of WandsworthKirtling Street

Works to provide site access, the provision of traffic management, temporary removal of on street parking and introduction of temporary waiting restrictions

Works to undertake environmental enhancements

Kirtling Street
London Borough of WandsworthCringle Street

Works to provide site access

Works to undertake carriageway crossing for services

Works associated with environmental enhancement including footway surfacing and street furniture

Kirtling Street
London Borough of WandsworthNine Elms Lane

Works to provide site access

Works associated with environmental enhancement including footway surfacing, tree planting, and street furniture

Heathwall Pumping Station
London Borough of LambethAlbert EmbankmentWorks to provide site accessAlbert Embankment Foreshore
City of WestminsterVictoria Embankment

Works to provide site access.

Works to facilitate the provision of traffic management, modification to waiting restrictions, removal of central carriageway reserve, provision of site hoarding, removal of cycle parking station

F1Works to facilitate the provision of access to boat moorings

Works associated with environmental enhancement including footway surfacing and street furniture

Works to construct a ramp and stairs on the footway

Victoria Embankment Foreshore
City of LondonVictoria Embankment / Blackfriars Underpass / Blackfriars Bridge head / Blackfriars Bridge

Works to provide site access.

Provision of traffic management including modification to waiting restrictions/loading bays, provision of site hoarding

Works to facilitate the temporary and permanent provision of access to boat moorings

Works associated with environmental enhancement including footway surfacing, step access from Blackfriars Bridge, lift access from Blackfriars Bridge, and street furniture

Works to construct a ramp and stairs on the footway

Blackfriars Bridge Foreshore
City of LondonNew Bridge Street / Blackfriars Bridge / Blackfriars Bridge head

Provision of Temporary traffic management

Provision of pedestrian lift

Blackfriars Bridge Foreshore
City of LondonWhite Lion HillModification of kerb, boundary wall, railing and provision of loading bayBlackfriars Bridge Foreshore
London Borough of SouthwarkMaguire Street and Shad Thames

Works to provide site access

Works for the provision of traffic management, provision of temporary turning head, temporary removal of on street parking, introduction of temporary waiting restrictions and works for the provision of chambers, pipeline and ducts

Shad Thames Pumping Station
London Borough of SouthwarkGainsford StreetWorks for the provision of in sewer equipmentShad Thames Pumping Station
London Borough of SouthwarkChambers Street

Works to provide site access

The temporary removal of on street parking and introduction of temporary waiting restrictions

Chambers Wharf
London Borough of SouthwarkLoftie StreetWorks to provide site accessChambers Wharf
London Borough of SouthwarkBevington StreetThe temporary removal of on street parking and introduction of temporary waiting restrictions, provision of temporary pedestrian refugeChambers Wharf
London Borough of SouthwarkCroft Street

The temporary removal of on street parking and introduction of temporary waiting restrictions modification to traffic calming features

Service connection to existing sewer

Earl Pumping Station
London Borough of SouthwarkChilton GroveWorks to provide site access and service connections to existing sewer, temporary removal of traffic calming, on street parking and introduction of temporary waiting restrictionsEarl Pumping Station
London Borough of LewishamCroft Street

Works to provide site access

The temporary removal of on street parking and introduction of temporary waiting restrictions, modification to traffic calming features.

Service connection to existing sewer

Earl Pumping Station
London Borough of LewishamYeoman StreetWorks to provide site access, service connections to existing sewer, temporary removal of traffic calming, on street parking and introduction of temporary waiting restrictionsEarl Pumping Station
London Borough of LewishamChilton GroveWorks to provide site access, service connections to existing sewer, temporary removal of traffic calming, on street parking and introduction of temporary waiting restrictionsEarl Pumping Station
London Borough of LewishamDeptford Church Street

Works associated with the temporary suspension of the pedestrian crossing, provision of temporary pedestrian crossing, temporary removal of central carriageway divide, temporary removal of bus lanes. Temporary relocation of bus stops introduction of temporary waiting restrictions

Works associated with environmental enhancement including footway surfacing and street furniture

Deptford Church Street
London Borough of LewishamCoffey Street

Works to provide site access

Temporary removal of on street parking and introduction of temporary waiting restrictions

Works associated with temporary one way use, including associated signs

Works associated with environmental enhancement including footway surfacing and street furniture

Deptford Church Street
London Borough of LewishamCrossfield Street

Works to provide site access

Temporary removal of on street parking and introduction of temporary waiting restrictions.

Works associated with temporary one way use, including associated signs

Works to form a temporary traffic management system and emergency evacuation point

Works associated with the provision of a temporary section of carriageway linking Crossfield Road to Coffey Street

Works associated with environmental enhancement including footway surfacing and street furniture

Deptford Church Street
Royal Borough of GreenwichNorman RoadWorks to provide site accessGreenwich Pumping Station
Royal Borough of GreenwichGreenwich High RoadWorks to provide site accessGreenwich Pumping Station
Royal Borough of GreenwichUnnamed pedestrian/cycle route between Norman Road and CreeksideTemporary diversion of route and associated worksGreenwich Pumping Station
London Borough of Tower HamletsGlamis Road

Works to provide site access

Temporary removal of on street parking and introduction of temporary waiting restrictions, modification to traffic signal stop lines

King Edward Memorial Park Foreshore
London Borough of Tower HamletsBekesbourne StreetTemporary removal of on street parking and introduction of temporary waiting restrictions, provision of construction area, provision of plant (control kiosk)Bekesbourne Street
London Borough of Tower HamletsRatcliffe LaneProvision of construction area, provision of plant (vent pipe), temporary removal of on street parking and introduction of temporary waiting restrictionsBekesbourne Street
London Borough of NewhamGay RoadWorks to provide site access, temporary removal of on street parking, and the introduction of temporary waiting restrictionsAbbey Mills Pumping Station
London Borough of NewhamAbbey LaneTemporary removal of on street parking and introduction of temporary waiting restrictionsAbbey Mills Pumping Station
London Borough of NewhamJenkins LaneWorks to provide construction / permanent site accessBeckton Sewage Treatment Works

Annotations

Textual amendments

F1

Words in Sch. 5 Table substituted (24.11.2022) by The Thames Water Utilities Limited (Thames Tideway Tunnel) (Amendment) Order 2022 (S.I. 2022/1242), art. 1(1), Sch. 4 Table

Commencement

I1

Sch. 5 in force at 24.9.2014, see art. 1