Part 1 Authorised developmentI1
England and Wales
A wind energy electricity generating station with an installed capacity of between 64 and 96MW comprising a nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act consisting of—
Work No. 1 – Up to 32 wind turbines each sited on concrete foundations incorporating hardstanding for cranes, each turbine being fitted with rotating blades and having a height to blade tip of up to 145 metres and including external transformers located at the base of the turbine. The wind turbines comprising Work No. 1 will be situated at the following locations—
Wind turbine number Grid reference Easting Northing WT 1 301118 358328 WT 2 301550 358106 WT 3 301063 357801 WT 4 300021 357651 WT 5 300510 357483 WT 6 301065 357256 WT 7 300449 357030 WT 8 301282 356957 WT 9 300057 356694 WT 10 301308 356533 WT 11 301151 356100 WT 12 300741 355620 WT 13 301320 355593 WT 14 300957 355275 WT 15 301512 355170 WT 16 301081 354833 WT 17 301599 354551 WT 18 301885 354174 WT 19 302153 353716 WT 20 301561 353647 WT 21 300770 353343 WT 22 301297 353291 WT 23 302358 353159 WT 24 300610 352531 WT 25 301716 352540 WT 26 301193 352528 WT 27 302724 352076 WT 28 300752 352025 WT 29 301198 351850 WT 30 301382 351501 WT 31 300880 350721 WT 32 301232 350505 In Work No. 1, references to the locations of a wind turbine are references to the centre point of that turbine.
Work No. 2A – A series of electrical cables with a nominal voltage of 33 kilovolts together with a cable for the transmission of electronic communications buried beneath the surface of the ground along the general line of the tracks and roads comprised in Work No. 3 and connecting the wind turbines comprising Work No. 1 and the onsite electricity substation comprising Work No. 5A arranged in the following circuit routes—
Cable circuit route number Commencement point Termination point 1 Substation forming Work No. 5A WT1 WT1 WT2 WT2 WT3 WT3 WT4 WT4 WT5 WT5 WT7 WT7 WT9 2 Substation forming Work No. 5A WT6 WT6 WT8 WT8 WT10 WT10 WT11 WT11 WT12 WT12 WT13 WT13 WT14 3 Substation forming Work No. 5A WT15 WT15 WT16 WT16 WT17 WT17 WT18 WT18 WT20 WT20 WT21 4 Substation forming Work No. 5A WT19 WT19 WT22 WT22 WT23 WT23 WT24 WT24 WT26 WT26 WT28 5 Substation forming Work No. 5A WT25 WT25 WT27 WT27 WT29 WT29 WT30 WT30 WT31 WT31 WT32 Work No. 2B – A series of electrical cables with a nominal voltage of 33 kilovolts together with a cable for the transmission of electronic communications buried beneath the surface of the ground along the general line of the tracks and roads comprised in Work No. 3 and connecting the wind turbines comprising Work No. 1 and the onsite electricity substation comprising Work No. 5B arranged in the following circuit routes—
Cable circuit route number Commencement point Termination point 1 Substation forming Work No. 5B WT24 WT24 WT26 WT26 WT28 WT28 WT30 WT30 WT31 WT31 WT32 2 Substation forming Work No. 5B WT19 WT19 WT22 WT22 WT23 WT23 WT25 WT25 WT27 WT27 WT29 3 Substation forming Work No. 5B WT15 WT15 WT16 WT16 WT17 WT17 WT18 WT18 WT20 WT20 WT21 4 Substation forming Work No. 5B WT6 WT6 WT8 WT8 WT10 WT10 WT11 WT11 WT12 WT12 WT13 WT13 WT14 5 Substation forming Work No. 5B WT1 WT1 WT2 WT2 WT3 WT3 WT4 WT4 WT5 WT5 WT7 WT7 WT9 Work No. 3 – F1A series of new tracks, existing tracks subject to improvement and widening, public roads subject to widening and a series of turning heads located adjacent to tracks as described in the following tables—
New tracks
Access track no Commencement point Termination point Easting Northing Easting Northing N1 301053 354912 301148 354923 N2 301732 353137 301759 353249 N7 F2300704 F3357556 301053 357760 N9 300551 354816 300680 354787 N12 301051 357035 301004 356965 N13 300997 356851 301005 356965 N14 301018 355995 301095 355964 N15 300780 355350 300896 355416 N18 301763 352551 301682 352621 N19 301187 352084 301232 351977 N20 300744 358780 300798 358668 N21 299761 357707 299720 357850 N22 300062 357628 299986 357686 N23 301289 352268 301345 352245 N24 301203 352481 301211 352434 N4 301260 351872 301521 351501 F4N25 300509 357483 300277 357467 N26 300596 357354 300614 357029 N27 301133 355580 300866 355375 N28 300784 355332 300534 355065 New spur tracks
Access track no Commencement point Termination point Easting Northing Easting Northing S1 301062 358319 301118 358328 S2 301515 358109 301549 358107 S3 301063 357801 301069 357772 S4 300030 357651 300021 357651 S5 300740 357556 300509 357483 S6 301122 357097 301065 357256 S7 300529 356984 300449 357030 S8 301122 357097 301282 356957 S9 300069 356708 300057 356694 S10 301343 356415 301308 356533 S11 301151 356100 301108 355973 S12 300741 355620 300999 355802 S13 301084 355554 301320 355593 S14 300834 355306 300957 355275 S15 301438 355078 301511 355170 S16 301081 354834 301063 354899 S17 301554 354556 301599 354551 S18 301885 354174 301845 354063 S19 301875 353692 302153 353716 S20 301475 353692 301561 353647 S21 300739 353256 300770 353343 S22 301295 353259 301297 353291 S23 302199 353104 302358 353159 S24 300686 352482 300610 352531 S25 301716 352540 301717 352591 S26 301268 352594 301193 352528 S27 302263 351904 302723 352077 S28 300841 352162 300841 352161 S29 301235 351963 301198 351850 S30 301378 351623 301382 351501 S31 301678 350884 300880 350721 S32 301301 350647 301232 350505 SMM1 299997 356584 299893 356575 SMM2 300653 351909 300734 351823 Existing tracks subject to improvement and widening
Access track no Commencement point Termination point Easting Northing Easting Northing E1 300890 358336 301051 358313 E2 301051 358313 301375 358861 E5 300649 357389 300023 357656 E6 F5300614 F6357029 301001 356966 E7 301001 356966 301122 357097 E8 300624 357064 300325 356915 E9 300330 356917 300224 356913 E10 300224 356913 299997 356584 E11 300781 355353 301103 355969 E12 301103 355970 301343 356415 E13 300570 355106 300609 354651 E14 300604 354689 300695 354798 E15 300695 354798 301053 354912 E16 301148 354922 301442 355081 E17 300609 354649 300728 354115 E18 300706 354150 301554 354556 E19 300729 354114 300659 353686 E20 300658 353686 300511 353164 E21 300510 353161 301845 354063 E22 300510 353161 300777 353046 E23 300775 353045 301194 353212 E24 301197 353212 301877 353693 E25 301196 353212 301707 353255 E26 301709 353255 301829 353240 E27 301833 353239 301908 353231 E28 301895 353232 302199 353104 E29 301731 353137 301309 352690 E30 301310 352692 300686 352482 E31 301311 352692 301191 352457 E32 301191 352456 301307 352227 E33 301191 352457 300653 351909 E34 301307 352227 301408 352268 E35 301408 352268 301552 352563 E36 301549 352557 301681 352621 E37 301849 352476 302224 352055 E38 302225 352055 302263 351904 E40 301307 352227 301187 352084 E41 301233 351978 301259 351861 E43 301521 351501 301693 351263 E46 301678 350885 301300 350648 E50 300997 356851 301018 355898 E51 301047 354916 301151 354924 E53 301053 357760 301515 358109 E54 301682 352621 301848 352477 E56 301678 350885 301693 351263 E57 300023 357656 299761 357707 Public roads subject to widening
Public road no Commencement point Termination point Easting Northing Easting Northing PR1 300744 358778 300624 357351 PR2 300624 357351 300634 357032 PR3 301085 355555 300571 355108 PR5 302454 350166 301749 351092 F7Turning Heads
Grid reference Turning head number Easting Northing TH1 (at T3) 301166 357866 TH2 (between T7 and T9) 300226 356920 TH3 (at T10) 301344 356350 TH4 (at T13 301221 355570 TH5 (at T15) 301436 355089 TH6 (at T17) 301501 354506 TH7 (at T18) 301833 354061 TH8 (at T24) 300672 352492 TH9 (at T25) 301854 352484 TH10 (at T28) 300817 352143 TH11 (at T30) 301367 351613 TH12 (at T31) 300989 350791 TH13 (at T32) 301314 350614 In constructing Work No. 3 the undertaker may—
- (a)
provide temporary passing places for construction vehicles at any location along the line of the work shown on the works plan within the limits of deviation for Work No. 3; and
- (b)
construct culverts to carry any watercourse under Work No. 3 and extend or replace any existing culvert to carry such a watercourse.
- (a)
Work No. 4A – A widening of part of the of the unnamed public road shown as PR1 at X on Works Plan 1 to provide construction, maintenance and emergency site access commencing at Ordnance Survey National Grid Reference Point SJ0074458778.
Work No. 4B – A widening of part of the of the unnamed public road shown as PR5 at X on Works Plan 7 to provide construction, maintenance and emergency site access commencing at Ordnance Survey National Grid Reference Point SJ0245550165.
Work No. 5A – An onsite electricity substation comprising an enclosed area of hardstanding of 4080 square metres located at Ordnance Survey National Grid Reference Point SJ0136958813 and including a control building to house switch gear and control equipment.
Work No. 5B – An onsite electricity substation comprising an enclosed area of hardstanding of 4080 square metres located at Ordnance Survey National Grid Reference Point SJ0215150472 and including a control building to house switch gear and control equipment.
Work No. 6 – A meteorological mast for the purpose of monitoring and recording wind speed and direction as well as air temperature, having a height of 100 metres and sited on an area of hardstanding of 900 square metres and located at Ordnance Survey National Grid Reference Point SH9989356575. Work No. 6 includes a cable for the transmission of electronic communications from wind turbine No. 9 comprised in Work No. 1 along the line of existing track No. E10 and new spur track No. SMM1 comprised in Work No. 3.
Work No. 7 – A meteorological mast for the purpose of monitoring and recording wind speed and direction as well as air temperature, having a height of 100 metres and sited on an area of hardstanding of 900 square metres and located at Ordnance Survey National Grid Reference Point SJ0073551823. Work No. 7 includes a cable for the transmission of electronic communications along the line of existing track No. E33 from its junction with new spur track No. S28 and new spur track No. SMM2 comprised in Work No. 3.
Work No. 8 – A temporary civil construction compound comprising an enclosed area of hardstanding of 2500 square metres located at Ordnance Survey National Grid Reference Point SJ0095558354 and including a temporary office and staff welfare building together with an area for the storage of materials for use in the construction of the authorised development.
Work No. 9 – A temporary civil construction compound comprising an enclosed area of hardstanding of 2500 square metres located at Ordnance Survey National Grid Reference Point SJ0178451133 and including a temporary office and staff welfare building together with an area for the storage of materials for use in the construction of the authorised development.
Work No. 10 – A borrow pit for the extraction of stone to be used in the construction of the authorised development, having an area of 39,200 square metres and a depth of up to 18 metres located at Ordnance Survey National Grid Reference Point SJ0189157562.
Work No. 11 – A borrow pit for the extraction of stone to be used in the construction of the authorised development, having an area of approximately 13,600 square metres and a depth of up to 16 metres located at Ordnance Survey National Grid Reference Point SJ0246654106.
Work No. 12 – A borrow pit for the extraction of stone to be used in the construction of the authorised development, having an area of approximately 18,300 square metres and a depth of up to 20 metres located at Ordnance Survey National Grid Reference Point SJ0185151493.
Work No. 13 – A borrow pit for the extraction of stone to be used in the construction of the authorised development, having an area of approximately 11,300 square metres and a depth of up to 19 metres located at Ordnance Survey National Grid Reference Point SJ0078050630.
Work No. 14A – A temporary electrical compound comprising an enclosed area of hardstanding of 2500 square metres located adjacent to the onsite electricity substation forming Work No. 5A at Ordnance Survey National Grid Reference Point SJ0131558784.
Work No. 14B – A temporary electrical compound comprising an enclosed area of hardstanding of 2500 square metres located adjacent to the onsite electricity substation forming Work No. 5B at Ordnance Survey National Grid Reference Point SJ0219750429.
Annotations
Textual amendments
- F1
Words in Sch. 1 Pt. 1 substituted (8.12.2017) by The Clocaenog Forest Wind Farm (Amendment) Order 2017 (S.I. 2017/1197), arts. 1, 5(1)
- F2
Word in Sch. 1 Pt. 1 table entitled "New tracks" substituted (8.12.2017) by The Clocaenog Forest Wind Farm (Amendment) Order 2017 (S.I. 2017/1197), arts. 1, 5(3)(a)(i)
- F3
Word in Sch. 1 Pt. 1 table entitled "New tracks" substituted (8.12.2017) by The Clocaenog Forest Wind Farm (Amendment) Order 2017 (S.I. 2017/1197), arts. 1, 5(3)(a)(ii)
- F4
Words in Sch. 1 Pt. 1 table entitled "New tracks" inserted (8.12.2017) by The Clocaenog Forest Wind Farm (Amendment) Order 2017 (S.I. 2017/1197), arts. 1, 5(3)(b)
- F5
Word in Sch. 1 Pt. 1 table entitled "Existing tracks subject to improvement and widening" substituted (8.12.2017) by The Clocaenog Forest Wind Farm (Amendment) Order 2017 (S.I. 2017/1197), arts. 1, 5(4)(a)
- F6
Word in Sch. 1 Pt. 1 table entitled "Existing tracks subject to improvement and widening" substituted (8.12.2017) by The Clocaenog Forest Wind Farm (Amendment) Order 2017 (S.I. 2017/1197), arts. 1, 5(4)(b)
- F7
Sch. 1 Pt. 1 table inserted (8.12.2017) by The Clocaenog Forest Wind Farm (Amendment) Order 2017 (S.I. 2017/1197), arts. 1, 5(5)
Commencement
- I1
Sch. 1 Pt. 1 in force at 2.10.2014, see art. 1