OpenLegislation

Paragraph 6 Pre-development groundwater table level surveyI1

England, Wales and Scotland

(1)

Work No. 1 must not commence until the undertaker has carried out the groundwater table level survey and the results of that survey have been submitted in writing to and, after consultation with the Environment Agency, approved by the planning authority.

(2)

In subparagraph (1), “the groundwater table level survey” means a survey which—

(a)

is carried out within the three existing boreholes on the Order land shown in the Geotechnical Site Investigation Report in Appendix 13A to the environmental statement or within such other boreholes on the Order land as the planning authority, after consultation with the Environment Agency, may approve,

(b)

is carried out over a period of 12 months, and

(c)

establishes the groundwater table level at each of those locations.

Annotations

Commencement

I1

Sch. 2 para. 6 in force at 19.11.2015, see art. 1(2)