Schedule 2 REQUIREMENTS
England, Wales and Scotland
- 1Commencement of the authorised development
- 2Commercial use
- 3Fuel type
- 4Detailed design
- 5Design of fuel storage bunker
- 6Pre-development groundwater table level survey
- 7Provision of landscaping
- 8Implementation and maintenance of landscaping
- 9External lighting
- 10Highway accesses
- 11Fencing – A1(M)
- 12Fencing and other means of enclosure
- 13Surface and foul water drainage
- 14Flood risk mitigation
- 15Contaminated land and groundwater
- 16Archaeology
- 17Biodiversity enhancement and management plan
- 18Construction environmental management plan
- 19Construction traffic routing and management plan
- 20Construction hours
- 21Piling and penetrative foundation design
- 22Construction – A1(M)
- 23Control of noise during construction
- 24Control of operational noise
- 25Control of odour emissions
- 26Control of dust emissions
- 27Control of smoke emissions
- 28Control of steam emissions
- 29Control of insects and vermin
- 30Accumulations and deposits
- 31Restoration of land used temporarily for construction
- 32Operational traffic routing and management plan
- 33Travel plan – operational staff
- 34Operational deliveries
- 35Sustainable fuel transport management plan
- 36Enclosure of loads
- 37Air quality – emissions reduction
- 38Air quality monitoring
- 39Fire prevention
- 40Combined heat and power (“CHP”)
- 41Waste hierarchy scheme
- 42Waste management – construction and operational waste
- 43Decommissioning
- 44Aviation warning lighting
- 45Air safety
- 46Site security
- 47Local liaison committee
- 48Employment, skills and training plan
- 49Interpretation