The Ferrybridge Multifuel 2 Power Station Order 2015
S.I. 2015/1832 · Made 28 October 2015 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 28th October 2015
Coming into force 19th November 2015
The application was examined by a single appointed person (appointed by the Secretary of State) in accordance with Chapter 4 of Part 6 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 2010f3.
The single appointed person, having considered the application with the documents that accompanied it and the representations made and not withdrawn, has submitted a report with a recommendation to the Secretary of State.
The Secretary of State, having considered the report and recommendation of the single appointed person, has decided the application and determined to make an Order giving effect to the proposals comprised in the application with modifications which in the opinion of the Secretary of State do not make substantial changes to the proposals.
The Secretary of State, in exercise of the powers conferred by sections 114, 115 and 120 of the 2008 Act, makes the following Order—C1
Annotations to the whole text
Modifications
- C1
Order modified (20.9.2018) by The Ferrybridge Multifuel 2 Power Station (Amendment) Order 2018 (S.I. 2018/1016), arts. 1, 3(4)
Footnotes
- f1
- f2
- f3
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- 3Electronic communications
- Part 2: PRINCIPAL POWERS
- 4Development consent granted by this Order
- 5Limits of deviation
- 6Authorisation of the operation of the authorised development
- 7Power to maintain the authorised development
- 8Transfer of the benefit of this Order
- Part 3: SUPPLEMENTARY POWERS
- 9Street works
- 10Access to works
- 11Agreements with street authorities
- 12Discharge of water
- 13Authority to survey and investigate the land
- 14Felling or lopping of trees
- 15Rights under or over streets
- 16Statutory undertakers
- 17Recovery of costs of new connections
- Part 4: MISCELLANEOUS AND GENERAL
- 18Defence to proceedings in respect of statutory nuisance constituted by noise emitted from premises
- 19Procedures for approvals etc. required by the requirements
- 20Removal of human remains
- 21Application of landlord and tenant law
- 22Operational land for the purposes of the Town and Country Planning Act 1990
- 23Certification of documents
- 24Arbitration
- Signature
- Schedule 1AUTHORISED DEVELOPMENT
- Schedule 2: REQUIREMENTS
- 1Commencement of the authorised development
- 2Commercial use
- 3Fuel type
- 4Detailed design
- 5Design of fuel storage bunker
- 6Pre-development groundwater table level survey
- 7Provision of landscaping
- 8Implementation and maintenance of landscaping
- 9External lighting
- 10Highway accesses
- 11Fencing – A1(M)
- 12Fencing and other means of enclosure
- 13Surface and foul water drainage
- 14Flood risk mitigation
- 15Contaminated land and groundwater
- 16Archaeology
- 17Biodiversity enhancement and management plan
- 18Construction environmental management plan
- 19Construction traffic routing and management plan
- 20Construction hours
- 21Piling and penetrative foundation design
- 22Construction – A1(M)
- 23Control of noise during construction
- 24Control of operational noise
- 25Control of odour emissions
- 26Control of dust emissions
- 27Control of smoke emissions
- 28Control of steam emissions
- 29Control of insects and vermin
- 30Accumulations and deposits
- 31Restoration of land used temporarily for construction
- 32Operational traffic routing and management plan
- 33Travel plan – operational staff
- 34Operational deliveries
- 35Sustainable fuel transport management plan
- 36Enclosure of loads
- 37Air quality – emissions reduction
- 38Air quality monitoring
- 39Fire prevention
- 40Combined heat and power (“CHP”)
- 41Waste hierarchy scheme
- 42Waste management – construction and operational waste
- 43Decommissioning
- 44Aviation warning lighting
- 45Air safety
- 46Site security
- 47Local liaison committee
- 48Employment, skills and training plan
- 49Interpretation
- Schedule 3MAXIMUM BUILDING DIMENSIONS
- Schedule 4MINIMUM BUILDING DIMENSIONS
- Schedule 5STREETS SUBJECT TO STREET WORKS
- Schedule 6ACCESS TO WORKS
- Schedule 7: PROCEDURES FOR APPROVALS ETC. REQUIRED BY THE REQUIREMENTS
- 1Application of this Schedule
- 2Decision period
- 3Further information
- 4Fees
- 5Appeal to the Secretary of State (procedure)
- 6Appeal to the Secretary of State (powers of the appointed person)
- 7Appeal to the Secretary of State (supplementary)
- Explanatory note