Schedule 13 DOCUMENTS AND PLANS TO BE CERTIFIEDI1
England, Wales and Scotland
Table 1
(1) Document name | (2) Document reference | (3) Revision number | (4) Date |
|---|---|---|---|
| biodiversity design strategy | 7.3.B | 1.0 | February 2022 |
| book of reference | 4.3(B) | 3.0 | January 2023 |
| Bulls Lodge substation extension drainage strategy | Appendix 9D contained in the environmental statement (document reference 6.2) | 1.0 | F1November 2021 |
| decommissioning strategy | 7.12(A) | 2.0 | August 2022 |
| environmental statement | environmental statement volume 1: 6.1 (excluding chapters 2, F2..., 7, 10, 14) | >1.0 | February 2022 |
| environmental statement volume 1: 6.1(A) (chapters 2, and 10) | 2.0 | August 2022 | |
| F3. . . | . . . | . . . | |
| environmental statement volume 1: 6.1(B) (chapter 7) | 3.0 | September 2022 | |
| environmental statement volume 1: 6.1(A) (chapter 14) | 2.0 | November 2022 | |
| environmental statement volume 2: 6.2 (excluding appendices 2A, 7A, 9A, F49D, 10F, 13B , 13C ) | 1.0 | February 2022 | |
| environmental statement volume 2: 6.2(A) (appendix 2A) | 2.0 | December 2022 | |
| environmental statement volume 2: 6.2(A) (appendix 7A) | 2.0 | September 2022 | |
| environmental statement volume 2: 6.2(A) (appendices 9A, 10F) | 2.0 | August 2022 | |
| F5environmental statement volume 2: 6.2(B) (appendix 9D) | 1.0 | November 2021 | |
| environmental statement volume 2: 6.2 (B) (appendix 13B) | 5.0 | January 2023 | |
| environmental statement volume 2: 6.2(A) (appendix 13C) | 2.0 | October 2022 | |
| environmental statement volume 3: 6.3 (excluding figures ..., 2-5, 2-27, 2-32, 10-10-2, 10-12, 10-13 (visualisations 4 and 5 of 5) and 10-15) | 1.0 | February 2022 | |
| environmental statement volume 3: 6.3(A) (figure 2-3) | 2.0 | August 2022 | |
| . . . | 2.0 | September 2022 | |
| environmental statement volume 3: 6.3(A) (figure 10-13 (visualisations 4 and 5 of 5)) | 2.0 | October 2022 | |
| environmental statement volume 3 6.3(C) (figure 10-15) | 4.0 | November 2022 | |
| environmental statement volume 3: 6.3B (figure 2-5) | 3.0 | December 2022 | |
| >environmental statement volume 3: 6.3B (figure 2-27) | 3.0 | December 2022 | |
| cable route and substation ecology survey: 8.7 | 1.0 | August 2022 | |
| Wheeler’s Hill and Cranham Road ecology survey: 8.8 | 1.0 | August 2022 | |
| arboricultural impact assessment 8.13 | 1.0 | October 2022 | |
| Phase 1 ecology survey report 8.14 | 1.0 | October 2022 | |
| Ecology appraisal for Boreham Road AIL Access 8.18 | 1.0 | November 2022 | |
| flood risk assessment | Appendix 9A contained in the environmental statement (document reference 6.2(A)) | 2.0 | August 2022 |
| framework construction traffic management plan | Appendix 13B contained in the environmental statement (document reference 6.2 F6(B) ) | 5.0 | January 2023 |
| land plans | 2.1(A) | 2.0 | September 2022 |
| outline battery safety management plan | 7.6 | 1.0 | February 2022 |
| outline construction environmental management plan | 7.10(C) | 4.0 | November 2022 |
| outline design principles | 7.3.A(D) | 5.0 | December 2022 |
| outline landscape and ecological management plan | 7.13 (D) | 6.0 | January 2023 |
| outline operational environmental management plan | 7.11 (A) | 4.0 | November 2022 |
| outline public rights of way management plan | Appendix 13C contained in the environmental statement (document reference 6.2(A)) | 2.0 | October 2022 |
| outline soils resource management plan | 8.16 | 1.0 | October 2022 |
| overarching written scheme of investigation | 8.11(A) | 2.0 | October 2022 |
| permissive paths plans | 7.14(A) | 2.0 | January 2023 |
| streets, access and rights of way plans | 2.3(A) | 2.0 | October 2022 |
| SuDS strategy | Appendix 9C contained in the environmental statement (document reference 6.2) | 1.0 | February 2022 |
| traffic regulation measures plans | 2.4 | 1.0 | February 2022 |
| vegetation removal plan | Figure 10-15 (document reference 6.3(C)) | 4.0 | November 2022 |
| works plans | 2.2(B) | 3.0 | October 2022 |
Annotations
Textual amendments
- F1
Words in Sch. 13 substituted (21.11.2023) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch.
- F2
Word in Sch. 13 omitted (21.11.2023) by virtue of The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch.
- F3
Words in Sch. 13 omitted (21.11.2023) by virtue of The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch.
- F4
Word in Sch. 13 inserted (21.11.2023) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch.
- F5
Words in Sch. 13 inserted (21.11.2023) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch.
- F6
Word in Sch. 13 substituted (21.11.2023) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch.
Commencement
- I1
Sch. 13 in force at 18.7.2023, see art. 1