Part 2 PARAMETERS TABLEI1
England, Wales and Scotland
(1) Component | (2) Maximum dimensions (m) | (2) Maximum height above Finished Floor Level (FFL) (m) | (2) Maximum height AOD (m) | |
|---|---|---|---|---|
| ERF (Work No. 1) | Tipping hall | 87.5 x 60 | 31 | 37.6 |
| Bunker hall | 92 x 40 | 43 | 49.6 | |
| Boiler hall | 105 x 60 | 55 | 61.6 | |
| Flue gas treatment hall | 41 x 60 | 45 | 51.6 | |
| Turbine hall | 80 x 37 | 25 | 31.6 | |
| Bottom ash hall | 37 x 37 | 25 | 31.6 | |
| Transformer compound | 52 x 22 | 10 | 16.6 | |
| Switchyard | 93 x 44 | 10 | 14.6 | |
| Offices and admin facilities | 30 x 100 | 43 | 49.6 | |
| Fire water tank | 11.3 diameter | 19.3 | 25.9 | |
| Fire water pumphouse | 6 x 6 | 6.5 | 13.1 | |
| Gatehouses | 32 x 12 | 5 | 11.6 | |
| Visual barriers | 4.5 | 11.1 | ||
| ERF stack windshield (Work No. 1A) | 10 diameter | 120 | 126.6 | |
| Back up boilers stack windshield (Work No. 1A) | 3 diameter | 53 | 59.6 | |
| Back-up generator stack (Work No. 1A) | 0.85 diameter | 55 | 61.6 | |
| Carbon capture utilisation and storage facility (Work No. 1B) | 79 x 66 | 50 | 56.6 | |
| Carbon dioxide storage tanks (Work No. 1B) | 28 x 20 | 20 | 26.6 | |
| Visitor centre (Work No. 1C) | 41 x 36 | 16 | 19.05 | |
| Elevated walkway (Work No. 1 and 1C) | 700 x 4 | 12 | 17.05 | |
| Air-cooled condensers/Air blast chillers (Work No. 1D) | 75 x 35 | 50 | 56.6 | |
| RHTF and CBMF (Work No. 2) | process building and storage areas | 280 x 130 | 25 | 30.1 |
| Admin buildings | 62 x 10 | 21 | 26.1 | |
| Rail Infrastructure (Work No. 3) | Footbridge No. 1 | 55.385 | ||
| Footbridge No. 2 | 48.561 | |||
| Access road (Work No. 5) | 5.2 | |||
| Plastic recycling facility (Work No. 6) | Pre-processed material storage | 65 x 35 | 10 | 13.9 |
| Heat exchange building | 35 x 17 | 15 | 18.9 | |
| Post processed storage | 5 x 16.4 | 15 | 18.9 | |
| Electrical rooms | 15 x 7 | 10 | 13.9 | |
| Process building | 130 x 80 | 25 | 28.9 | |
| Admin building | 62 x 10 | 21 | 24.9 | |
| Hydrogen electrolyser (Work No. 7) | Northern Gas AGI | 60 x 60 | 5 | 9.6 |
| Northern hydrogen production and storage facility | 100 x 25 | 8 | 12.6 | |
Vehicle refuelling station (Work No. 8) | 95 x 80 | 12.5 | 15.5 | |
| Hydrogen refuelling station (Work No. 8) | Southern Gas AGI | 60 x 60 | 5 | 10.1 |
| Southern hydrogen production and storage facility | 100 x 25 | 8 | 11.6 | |
| Battery storage facility (Work No. 9) | 115 x 58 | 8.5 | 11.5 | |
Annotations
Commencement
- I1
Sch. 1 Pt. 2 in force at 4.4.2025, see art. 1