OpenLegislation

Paragraph 13 Covered heavy goods vehiclesI1

England and Wales

During the construction phase, operational phase and decommissioning phase the loads of all heavy goods vehicles carrying friable bulk materials or waste shall be covered on route to and from the Order limits unless the load is otherwise enclosed or an incoming load is being uncovered for the purposes of inspection.

Annotations

Commencement

I1

Sch. 9 para. 13 in force at 7.8.2015, see art. 1