Paragraph 13 Covered heavy goods vehiclesI1
England and Wales
During the construction phase, operational phase and decommissioning phase the loads of all heavy goods vehicles carrying friable bulk materials or waste shall be covered on route to and from the Order limits unless the load is otherwise enclosed or an incoming load is being uncovered for the purposes of inspection.
Annotations
Commencement
- I1
Sch. 9 para. 13 in force at 7.8.2015, see art. 1