The Strategic Planning Authorities (Spatial Development Strategy) Regulations 2026
S.I. 2026/1162 · Made 4 November 2026
TOWN AND COUNTRY PLANNING, ENGLAND
Made 4th November 2026
Laid before Parliament 5th November 2026
Coming into force 26th November 2026
The Secretary of State makes these Regulations in exercise of the powers conferred by sections 12D(8), 12E(3), 12F(1), (9) and (10), 12G(2)(d), 12H(2)(g) and (7), 12M(7), 12O(4), 12U and 122(3) of the Planning and Compulsory Purchase Act 2004f1.
Annotations to the whole text
Footnotes
- f1
-
2004 c. 5. Sections 12D, 12E, 12F, 12G, 12H, 12M, 12O and 12U were inserted by section 58 of the Planning and Infrastructure Act 2025 (c. 34). See section 122(1) of the Planning and Compulsory Purchase Act 2004 for the definition of “prescribed”.
Contents
- Part 1: INTRODUCTORY
- 1Citation, commencement, extent and application
- 2Interpretation
- 3Electronic communications
- Part 2: CONTENTS OF SPATIAL DEVELOPMENT STRATEGY
- 4Title of a spatial development strategy
- 5Key diagram
- Part 3: SPATIAL DEVELOPMENT STRATEGY TIMETABLE
- 6Content of a spatial development strategy timetable
- 7Submission of a draft spatial development strategy timetable to the Secretary of State
- 8Approval of a draft spatial development strategy timetable by the Secretary of State
- 9Publication of a spatial development strategy timetable
- 10Revision of a spatial development strategy timetable
- 11Submission of a revised spatial development strategy timetable to the Secretary of State
- 12Publication of a revised spatial development strategy timetable
- Part 4: PREPARATION OF SPATIAL DEVELOPMENT STRATEGY
- 13Commencement notice
- 14Additional matters to which regard is to be had
- 15Consultation
- 16Representations
- 17Submission to Secretary of State after consultation
- 18Publication of the examiner’s report
- Part 5: MONITORING AND REPORTING
- 19Request for further information
- 20Annual monitoring report
- Part 6: AVAILABILITY OF DOCUMENTS
- 21Manner of publication
- 22Duration of requirement to publish document
- 23Copies of documents
- Signature
- Explanatory note
1Citation, commencement, extent and application
These Regulations may be cited as the Strategic Planning Authorities (Spatial Development Strategy) Regulations 2026.
These Regulations come into force on 26th November 2026.
These Regulations extend to England and Wales and apply in relation to England only.
These Regulations apply in relation to the preparation and adoption of an alteration of a spatial development strategy as they apply in relation to the preparation and adoption of a spatial development strategy.
2Interpretation
In these Regulations,—
-
“the 2004 Act” means the Planning and Compulsory Purchase Act 2004;
-
“address” means—
- (a)
a number or address used for the purposes of sending or receiving documents or information by electronic means;
- (b)
a postal address;
- (a)
-
“electronic communication” has the meaning given in section 15(1) of the Electronic Communications Act 2000f1;
-
“electronic communications apparatus” has the same meaning as in paragraph 5(1) of the electronic communications code;
-
“electronic communications code” has the same meaning as in section 106(1) of the Communications Act 2003f2;
-
“examiner’s report” means the report made by the examiner under section 12I (6) of the 2004 Act;
-
“highways authority” has the meaning given in section 1 of the Highways Act 1980f3;
-
“integrated transport area” has the meaning given in section 77 (1) of the Local Transport Act 2008f4;
-
“Integrated Transport Authority” means—
- (a)
an authority which is known as an Integrated Transport Authority as a result of section 77 (2) of the Local Transport Act 2008f5, or
- (b)
- (a)
-
“lead local flood authority” has the meaning given in section 6 (7) of the Flood and Water Management Act 2010f6;
-
“neighbourhood forum” means an organisation or body designated as such under section 61F(3) of the Town and Country Planning Act 1990f7;
-
“relevant strategy preparation stage” means—
- (a)
the publication of a draft spatial development strategy timetable under section 12H (1) of the 2004 Act;
- (b)
the submission of a draft spatial development strategy to the Secretary of State under regulation 17;
- (c)
the submission of a draft spatial development strategy to the Secretary of State under section 12K (3) of the 2004 Act;
- (d)
the holding of a vote on a resolution to adopt the spatial development strategy under section 12L (3) of the 2004 Act;
- (a)
-
“working day” means any day other than a Saturday, a Sunday, Christmas Day, Good Friday or a day which is a bank holiday under the Banking and Financial Dealings Act 1971f8 in England.
In these Regulations, a reference to—
a strategic planning authority’s principal office includes a reference to the principal office of a constituent authority of a strategic planning board.
3Electronic communications
Where—
a document, copy, notice, notification or representations on any matter or document are sent or made by way of electronic communications, and
the electronic communication is received by the recipient after 5pm on a working day,
it is to be taken to have been received on the next working day after the day on which the electronic communication is received.
4Title of a spatial development strategy
A spatial development strategy must contain a title which includes the words “spatial development strategy”.
5Key diagram
A spatial development strategy must contain a map of the strategy areaf1, known as a “key diagram”.
A key diagram must—
include an explanation of any symbol or notation which it uses, and
visually illustrate—
the strategic planning authority’s policies, in relation to the development and use of land in the strategy area, which are of strategic importance to that area, and
the geographical application of those policies.
6Content of a spatial development strategy timetable
A spatial development strategy timetable must contain the following information from the date on which it is first published under section 12F(7) of the 2004 Act—
the date on which the strategic planning authority will publish its commencement notice under regulation 13,
the date on which the strategic planning authority will publish its draft spatial development strategy under section 12H(1) of the 2004 Act,
the date on which the strategic planning authority will submit its draft spatial development strategy to the Secretary of State under regulation 17,
the date on which the strategic planning authority will submit its draft spatial development strategy to the Secretary of State under section 12K(3) of the 2004 Act, and
the date on which the strategic planning authority will hold a vote on a resolution to adopt its spatial development strategy under section 12L(3) of the 2004 Act.
7Submission of a draft spatial development strategy timetable to the Secretary of State
A strategic planning authority must submit its first draft spatial development strategy timetable to the Secretary of State under section 12F(1) of the 2004 Act—
where the strategic planning authority is a strategic planning board, within the period of 90 days beginning with the day on which the regulations establishing the strategic planning board come into force;
where the strategic planning authority was given a direction under section 12B(5) of the 2004 Act which was later revoked, within the period of 90 days beginning with the day on which the notice revoking the direction is sent to the strategic planning authority;
in any other case, within the period of 90 days beginning with the day on which these Regulations come into force.
A strategic planning authority must thereafter submit its draft spatial development strategy timetable to the Secretary of State under section 12F(1) of the 2004 Act no earlier than the day on which the authority publishes its commencement notice under regulation 13.
8Approval of a draft spatial development strategy timetable by the Secretary of State
This regulation applies where the Secretary of State approves a revised draft spatial development strategy timetable under section 12F(4)(b) of the 2004 Act.
The Secretary of State must notify the strategic planning authority in writing, as soon as reasonably practicable, that the revised draft spatial development strategy timetable has been approved.
9Publication of a spatial development strategy timetable
A strategic planning authority must publish its spatial development strategy timetable under section 12F(7) of the 2004 Act—
where the Secretary of State approves a revised draft spatial development strategy timetable under section 12F(4)(b) of the 2004 Act, within the period of 7 days beginning with the day after the day on which the Secretary of State complies with regulation 8(2);
where the Secretary of State gives a direction under section 12F(5) of the 2004 Act, within the period of 7 days beginning with the day after the day on which the direction is given;
in any other case, within the period of 7 days beginning with the day after the day on which the period referred to in section 12F(3) of the 2004 Act elapses.
10Revision of a spatial development strategy timetable
A strategic planning authority must—
keep its spatial development strategy timetable under review, and
make any revisions to the timetable that are necessary to ensure that it is kept up to date.
Paragraph (3) applies where a relevant strategy preparation stage occurs.
By the end of the same day that a relevant strategy preparation stage occurs, the strategic planning authority must revise its spatial development strategy timetable to set out the date on which that stage occurred.
The Secretary of State may direct a strategic planning authority to revise its spatial development strategy timetable.
A strategic planning authority to which a direction is given under paragraph (4) must revise its spatial development strategy timetable within the period specified in the direction.
11Submission of a revised spatial development strategy timetable to the Secretary of State
This regulation applies where a strategic planning authority revises its spatial development strategy timetable in accordance with regulation 10(1)(b).
As soon as reasonably practicable after making the revision, the strategic planning authority must submit to the Secretary of State—
its revised timetable, and
a statement giving the strategic planning authority’s reason for the revision.
The Secretary of State may give a direction to the strategic planning authority that its revised spatial development strategy timetable requires the approval of the Secretary of State.
If the Secretary of State has not given such a direction to the strategic planning authority within the period of 4 weeks beginning with the date on which the revised timetable was sent to the Secretary of State, the strategic planning authority may bring the revised timetable into effect.
A strategic planning authority to which a direction under paragraph (3) is given may bring the revised timetable into effect only when the Secretary of State approves the revised timetable.
Where the Secretary of State approves a revised timetable, the Secretary of State must notify the strategic planning authority in writing, as soon as reasonably practicable, that the revised timetable has been approved.
12Publication of a revised spatial development strategy timetable
To bring a revised strategy timetable into effect, a strategic planning authority must publish it, together with a statement that the revised timetable is to have effect.
A strategic planning authority must comply with paragraph (1)—
where regulation 11(4) applies, within the period of 7 days beginning with the day after the day on which the period referred to in that regulation elapses;
where the Secretary of State approves the revised timetable under regulation 11(5), within the period of 7 days beginning with the day after the day on which the Secretary of State complies with regulation 11(6);
in any other case, within the period of 7 days beginning with the day after the day on which the authority makes the revision.
13Commencement notice
Before preparing a draft spatial development strategy under section 12G(1) of the 2004 Act, a strategic planning authority must publish a notice, known as a “commencement notice”.
A commencement notice must specify—
the name of the strategic planning authority which has prepared the notice,
the strategy area to which the authority’s spatial development strategy is to relate,
that the authority will commence preparing its draft spatial development strategy, and
the date on which the notice is published under paragraph (1).
This regulation does not apply in relation to the preparation of an alteration to the spatial development strategy which does not materially affect the policies in the strategy.
14Additional matters to which regard is to be had
The following matters are prescribed for the purposes of section 12G(2)(d) of the 2004 Act—
the objectives of preventing major accidents and limiting the consequences of such accidents for human health and the environment,
the need, in the long term—
to maintain appropriate safety distances between establishments and residential areas, buildings and areas of public use, recreational areas, and, as far as possible, major transport routes,
to protect areas of particular natural sensitivity or interest in the vicinity of establishments, where appropriate through appropriate safety distances or other relevant measures, and
in the case of existing establishments, to take additional technical measures in accordance with regulation 5 of the Control of Major Accident Hazards Regulations 2015f1 so as not to increase the risks to human health or the environment, and
the desirability of prioritising development on land that has been previously developed.
15Consultation
A strategic planning authority must notify the persons specified in paragraph (2) that its draft spatial development strategy has been published on its website.
The persons referred to in paragraph (1) are—
Active Travel Englandf1;
any person—
to whom the electronic communications code applies as a result of a direction given under section 106(3)(a) of the Communications Act 2003f2, and
who owns or controls electronic communications apparatus situated in any part of the strategy area;
the Canal & River Trustf3;
the Civil Aviation Authorityf4;
the English Sports Councilf5;
the Environment Agencyf6;
the Forestry Commissionf7;
any highways authority for an area that is wholly or partly within the strategy area;
the Historic Buildings and Monuments Commission for Englandf8;
the Homes and Communities Agencyf9;
if it exercises functions in any part of the strategy area—
an integrated care board established under Chapter A3 of Part 2 of the National Health Service Act 2006f10;
a person to whom a licence has been granted under section 7(2) of the Gas Act 1986f12;
a sewerage undertaker appointed under section 6(1) of the Water Industry Act 1991f13;
a water undertaker appointed under section 6(1) of the Water Industry Act 1991;
any Integrated Transport Authority for an integrated transport area that is wholly or partly within the strategy area;
any lead local flood authority for an area that is wholly or partly within the strategy area;
National Highways Limitedf16;
Natural Englandf17;
a neighbourhood forum for an area that is wholly or partly within the strategy area;
Network Rail Infrastructure Limitedf18;
NHS Englandf19;
the Office for Nuclear Regulationf20;
the Office of Rail and Roadf21;
a parish council for an area that is wholly or partly within the strategy area.
This regulation does not apply in relation to the preparation of an alteration to the spatial development strategy which does not materially affect the policies in the strategy.
16Representations
An invitation to make representations under section 12H(4) or (5) of the 2004 Act must specify—
the period within which representations may be made to the strategic planning authority (the “representation period”), and
the address to which representations must be sent.
The representation period must be—
where the strategic planning authority has prepared a draft alteration to the spatial development strategy which does not materially affect the policies in the strategy, a period of not less than 2 weeks from the date on which the invitation to make representations is made;
where the strategic planning authority has prepared a draft alteration to the spatial development strategy which constitutes a minor alteration, a period of not less than 6 weeks from the date on which the invitation to make representations is made;
in any other case, a period of not less than 12 weeks from the date on which the invitation to make representations is made.
Representations must be made—
in writing, and
within the representation period.
17Submission to Secretary of State after consultation
After the representation period has elapsed, a strategic planning authority must submit to the Secretary of State—
its draft spatial development strategy,
a copy of any representations received in accordance with regulation 16(3),
a summary of the main issues raised in any representations in accordance with regulation 16(3),
such supporting documents as the authority considers relevant, and
a copy of the authority’s spatial development strategy timetable.
Within the period of 4 weeks beginning with the day on which the Secretary of State receives the documents referred to in paragraph (1), the Secretary of State must—
appoint an examiner, or
direct that no examination is required.
18Publication of the examiner’s report
A strategic planning authority must, within the period of 2 weeks beginning with the day on which it receives the examiner’s report,—
comply with section 12I(9) of the 2004 Act, and
notify the persons specified in paragraph (2) that the examiner’s report has been published on the authority’s website.
The persons referred to in paragraph (1)(b) are—
where the strategic planning authority is a strategic planning board, the constituent authorities of the board;
any county council for an area that is within, or any part of which is within, the strategy area;
any district council for an area that is within, or any part of which is within, the strategy area.
19Request for further information
The Secretary of State may at any time issue a request to a strategic planning authority for information, documents and evidence relating to the preparation, adoption, alteration, replacement or review of a spatial development strategy.
A request under paragraph (1) must specify—
the information, documents or evidence requested,
the date by which the information, documents or evidence requested must be sent to the Secretary of State, and
the manner in which the information, documents or evidence requested must be sent to the Secretary of State.
20Annual monitoring report
A strategic planning authority must prepare a report in relation to its operative spatial development strategy, known as an “annual monitoring report”.
An annual monitoring report must include—
a statement which provides information on delivery against the objectives, outcomes and policies set out in the operative spatial development strategy,
where relevant, justification for why the spatial development strategy needs to be altered or replaced, and
where relevant, a summary of any engagement between the authority and—
such other persons specified in regulation 15 as the authority considers appropriate.
A strategic planning authority must publish its annual monitoring report annually on the anniversary of the date on which its spatial development strategy was adopted under section 12L of the 2004 Act or approved by the Secretary of State under section 12P(9)(a) or (b) or 12Q(2)(a) or (b) of the 2004 Act.
If the anniversary referred to in paragraph (3) does not fall on a working day, the strategic planning authority must publish its annual monitoring report on the next working day after that anniversary.
21Manner of publication
The strategic planning authority must publish the documents specified in paragraph (2) by—
publishing the document on its website, and
making copies of the document available for inspection at the authority’s principal office and at any other place that the authority considers appropriate.
The documents referred to in paragraph (1) are—
a spatial development strategy timetable, together with a statement that the timetable has effect, published under section 12F(7) of the 2004 Act,
a revised spatial development strategy timetable, together with a statement that the timetable has effect, published under regulation 12,
a commencement notice published under regulation 13,
a report by an examiner published under section 12I(9) of the 2004 Act,
a spatial development strategy, together with a statement that it has been adopted, published under section 12L(6) of the 2004 Act, and
a spatial development strategy approved by the Secretary of State under section 12P(9)(a) or (b) or 12Q(2)(a) or (b) of the 2004 Act.
22Duration of requirement to publish document
Once the period specified in paragraph (2) has expired, a strategic planning authority may cease to publish a document published as required by or under Part 1A of the 2004 Act.
The period referred to in paragraph (1) is the period of 3 months beginning with the day after the day on which the authority’s spatial development strategy is—
adopted under section 12L of the 2004 Act, or
approved by the Secretary of State under section 12P(9)(a) or (b) or 12Q(2)(a) or (b) of the 2004 Act.
Paragraph (1) does not apply to—
a spatial development strategy, together with a statement that it has been adopted, published under section 12L(6) of the 2004 Act;
a spatial development strategy approved by the Secretary of State under section 12P(9)(a) or (b) or 12Q(2)(a) or (b) of the 2004 Act.
23Copies of documents
Paragraph (2) applies where a person requests from a strategic planning authority a copy of any document published by the authority as required by or under Part 1A of the 2004 Act.
The strategic planning authority must provide a copy of the document to that person as soon as reasonably practicable after receipt of that person’s request.
The strategic planning authority may make a reasonable charge for a copy of a document published as required by or under Part 1A of the 2004 Act.
Signature
Signed by authority of the Secretary of State for Housing, Communities and Local Government
Matthew Pennycook
Minister of State
Ministry of Housing, Communities and Local Government
4th November 2026
Explanatory note
(This note is not part of the Regulations)
Part 1A of the Planning and Compulsory Purchase Act 2004 (c. 5) (inserted by section 58 of the Planning and Infrastructure Act 2025 (c. 34)) requires strategic planning authorities to prepare a spatial development strategy (“SDS”) for their area. These Regulations make provision as to the procedure to be followed in connection with the preparation of a SDS.
Part 1 of these Regulations contains introductory matters (regulation 1), key definitions (regulation 2) and provision regarding electronic communications (regulation 3).
Part 3 of these Regulations prescribes the content of a SDS timetable (regulation 6) and sets out when this timetable must be submitted to the Secretary of State (regulation 7), published (regulation 9) and revised (regulation 10). Part 3 also sets out a requirement for the Secretary of State to notify the strategic planning authority that the timetable has been approved (regulation 8).
Part 4 of these Regulations deals with the preparation of a SDS and makes provision in respect of matters including—
- (a)
publication of a commencement notice (regulation 13);
- (b)
additional matters to which a strategic planning authority must have regard when preparing a draft SDS (regulation 14);
- (c)
consultation and representations (regulations 15 and 16);
- (d)
submission of documents to the Secretary of State (regulation 17);
- (e)
publication of the examiner’s report (regulation 18).
Part 5 of these Regulations makes provision as to requests for further information (regulation 19) and publication of an annual monitoring report (regulation 20).
Part 6 of these Regulations provides for requirements as to the availability of documents.
A full impact assessment has not been produced for this instrument as no, or no significant, impact on the private, voluntary or public sector is foreseen. An impact assessment was prepared for the Planning and Infrastructure Act 2025 and can be found at: https://www.gov.uk/government/publications/planning-and-infrastructure-bill-impact-assessment and can be inspected at the Ministry of Housing, Communities and Local Government, 2 Marsham Street, London, SW1P 4DF.