The Building (Procedure) (Scotland) Amendment Regulations 1995
S.I. 1995/1572 · Made 19 June 1995
BUILDING AND BUILDINGS
Made 19th June 1995
Laid before Parliament 30th June 1995
Coming into force 24th July 1995
The Secretary of State, in exercise of the powers conferred on him by sections 2(4), 4(8), 4A, 6(2) and (3A), 6A(7), 6B(3), 20, 24(1)(b) and 29(1) of, and Schedule 3 to, the Building (Scotland) Act 1959f1 and of all other powers enabling him in that behalf, hereby makes the following Regulations:
Annotations to the whole text
Footnotes
- f1
-
1959 c. 24; section 2(4) was substituted by Local Government (Scotland) Act 1973 (c. 65), Schedule 15, paragraph 3; section 4 was substituted and section 4A was added by the Building (Scotland) Act 1970 (c. 38), section 2; section 6(2) was amended by the Building (Scotland) Act 1970, Schedule 1, Part I, paragraph 1(a); section 6(3A) was added by the Health and Safety at Work etc. Act 1974 (c. 37), Schedule 7, paragraph 4(a); sections 6A and 6B were added by the Building (Scotland) Act 1970, section 4; section 20 was substituted by the Housing (Scotland) Act 1986 (c. 65), section 19(6); section 29(1) contains a definition of “prescribed” relevant to the exercise of the statutory powers under which these Regulations are made.
Contents
- 1Citation, commencement and interpretation
- 2Amendment of principal Regulations
- 3Increase in local authority fees
- 4Revocation and transitional provision
- Signature
- Schedule 1SCHEDULE SUBSTITUTED FOR SCHEDULE 2 WITH EFFECT FROM 24TH JULY 1995
- Schedule 2SCHEDULE SUBSTITUTED FOR SCHEDULE 2 WITH EFFECT FROM 24TH JULY 1995
- Explanatory note
1Citation, commencement and interpretation
These Regulations may be cited as the Building (Procedure) (Scotland) Amendment Regulations 1995 and shall come into force on 24th July 1995.
In these Regulations “the principal Regulations” means the Building (Procedure) (Scotland) Regulations 1981f1.
2Amendment of principal Regulations
The principal Regulations shall be amended as follows:—
in paragraph 1 of regulation 3 (Interpretation) for the definition of “Technical Standards” there shall be substituted—
at the end of regulation 7 (Fees) there shall be added—
“(2A)The estimated cost referred to in Schedule 2 shall not include any amount in respect of value added tax in relation to the carrying out of work to which the estimate relates.”; and
for paragraph (b) of regulation 51 (Notices regarding operations) there shall be substituted—
“in the case of a drain which is ready to be tested for the purposes of the deemed to satisfy provisions in the Technical Standards applicable to paragraphs M2.1 and M2.2 of those Standards, that the drain had been laid and is ready for test, and”.
3Increase in local authority fees
With effect from 24th July 1995, for Schedule 2 to the principal Regulations there shall be substituted the Schedule set out in Schedule 1 to these Regulations.
With effect from 24th July 1996, for Schedule 2 to the principal Regulations as substituted in accordance with paragraph (1) above, there shall be substituted the Schedule set out in Schedule 2 to these Regulations.
4Revocation and transitional provision
The Building (Procedure) (Scotland) Amendment (No.2) Regulations 1991f1 are hereby revoked.
Regulation 2(c) above shall not apply in relation to operations in pursuance of a warrant granted before 24th July 1995, including a warrant granted before that date and subsequently extended or amended.
Signature
James Douglas-Hamilton
Parliamentary Under Secretary of State, Scottish Office
St Andrew’s House,
Edinburgh
19th June 1995
Schedule 1SCHEDULE SUBSTITUTED FOR SCHEDULE 2 WITH EFFECT FROM 24TH JULY 1995
“SCHEDULE 2
TABLE OF FEES
Regulation 7
£ 1Application for warrant (including issue of warrant) for erection, alteration, extension or demolition of a building (whether or not combined with application for warrant for change of use)—
(i)where the estimated cost of the operations does not exceed £2,000
40 (ii)where the estimated cost of the operations exceeds £2,000 but does not exceed £10,000—
(a)the sum of
40
plus
(b)for every £500 or part thereof exceeding £2,000
10 (iii)where the estimated cost of the operations exceeds £10,000 but does not exceed £20,000—
(a)the sum of
200
plus
(b)for every £1,000 or part thereof exceeding £10,000
12 (iv)where the estimated cost of the operations exceeds £20,000 but does not exceed £100,000—
(a)the sum of
320
plus
(b)for every £5,000 or part thereof exceeding £20,000
24 (v)where the estimated cost of the operations exceeds £100,000 but does not exceed £500,000—
(a)the sum of
704
plus
(b)for every £50,000 or part thereof exceeding £100,000
180 (vi)where the estimated cost of the operations exceeds £500,000 but does not exceed £1,000,000—
(a)the sum of
2,144
plus
(b)for every £100,000 or part thereof exceeding £500,000
240 (vii)where the estimated cost of the operations exceeds £1,000,000—
(a)the sum of
3,344 (b)for every £200,000 or part thereof exceeding £1,000,000
360 2Application for warrant (including issue of warrant) for change of use only
25 3Application for amendment of warrant—
(a)for additional operations where the estimated cost of these falls within any of the sub-paragraphs detailed in paragraph 1 of this Schedule—
fee in accordance with appropriate sub-paragraph of paragraph 1 hereof
(b)where no additional operations are involved
25 4Application for extension of a period of a warrant.
25 ”.
Schedule 2SCHEDULE SUBSTITUTED FOR SCHEDULE 2 WITH EFFECT FROM 24TH JULY 1995
“SCHEDULE 2
TABLE OF FEES
Regulation 7
£ 1Application for warrant (including issue of warrant) for erection, alteration, extension or demolition of a building (whether or not combined with application for warrant for change of use)—
(i)where the estimated cost of the operations does not exceed £3,000
70 (ii)where the estimated cost of the operations exceeds £3,000 but does not exceed £10,000—
(a)the sum of
70
plus
(b)for every £500 or part thereof exceeding £3,000
12 (iii)where the estimated cost of the operations exceeds £10,000 but does not exceed £20,000—
(a)the sum of
238
plus
(b)for every £1,000 or part thereof exceeding £10,000
14 (iv)where the estimated cost of the operations exceeds £20,000 but does not exceed £100,000—
(a)the sum of
378
plus
(b)for every £5,000 or part thereof exceeding £20,000
28 (v)where the estimated cost of the operations exceeds £100,000 but does not exceed £500,000—
(a)the sum of
826
plus
(b)for every £50,000 or part thereof exceeding £100,000
205 (vi)where the estimated cost of the operations exceeds £500,000 but does not exceed £1,000,000—
(a)the sum of
2,466
plus
(b)for every £100,000 or part thereof exceeding £500,000
275 (vii)where the estimated cost of the operations exceeds £1,000,000—
(a)the sum of
3,841 (b)for every £200,000 or part thereof exceeding £1,000,000
410 2Application for warrant (including issue of warrant) for change of use only
30 3Application for amendment of warrant—
(a)for additional operations where the estimated cost of these falls within any of the sub-paragraphs detailed in paragraph 1 of this Schedule—
fee in accordance with appropriate sub-paragraph of paragraph 1 hereof
(b)where no additional operations are involved
30 4Application for extension of a period of a warrant.
30 ”
Explanatory note
(This note is not part of the Regulations)
These Regulations further amend the Building (Procedure) (Scotland) Regulations 1981 to:
increase building control fees. This is done in 2 stages with effect from 24th July 1995 and 24th July 1996, by an average of 20% and 15% respectively. The lowest operations cost threshold has been increased to £2,000 from 24th July 1995 and to £3,000 from 24th July 1996. The regulations also make it clear that the estimated cost on which fees are calculated should not include an element for the VAT which may be payable when the works are carried out; and
make other minor amendments to reflect recent changes in the building standards regulations.