The London Luton Airport Expansion Development Consent Order 2025
S.I. 2025/463 · Made 3 April 2025 · Extends to England and Wales
Infrastructure Planning
Made 3rd April 2025
Coming into force 24th April 2025
The application was examined by a Panel of five members (“the Panel”) (appointed by the Secretary of State) in accordance with Chapter 4 of Part 6 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 2010f3.
The Panel, having examined the application with the documents that accompanied the application, and the representations made and not withdrawn, has submitted, in accordance with section 74(2) of the 2008 Act, submitted a report and recommendation to the Secretary of State.
The Secretary of State, having considered the representations made and not withdrawn, and the report of the Panel, has decided to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial changes to the proposals comprised in the application.
The Secretary of State is satisfied that replacement land (as that term is defined in section 131(12) of the 2008 Act) has been or will be given in exchange for the special category land, and that the replacement land has been or will be vested in the person or persons in whom the special category land is vested and subject to the same rights, trusts and incidents as attach to the special category land, and that, accordingly, section 131(4) of the 2008 Act applies.
The Secretary of State, in exercise of the powers conferred by sections 114f4, 115f5, 117f6, 120f7, 122f8, 123f9, 127f10 131f11, 135, 138f12, 147f13, 154 and 229 of, and paragraphs 1 to 4, 10 to 14 17, 22, 26, 33, 36 and 37 of Part 1 of Schedule 5 to, the 2008 Act, makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).
- f2
-
S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/755, S.I. 2014/469, S.I. 2014/2381, S.I. 2015/377, S.I.2015/1682, S.I. 2017/524, S.I. 2017/572, S.I. 2019/734, S.I. 2020/764, S.I. 2020/1534, S.I. 2021/978, S.I. 2022/634, S.I. 2023/1071 and S.I. 2024/332.
- f3
-
S.I. 2010/103, amended by S.I. 2012/635.
- f4
-
Section 114 was amended by paragraph 55 of Part 1 of Schedule 13 to the Localism Act 2011 (c. 20).
- f5
-
Section 115 was amended by paragraph 56 of Part 1 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011, section 160 of the Housing and Planning Act 2016 (c. 22). There are other amendments to this section which are not relevant to this Order
- f6
-
Section 117 was amended by paragraph 58 of Part 1 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011.
- f7
-
Section 120 was amended by section 140 of, and paragraph 60 of Part 1 of Schedule 13, to the Localism Act 2011.
- f8
-
Section 122 was amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
- f9
-
Section 123 was amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011.
- f10
-
Section 127 was amended by paragraph 64(2) of Schedule 13 to the Localism Act 2011 and section 23(2) of the Growth and Infrastructure Act 2013 (c. 27).
- f11
-
Section 131 was amended by section 24(2) of the Growth and Infrastructure Act 2013.
- f12
-
Section 138 was amended by section 23(4) of the Growth and Infrastructure Act 2013.
- f13
-
Section 147 was amended by paragraph 68 of Schedule 13 and Part 20 of Schedule 25 to the Localism Act 2011.
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- Part 2: PRINCIPAL POWERS
- 3Development consent etc. granted by the Order
- 4Maintenance of authorised development
- 5Maintenance of drainage works
- 6Limits of works
- 7Benefit of Order
- 8Consent to transfer benefit of Order
- Part 3: STREETS
- 9Application of the 1991 Act
- 10Street works
- 11Power to alter layout, etc., of streets
- 12Construction and maintenance of new, altered or diverted streets
- 13Temporary stopping up and restriction of use of streets
- 14Permanent stopping up of public rights of way
- 15Access to works
- 16Traffic regulation
- 17Agreements with street authorities
- 18Designation of highways
- Part 4: SUPPLEMENTAL POWERS
- 19Discharge of water
- 20Protective work to buildings
- 21Authority to survey and investigate the land
- 22Felling, lopping and removal of trees, shrubs and hedgerows
- 23Removal of human remains
- Part 5: POWERS OF ACQUISITION AND POSSESSION
- 24Compulsory acquisition of land
- 25Compulsory acquisition of land – incorporation of the mineral code
- 26Time limit for exercise of authority to acquire land compulsorily
- 27Compulsory acquisition of rights and imposition of restrictive covenants
- 28Private rights over land
- 29Modification of Part 1 of the 1965 Act
- 30Application of the 1981 Act
- 31Acquisition of subsoil or airspace only
- 32Rights under or over streets
- 33Temporary use of land for carrying out the authorised development
- 34Temporary use of land for maintaining the authorised development
- 35Special category land
- 36Statutory undertakers
- 37Apparatus and rights of statutory undertakers in stopped-up streets
- 38Recovery of costs of new connections
- 39Crown rights
- 40Disregard of certain improvements, etc.
- 41Set off for enhancement in value of retained land
- Part 6: OPERATIONS
- 42Power to operate the authorised development
- Part 7: MISCELLANEOUS AND GENERAL
- 43Disapplication of legislative provisions
- 44Interaction with LLAOL planning permission
- 45Application of the 1990 Act
- 46Application of landlord and tenant law
- 47Defence to proceedings in respect of statutory nuisance
- 48No double recovery
- 49Protection of interests
- 50Certification of documents, etc.
- 51Service of notices
- 52Arbitration
- 53Guarantees in respect of payment of compensation
- 54Enhancement and conservation of the Chilterns National Landscape
- Signature
- Schedule 1AUTHORISED DEVELOPMENT
- Schedule 2: REQUIREMENTS
- Part 1: GENERAL
- 1Interpretation
- 2Amendments to approved details
- 3Anticipatory steps towards compliance with any requirement
- Part 2: REQUIREMENTS PERTAINING TO CONSTRUCTION
- 4Time limits
- 5Phasing of authorised development
- 6Detailed design
- 7Parameters of authorised development
- 8Code of Construction Practice
- 9Landscaping design
- 10Landscape and biodiversity management plan
- 11Protected species
- 12Previously unidentified land contamination and contaminated groundwater
- 13Surface and foul water drainage
- 14Water resources and flood risk assessment
- 15Construction traffic management
- 16Construction workers
- 17Archaeological remains
- 18Remediation of Former Eaton Green Landfill
- Part 3: REQUIREMENTS PERTAINING TO GREEN CONTROLLED GROWTH
- 19Interpretation
- 20Exceedance of air quality Level 2 Threshold or Limit
- 21Environmental Scrutiny Group
- 22Monitoring of permitted operations
- 23Exceedance of a Level 1 Threshold
- 24Exceedance of a Level 2 Threshold
- 25Exceedance of a Limit
- 26Review of implementation of this Part
- Part 4: REQUIREMENTS PERTAINING TO OTHER OPERATIONAL MATTERS
- 27Passenger cap for the authorised development
- 28Night quota period scheduled movements cap
- 29Annual air traffic movement cap for the authorised development
- 30Air noise management plan
- 31Fixed plant noise management plan
- 32Ground noise management plan
- 33Noise contour limits and quota count point limits
- 34Noise insulation plan and programme
- 35Offsite highways works
- 36Off-site highway works, Work Nos. 6e(d), (e), (f), (j) and (q)
- 37Travel plans
- 38Sustainable transport fund
- 39Operational air quality plan
- 40Greenhouse gas action plan
- 41Operational waste management plan
- 42Water consumption
- Part 5: PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- 43Interpretation
- 44Applications made under requirements
- 45Further information
- 46Register of requirements
- Schedule 3PERMANENT STOPPING UP OF PUBLIC RIGHTS OF WAY
- Schedule 4DESIGNATION OF HIGHWAYS
- Schedule 5LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
- Schedule 6: MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTS
- Compensation enactments
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- Application of Part 1 of the 1965 Act
- 4Paragraph 4
- 5Paragraph 5
- Schedule 7LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 8: PROTECTIVE PROVISIONS
- Part 1: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWAGE UNDERTAKERS
- 1Paragraph 1
- 2Paragraph 2
- On street apparatus
- 3Paragraph 3
- Apparatus in stopped up public rights of way
- 4Paragraph 4
- Protective works to buildings
- 5Paragraph 5
- Acquisition of land
- 6Paragraph 6
- Removal of apparatus
- 7Paragraph 7
- Facilities and rights for alternative apparatus
- 8Paragraph 8
- Retained apparatus
- 9Paragraph 9
- Expenses and costs
- 10Paragraph 10
- 11Paragraph 11
- Cooperation
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- Part 2: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- Part 3: FOR THE PROTECTION OF LONDON LUTON AIRPORT OPERATIONS LIMITED
- 19Paragraph 19
- Part 4: FOR THE PROTECTION OF CADENT GAS LIMITED
- Application
- 20Paragraph 20
- Interpretation
- 21Paragraph 21
- On street apparatus
- 22Paragraph 22
- Apparatus of Cadent in stopped up rights of way
- 23Paragraph 23
- Protective works to buildings
- 24Paragraph 24
- Acquisition of land
- 25Paragraph 25
- Removal of apparatus
- 26Paragraph 26
- Facilities and rights for alternative apparatus
- 27Paragraph 27
- Retained apparatus: protection of Cadent
- 28Paragraph 28
- Expenses
- 29Paragraph 29
- Indemnity
- 30Paragraph 30
- Enactments and agreements
- 31Paragraph 31
- Co-operation
- 32Paragraph 32
- Access
- 33Paragraph 33
- Arbitration
- 34Paragraph 34
- Notices
- 35Paragraph 35
- Part 5: FOR THE PROTECTION OF NATIONAL HIGHWAYS LIMITED
- Application, etc.
- 36Paragraph 36
- Interpretation
- 37Paragraph 37
- General
- 38Paragraph 38
- Prior approvals and security
- 39Paragraph 39
- Construction of the specified works
- 40Paragraph 40
- Payments
- 41Paragraph 41
- Provisional certificate
- 42Paragraph 42
- Opening
- 43Paragraph 43
- Final condition survey
- 44Paragraph 44
- Defects period
- 45Paragraph 45
- Final certificate
- 46Paragraph 46
- Security
- 47Paragraph 47
- Commuted sums
- 48Paragraph 48
- Insurance
- 49Paragraph 49
- Indemnity
- 50Paragraph 50
- Maintenance of the specified works
- 51Paragraph 51
- Expert determination
- 52Paragraph 52
- Part 6: FOR THE PROTECTION OF LOCAL HIGHWAY AUTHORITIES
- Application, etc.
- 53Paragraph 53
- 54Paragraph 54
- Detailed design information and commencement
- 55Paragraph 55
- Security
- 56Paragraph 56
- Road safety audits
- 57Paragraph 57
- Construction of the specified works
- 58Paragraph 58
- Inspections and testing of materials
- 59Paragraph 59
- Defects in local highways constructed by the undertaker
- 60Paragraph 60
- Payments
- 61Paragraph 61
- Provisional certificate
- 62Paragraph 62
- Maintenance
- 63Paragraph 63
- Final certificate
- 64Paragraph 64
- Emergency work
- 65Paragraph 65
- Land interests
- 66Paragraph 66
- Commuted sums
- 67Paragraph 67
- Insurance
- 68Paragraph 68
- Indemnity
- 69Paragraph 69
- Part 7: FOR THE PROTECTION OF RAILWAY INTERESTS
- Application
- 70Paragraph 70
- Interpretation
- 71Paragraph 71
- Approval of plans
- 72Paragraph 72
- 73Paragraph 73
- 74Paragraph 74
- 75Paragraph 75
- 76Paragraph 76
- 77Paragraph 77
- 78Paragraph 78
- 79Paragraph 79
- 80Paragraph 80
- 81Paragraph 81
- 82Paragraph 82
- 83Paragraph 83
- 84Paragraph 84
- 85Paragraph 85
- 86Paragraph 86
- 87Paragraph 87
- 88Paragraph 88
- 89Paragraph 89
- 90Paragraph 90
- Schedule 9DOCUMENTS TO BE CERTIFIED
- Explanatory note