Schedule 13 DOCUMENTS AND PLANS TO BE CERTIFIEDI1
England, Wales and Scotland
Table 10
(1) Document name | (2) Document reference | (3) Revision number | (4) Date |
|---|---|---|---|
| access and public rights of way plans | 2.4 | 7 | August 2023 |
| book of reference | 4.1 | 6 | August 2023 |
| carbon capture and export embedded design measures | 14.7 (Appendix B) | 1 | June 2023 |
| carbon capture and export readiness reserve space plan | 10.7 | 1 | March 2023 |
| combined heat and power embedded design measures | 14.7 (Appendix A) | 1 | June 2023 |
| combined heat and power assessment | 7.6 | 1 | June 2022 |
| design and access statement | 7.5 | 1 | June 2022 |
| environmental statement | 6.1, 6.2 | F12 | June 2023 |
| environmental statement figures | 6.3 | 2 | F2May 2023 |
| environmental statement appendices | 6.4 | 2 | March 2023 |
| flood risk assessment | 6.4 (ES Appendix 12A) | 1 | June 2022 |
| land plans | 2.2 | 5 | August 2023 |
| outline biodiversity net gain strategy | 6.4 (ES Appendix 11M) | 5 | July 2023 |
| outline construction environmental management plan | 7.12 | 6 | July 2023 |
| outline construction traffic management plan | 6.4 (ES Appendix 6A) | 7 | August 2023 |
| outline decommissioning plan | 12.4 | 1 | May 2023 |
| outline drainage strategy | 6.4 (ES Appendix 12F) | 4 | August 2023 |
| outline employment and skills strategy | 7.8 | 1 | June 2022 |
| outline fire prevention plan | 7.10 | 3 | August 2023 |
| outline flood emergency management plan | 7.9 | 2 | March 2023 |
| outline landscape and ecology strategy | 6.3 (ES Figure 3.14) | 2 | March 2023 |
| outline landscape and ecology management plan | 7.7 | 2 | April 2023 |
| outline lighting strategy | 6.4 (ES Appendix 3B) | 3 | June 2023 |
| outline local air quality monitoring strategy | 9.21 | 3 | May 2023 |
| outline odour management plan | 7.11 | 3 | August 2023 |
| outline operational noise management plan | 6.4 (ES Appendix 7D) | 4 | June 2023 |
| outline operational traffic management plan | 7.15 | 4 | July 2023 |
| outline operational travel plan | 6.4 (ES Appendix 6C) | 1 | June 2022 |
| waste area plan | 15.9 | 1 | July 2023 |
| works plans | 2.3 | 4 | August 2023 |
Annotations
Textual amendments
- F1
Words in Sch. 13 Table 10 substituted (8.11.2024) by The Medworth Energy from Waste Combined Heat and Power Facility (Correction) Order 2024 (S.I. 2024/1136), art. 1(2), Sch. 1
- F2
Word in Sch. 13 Table 10 substituted (8.11.2024) by The Medworth Energy from Waste Combined Heat and Power Facility (Correction) Order 2024 (S.I. 2024/1136), art. 1(2), Sch. 1
Commencement
- I1
Sch. 13 in force at 13.3.2024, see art. 1