The Hinkley Point Harbour Empowerment Order 2012
S.I. 2012/1914 · Made 19 July 2012 · Extends to England, Wales and Scotland
Harbours, Docks, Piers And Ferries
Made 19th July 2012
Laid before Parliament 24th July 2012
Coming into force 16th August 2012
In accordance with section 16(1) of the Harbours Act 1964f1, NNB Generation Company Limited (“the Company”) has made a written application to the Marine Management Organisation for the making by the Marine Management Organisation of this harbour empowerment order.
The Marine Management Organisation, being satisfied as mentioned in section 16(5), makes the following Order in exercise of the powers conferred by section 16(1) and (6).
Annotations to the whole text
Footnotes
- f1
-
1964 c.40; section 16 was amended by S.I. 1970/1681, the Transport Act 1981 (c.56), Schedule 6, paragraphs 3, 4(1) and 14 and Schedule 12, the Criminal Justice Act 1982 (c.48), sections 37 and 46, the Transport and Works Act 1992 (c.42), Schedule 3, paragraph 2, S.I. 2006/1177, regulation 2 and the Schedule, Part I, the Planning Act 2008 (c.29), Schedule 2, paragraph 10 and the Marine and Coastal Access Act 2009, Schedule 21, paragraph 2. Section 54 (orders and regulations) was amended by the Transport Act 1981 (c.56), sections 18 and 40 and Schedules 6 and 12 (Part II) and by the Marine and Coastal Access Act 2009 (c.23), Schedule 21, paragraph 3(2).
- f2
- f3
-
Section 42A was inserted, in relation to England and Wales, by the Marine and Coastal Access Act 2009 (c.23), Schedule 21, paragraph 3(1).
- f4
-
For the definition of “the Minister” (mentioned in section 16) see section 57(1).
- f5
-
The Marine Management Organisation was established by the Marine and Coastal Access Act 2009 (c.23), section 1.
Contents
- Part 1: PRELIMINARY
- 1Citation, commencement and duration
- 2Interpretation
- 3Incorporation of the Harbours, Docks and Piers Clauses Act 1847
- Part 2: WORKS PROVISIONS
- 4Power to construct works
- 5Power to deviate
- 6Further powers as to works and extinguishment of rights
- 7Subsidiary works
- 8Power to dredge
- 9Obstruction of work
- 10Survey of tidal works
- 11Provision against danger to navigation
- 12Abatement of works abandoned or decayed
- 13Lights on tidal works during construction
- 14Permanent lights on tidal works
- 15Period for completion of works and termination of works powers
- 16Operational land for purposes of the Town and Country Planning Act 1990
- 17Application and termination of permitted development rights
- 18Planning and works conditions
- 19Stopping up etc. of footpaths and substitution of new public rights of way
- 20Permanent stopping up of footpath and extinguishment of rights
- Part 3: HARBOUR REGULATION
- 21Harbour limits
- 22Byelaws
- 23Confirmation of byelaws
- 24General directions to vessels
- 25Publication of general directions
- 26Special directions to vessels
- 27Master’s responsibility to be unaffected
- 28Failure to comply with directions
- 29Enforcement of special directions
- 30Charges
- Part 4: MISCELLANEOUS AND GENERAL
- 31Power to lease etc.
- 32Restriction on use of the works
- 33Defence of due diligence
- 34Saving for Trinity House
- 35Saving for other consents etc.
- 36Disapplication of regulation 75 of the Conservation of Habitats and Species Regulations 2017
- 37Crown rights
- 38For the protection of the Environment Agency
- 39Closure of the jetty and reinstatement
- 40Saving for termination of this Order
- Signature
- Schedule 1: PLANNING AND WORKS CONDITIONS
- Part 1: Interpretation, Operation and Application of Conditions
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- Part 2: Construction, Maintenance and Use Conditions
- 1Geology and land contamination: spoil mound remediation
- 2Working hours
- 3Delivery hours
- 4On-site vehicular movements and maintenance - permitted hours
- 5Landscape and visual: external storage of contractors’ materials
- 6Landscape and visual and air quality: no burning of materials
- 7Noise and vibration: no amplified sound
- 8Directional foghorn
- 9Noise and vibration: noise level
- 10Use noise limit
- 11Noise and vibration: control of noise during construction, maintenance and use
- 12Infill material
- 13Landscape and visual: lighting
- 14Construction programme for silos and sand shed
- 15Alignment of the silos
- 16Height and details of the sand shed and silos
- 17Height of subsidiary works
- 18Storage of oils, fuels, concrete and chemicals
- 19Restriction of aggregate washing
- 20Ecological mitigation and monitoring plan
- 21Habitat management plan
- 22Ecological method statement
- 23Ecology: tree and hedgerow protection
- 24Historic environment: recording of important hedgerows
- 25Historic environment: monitoring of palaeontological remains
- 26Historic: scheduled monument management plan
- 27Drainage: surface water and foul drainage works
- 28Drainage: oil interceptor
- 29Air quality
- 30Residential amenity: information dissemination and complaints handling
- 31Drainage: water & sediment management plan
- 32Engineering details of foreshore access road
- 33Access to foreshore
- 34Flooding: foreshore access
- 35Geology & contaminated land: radiological monitoring
- 36Geology & land: previous contamination unidentified
- 37Groundwater: monitoring
- 38Construction method statement
- 39Construction and environmental management plan
- 40Vegetation clearance
- 41Materials management plan
- 42Site waste management plan
- 43Soil management plan
- 44Limit of closure of coast footpath
- 45Traffic obligations
- 46Bund planting
- 47Maintenance of planting
- Part 3: Reinstatement Conditions
- 48Coastal hydrology: cliff management plan
- 49Noise and vibration: control of noise during reinstatement
- 50Working hours during reinstatement
- 51On-site vehicular movements and maintenance - permitted hours during reinstatement
- 52Noise and vibration during reinstatement: no amplified sound
- Schedule 2STOPPING UP OF FOOTPATHS AND NEW PUBLIC RIGHTS OF WAY TO BE SUBSTITUTED
- Schedule 3FOOTPATHS MAPS
- Explanatory note