The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022
S.I. 2022/1396 · Made 7 December 2022 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 7th December 2022
Coming into force 29th December 2022
The application has been examined by the Examining Authority appointed by the Secretary of State pursuant to Chapter 3 of Part 6 of the 2008 Act. The examination was carried out in accordance with Chapter 4 of Part 6 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 2010f3. The Examining Authority has submitted a report and recommendation to the Secretary of State under section 83 of the 2008 Act.
The Secretary of State has considered the report and recommendations of the Examining Authority, has considered the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f4 and has had regard to the documents and matters referred to in section 104(2)f5 of the 2008 Act.
The Secretary of State, having decided the application, has determined to make an order giving effect to the proposals comprised in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.
Accordingly, the Secretary of State, in exercise of the powers conferred by sections 114, 115, 120 and 149A of the 2008 Act, makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20). Part 7 was amended by S.I. 2017/16.
- f2
-
S.I. 2009/2264, as amended by S.I. 2012/635 and S.I. 2013/522. There are other amendments to the Regulations which are not relevant to this Order.
- f3
-
S.I. 2010/103 amended by S.I. 2012/635.
- f4
-
S.I. 2017/572 amended by S.I. 2018/695, S.I. 2018/942.
- f5
-
Section 104 was amended by section 58(5) of the Marine and Coastal Access Act 2009 (c. 23) and by section 128(2) and Schedule 13, paragraphs 1 and 49(1) to (6) of the Localism Act 2011 (c. 20).
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- Part 2: PRINCIPAL POWERS
- 3Development consent etc. granted by the Order
- 4Maintenance of authorised development
- 5Operation of authorised development
- 6Benefit of the Order
- 7Consent to transfer benefit of the Order
- 8Application and modification of statutory provisions
- Part 3: STREETS
- 9Street works
- 10Power to alter layout, etc., of streets
- 11Construction and maintenance of new or altered means of access
- 12Access to works
- 13Agreements with street authorities
- Part 4: SUPPLEMENTAL POWERS
- 14Discharge of water
- 15Authority to survey and investigate the land
- 16Temporary interference with canal and public rights of navigation
- 17Use of private roads for construction
- Part 5: POWERS OF ACQUISITION
- 18Compulsory acquisition of land
- 19Statutory authority to override easements and other rights
- 20Time limit for exercise of authority to acquire land compulsorily
- 21Compulsory acquisition of rights etc.
- 22Private rights
- 23Application of the 1981 Act and Part 1 of the 1961 Act
- 24Acquisition of subsoil or airspace only
- 25Modification of Part 1 of the 1965 Act
- 26Rights under or over streets
- 27Temporary use of land for carrying out the authorised development
- 28Temporary use of land for maintaining the authorised development
- 29Statutory undertakers
- 30Apparatus and rights of statutory undertakers in streets
- 31Recovery of costs of new connections
- Part 6: OPERATIONS
- 32Crown Rights
- 33Felling or lopping of trees and removal of hedgerows
- 34Protective works to buildings
- Part 7: MISCELLANEOUS AND GENERAL
- 35Protective provision
- 36Restoration works
- 37Application of landlord and tenant law
- 38Operational land for purposes of the 1990 Act
- 39Deemed marine licence under the Marine and Coast Access Act 2009
- 40Defence to proceedings in respect of statutory nuisance
- 41Certification of plans etc.
- 42Service of notices
- 43Procedure in relation to certain approvals etc.
- 44Arbitration
- 45Guarantees in respect of payment of compensation
- Signature
- Schedule 1AUTHORISED DEVELOPMENT
- Schedule 2: REQUIREMENTS
- 1Interpretation
- 2Commencement of the authorised development
- 3Notice of commencement and completion of commissioning
- 4Notice of commencement of commercial use
- 5Detailed design
- 6Landscaping and biodiversity protection management and enhancement
- 7External lighting
- 8Highway accesses
- 9Means of enclosure
- 10Site security
- 11Fire prevention
- 12Surface water drainage
- 13Foul water drainage
- 14Flood risk mitigation
- 15Contaminated land and groundwater
- 16Archaeology
- 17Construction environmental management plan
- 18Protection of highway surfaces
- 19Temporary haul road (traffic management and protection)
- 20Temporary haul road (biodiversity protection)
- 21Temporary haul road (removal and restoration)
- 22Temporary haul road (prior approval of restoration scheme)
- 23Pilfrey laydown (design)
- 24Pilfrey laydown (removal and restoration)
- 25Construction traffic management plan
- 26Construction worker travel plan
- 27Construction hours
- 28Control of noise and vibration - construction
- 29Control of noise - operation
- 30Piling and penetrative foundation design
- 31Restoration of land used temporarily for construction
- 32Combined heat and power
- 33Carbon capture and compression plant
- 34Aviation warning lighting
- 35Air safety
- 36Local liaison committee
- 37Employment, skills and training plan
- 38Decommissioning
- 39Requirement for written approval
- 40Approved details and amendments to them
- 41Amendments agreed by the relevant planning authority
- Schedule 3STREETS SUBJECT TO STREET WORKS
- Schedule 4STREETS SUBJECT TO PERMANENT ALTERATIONS OF LAYOUT
- Schedule 5ACCESS - THOSE PARTS OF THE ACCESS TO BE MAINTAINED AT THE PUBLIC EXPENSE
- Schedule 6: NEW RIGHTS
- 1Interpretation
- Schedule 7: MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS
- 1Compensation enactments
- 2Compensation enactments
- 3Compensation enactments
- 4Application of Part 1 of the 1965 Act
- 5Application of Part 1 of the 1965 Act
- Schedule 8LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 9: PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- 1Paragraph 1
- 2Applications made under Requirements
- 3Further information and consultation
- 4Fees
- 5Appeals
- Schedule 10: PROTECTIVE PROVISIONS
- Part 1: FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS UNDERTAKER
- 1Application
- 2Interpretation
- 3On Street Apparatus
- 4Apparatus of National Grid in stopped up streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection of electricity undertaker
- 10Retained apparatus: protection of gas undertaker
- 11Expenses
- 12Indemnity
- 13Enactments and agreements
- 14Co-operation
- 15Access
- 16Arbitration
- 17Notices
- Part 2: FOR THE PROTECTION OF CANAL AND RIVER TRUST
- 18Interpretation
- 19Powers requiring the Canal and River Trust’s consent
- 20Fencing
- 21Survey of waterway
- 22Approval of plans, protective works etc.
- 23Design of works
- 24Notice of works
- 25Lighting
- 26Construction of specified works
- 27Prevention of pollution
- 28Access to work – provision of information
- 29Alterations to the waterway
- 30Maintenance of works
- 31Repayment of the Canal and River Trust’s fees, etc.
- 32Making good of detriment; compensation and indemnity, etc.
- 33Arbitration
- 34Capitalised sums
- Part 3: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
- 35Paragraph 35
- 36Paragraph 36
- 37Paragraph 37
- 38Paragraph 38
- 39Paragraph 39
- 40Paragraph 40
- 41Paragraph 41
- 42Paragraph 42
- 43Paragraph 43
- 44Paragraph 44
- Part 4: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 45Paragraph 45
- 46Paragraph 46
- 47Paragraph 47
- 48Paragraph 48
- 49Paragraph 49
- Part 5: FOR THE PROTECTION OF RAILWAY INTERESTS
- 50Paragraph 50
- 51Paragraph 51
- 52Paragraph 52
- 53Paragraph 53
- 54Paragraph 54
- 55Paragraph 55
- 56Paragraph 56
- 57Paragraph 57
- 58Paragraph 58
- 59Paragraph 59
- 60Paragraph 60
- 61Paragraph 61
- 62Paragraph 62
- 63Paragraph 63
- 64Paragraph 64
- 65Paragraph 65
- 66Paragraph 66
- 67Paragraph 67
- 68Paragraph 68
- 69Paragraph 69
- 70Paragraph 70
- 71Paragraph 71
- Part 6: FOR THE PROTECTION OF NATIONAL GRID CARBON LIMITED
- 72Application
- 73Application
- 74Application
- 75Interpretation
- 76Interaction with the NGC Pipeline Network
- 77Carbon dioxide export connections works
- 78Carbon dioxide export connections works
- 79Carbon dioxide export connections works
- 80Carbon dioxide export connections works
- 81Carbon dioxide export connections works
- 82On street apparatus
- 83Acquisition of land
- 84Protective works to buildings
- 85Removal of NGC apparatus
- 86Facilities and rights for alternative apparatus
- 87Specified works plan approval
- 88Specified works plan approval
- 89Expenses and costs
- 90Indemnity
- 91Co-operation
- 92Disputes
- Part 7: FOR THE PROTECTION OF NORTHERN POWERGRID
- 93Paragraph 93
- 94Paragraph 94
- 95Paragraph 95
- 96Paragraph 96
- 97Paragraph 97
- 98Paragraph 98
- 99Paragraph 99
- 100Paragraph 100
- 101Paragraph 101
- 102Paragraph 102
- 103Paragraph 103
- 104Paragraph 104
- 105Paragraph 105
- Schedule 11: DESIGN PARAMETERS
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Schedule 12DOCUMENTS AND PLANS TO BE CERTIFIED
- Schedule 13: DEEMED MARINE LICENCE UNDER PART 4 (MARINE LICENSING) OF THE MARINE AND COASTAL ACCESS ACT 2009 / DEEMED MMO LICENCE PROVISIONS
- Part 1: INTRODUCTION
- 1Paragraph 1
- Part 2: DETAILS OF LICENSED MARINE ACTIVITIES
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Part 3: CONDITIONS
- 7General
- 8Notifications and Inspections
- 9Pre-construction
- 10Pre-construction
- 11Pre-construction
- 12Pre-construction
- 13Pre-construction
- 14During Construction, Operation and Maintenance
- 15During Construction, Operation and Maintenance
- 16During Construction, Operation and Maintenance
- 17During Construction, Operation and Maintenance
- 18During Construction, Operation and Maintenance
- 19During Construction, Operation and Maintenance
- 20During Construction, Operation and Maintenance
- 21During Construction, Operation and Maintenance
- 22During Construction, Operation and Maintenance
- 23During Construction, Operation and Maintenance
- 24Post Construction
- 25Post Construction
- 26Post Construction
- 27Conditions Discharge
- Explanatory note