The Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025
W.S.I. 2025/1321 · Made 12 December 2025 · Extends to England and Wales
Building And Buildings, Wales
Made 12 December 2025
Laid before Senedd Cymru 17 December 2025
Coming into force 1 July 2026
The Welsh Ministers, in exercise of the powers conferred by sections 1(1), 3(1), 30A(1), (3), (5), (6), and (9), 34, 35(2), 35B(7)(a), 35C(1)(a), 47(4)(b)(ii) and 91B(7) of, and paragraphs 1A to 1I , 5B, 5C and 10 of Schedule 1 to, the Building Act 1984f1, make the following Regulations.
In accordance with section 14(7)f2 of the Building Act 1984, the Welsh Ministers have consulted the Building Regulations Advisory Committee for Wales and any other person that the Welsh Ministers consider appropriate.
Annotations to the whole text
Footnotes
- f1
-
1984 c. 55. Section 30A was inserted by section 37 of the Building Safety Act 2022 (“the 2022 Act”). Section 35 was substituted by section 39 of the 2022 Act. Sections 35B and 35C were inserted by section 38 of the 2022 Act. Section 91B(7) was inserted by paragraph 56 of Schedule 5 to the 2022 Act. Paragraphs 1A to 1I, 5B and 5C of Schedule 1 were inserted by sections 33 to 35 of the 2022 Act. Paragraph 10 of Schedule 1 was substituted by paragraph 83(8) of Schedule 5 to the 2022 Act. See the definitions of “appropriate national authority” and “prescribed” in section 126 of the Building Act 1984.
- f2
-
Section 14(7) was amended by paragraph 17(3) of Schedule 5 to the 2022 Act.
Contents
- Part 1: Preliminary
- 1Title, application and coming into force
- 2Interpretation
- Part 2: Building Control Approval
- Chapter 1: New HRBs
- 3Building control approval for HRB work or stage of HRB work
- 4Building control approval applications for HRB work or stage of HRB work
- 5Building control approval applications for HRB work or stage of HRB work: time limit
- 6Building control approval applications for HRB work or stage of HRB work: consultation
- 7Building control approval applications for HRB work or stage of HRB work: decisions
- 8Building control authority’s power to require notifications etc. for HRB work or stage of HRB work
- 9Notice before starting on site and further notice when work is “commenced”
- Chapter 2: Existing HRBs
- 10Notification of emergency repairs to existing HRB
- 11Building control approval for work to existing HRB
- 12Building control approval applications for work to existing HRB
- 13Building control approval applications for work to existing HRB: time limit
- 14Building control approval applications for work to existing HRB: consultation
- 15Building control approval applications for work to existing HRB: decisions
- 16Building control authority’s power to require notifications for work to existing HRB
- 17Notice before starting on site and further notice when work is “commenced”
- Part 3: Changes before or during construction
- 18Change control
- 19Change control: record-keeping
- 20Change control: notification requirements
- 21Change control applications
- 22Change control applications: time limit
- 23Change control applications: consultation
- 24Change control applications: decisions
- 25Change control: the building control authority’s power to specify notifiable changes and major changes
- 26Change control: major changes and notifiable changes
- 27New client etc.
- 28Insolvency etc. of the client: notifications
- 29New principal contractor or principal designer etc: notification
- 30Variation of a requirement imposed on a building control approval
- Part 4: Golden thread, mandatory reporting, information handover etc.
- 31Golden thread
- 32Mandatory occurrence reporting system
- 33Mandatory occurrence reporting: reporting to the building control authority
- 34Mandatory occurrence reporting: defences
- 35Mandatory occurrence reporting: definitions
- 36Mandatory occurrence reporting: client duty on appointment of principal contractor or principal designer
- 37Handover of information on completion etc.
- 38Information to be provided where work is scheme work
- Part 5: Completion certificates
- 39Completion certificate applications
- 40Completion certificate applications: time limit
- 41Completion certificate applications: consultation
- 42Completion certificate applications: inspection
- 43Completion certificate applications: decisions
- 44Partial completion certificates
- Part 6: Inspections etc., regularisation, review of decisions, appeals and section 30A procedures etc.
- 45Inspections etc.
- 46Regularisation of unauthorised building work
- 47Appeal of decisions
- 48Appeal in relation to Welsh Ministers’ decision
- 49Section 30A prescribed applications
- 50Section 30A applications: procedure
- 51Section 30A applications: electronic submissions
- 52Section 30A applications: determinations
- 53Section 30A applications: appointed persons
- 54Deemed rejection of the original application
- 55Section 30A applications: appeals
- Part 7: Miscellaneous
- 56Exempt work
- 57Contraventions by the building control authority not to be subject to enforcement
- 58Provisions in relation to which a stop notice may be given
- 59Transitional provisions
- Signature
- Schedule 1: Documents
- 1Competence declaration
- 2Construction control plan
- 3Change control plan
- 4Building Regulations compliance statement
- 5Fire and emergency file
- 6Partial completion strategy
- Schedule 2: Exempt work
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- Schedule 3: Transitional provisions
- 1Transitional provisions in relation to plans deposited or initial notices given before 1 July 2026
- 2Interpretation
- Explanatory note