Section 75 Exemptions for certain dredging etc activitiesI1C1C2
United Kingdom
The conditions are—
that the activity is undertaken by or on behalf of a harbour authority, and
that the activity is authorised by, and carried out in accordance with, any legislation falling within subsection (3).
The additional conditions are—
that the activity involves the relocation of sediments inside surface waters,
that the activity is for the purpose of—
managing waters or waterways,
preventing floods,
mitigating the effects of floods or droughts, or
land reclamation, and
that it is proved to the satisfaction of the appropriate licensing authority for the area in which the activity is to be undertaken that the sediments are not hazardous waste.
The legislation is—
any local Act,
any order under section 14 or 16 of the Harbours Act 1964 (c. 40),
any order under section 1 of the Harbours Act (Northern Ireland) 1970 (c. 1 (N.I.)), or
section 10(3) of that Act.
In this section—
“dredging or spoil disposal activity” means—
- (a)
any dredging operation, or
- (b)
the deposit of any dredged materials that result from an exempt dredging operation;
- (a)
“exempt dredging operation” means a dredging operation for which a marine licence is not needed by virtue of this section.
Any expression used in subsection (1)(b) or (2A) and also in F5Directive 2008/98/EC of the European Parliament and of the Council of 19 November 2008 on waste F6, as last amended by F7Directive (EU) 2018/851, has the same meaning as in that Directive.
Annotations
Textual amendments
- F1
Words in s. 75(1) renumbered as s. 75(1)(a) (6.4.2011) by Marine and Coastal Access Act 2009 (Amendment) Regulations 2011 (S.I. 2011/405), regs. 1, 2(2)(a)
- F2
S. 75(1)(b) and word inserted (6.4.2011) by Marine and Coastal Access Act 2009 (Amendment) Regulations 2011 (S.I. 2011/405), regs. 1, 2(2)(b)
- F3
S. 75(2A) inserted (6.4.2011) by Marine and Coastal Access Act 2009 (Amendment) Regulations 2011 (S.I. 2011/405), regs. 1, 2(3)
- F4
S. 75(5) inserted (6.4.2011) by Marine and Coastal Access Act 2009 (Amendment) Regulations 2011 (S.I. 2011/405), regs. 1, 2(4)
- F5
Words in s. 75(5) substituted (3.8.2016) by The Waste (Meaning of Recovery) (Miscellaneous Amendments) Regulations 2016 (S.I. 2016/738), regs. 1(1), 3
- F6
Words in s. 75(5) inserted (17.9.2018) by The Environment, Food and Rural Affairs (Miscellaneous Amendments and Revocations) Regulations 2018 (S.I. 2018/942), regs. 1(2), 6
- F7
Words in s. 75(5) substituted (1.10.2020) by The Waste (Circular Economy) (Amendment) Regulations 2020 (S.I. 2020/904), regs. 1(1), 6
Modifications
- C1
S. 75 excluded (17.7.2023) by S.I. 2023/675, art. 50(4) (as inserted by The Portreath, Portscatho and Portwrinkle Harbour Empowerment Order 2023 (S.I. 2023/680), arts. 1(1), 5(3) (with arts. 6, 7))
- C2
S. 75 excluded (20.2.2026) by The Lyme Regis, Bridport (West Bay) and Weymouth Harbour Revision Order 2026 (S.I. 2026/62), arts. 1(1), 42(2) (with arts. 30, 51, 52)
- C3
S. 75(3) modified (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 43(1)(4) (with arts. 55, 56)
- C4
S. 75(3) modified (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 27(5) (with Sch. 12)
Commencement
- I1
S. 75 in force at 6.4.2011 by S.I. 2011/556, art. 3(2)(a)
Notes on Part 4
Modifications
- C1
Pt. 4 excluded (11.3.2015) by The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (S.I. 2015/318), arts. 1, 8(6) (with arts. 40, 41, Pt. 2 para. 4(2), Pt. 2 para. 4(3), Pt. 2 para. 19, Pt. 4 para. 3, Pt. 4 para. 4, Pt. 4 para. 16, Sch. 12 paras. 4, 9(2), 10)
- C2
Pt. 4 excluded (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), arts. 1, 8(7) (with arts. 40, 41)
- C3
Pt. 4 modified (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), arts. 1(2), 36 (with arts. 37, 38)
- C4
Pt. 4 modified (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), arts. 1, 39 (with art. 43)
- C5
Pt. 4 modified (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 31 (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
- C6
Pt. 4 applied (E.W.S) (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 32 (with arts. 41, 42, Sch. 17 para. 66)
- C7
Pt. 4 applied (E.W.S.) (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 32 (with arts. 41, 42, Sch. 16)
- C8
Pt. 4 modified (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 39 (with art. 32, Sch. 10 paras. 26(2), 68)
- C9
Pt. 4 modified (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), arts. 1, 39 (with arts. 47, 48, Sch. 10)
- C10
Pt. 4 modified (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 5 (with arts. 37, 38, Sch. 10)
- C11
Pt. 4 modified (22.9.2025) by The Morgan Offshore Wind Project Generation Assets Order 2025 (S.I. 2025/1012), arts. 1, 5 (with arts. 9, 10)
- C12
Pt. 4 modified (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 42(1) (with Sch. 12)
- C13
Pt. 4 modified (23.12.2025) by The Morecambe Offshore Windfarm Generation Assets Order 2025 (S.I. 2025/1366), arts. 1, 5 (with arts. 9, 10)
- C14
Pt. 4 modified (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 5 (with arts. 39, 40, Sch. 9)
- C15
Pt. 4: power to amend or modify conferred (12.2.2026) by Biodiversity Beyond National Jurisdiction Act 2026 (c. 6), ss. 22(3), 32(1) (with s. 30)
- C16
Pt. 4 modified (5.6.2026) by The North Falls Offshore Wind Farm Order 2026 (S.I. 2026/567), arts. 1, 35 (with arts. 44, 45, Sch. 14)
- C17
Pt. 4 modified (5.6.2026) by The Dogger Bank South East and West Offshore Wind Farms Order 2026 (S.I. 2026/577), arts. 1, 35 (with arts. 40, 41, Sch. 15)