The Northampton Gateway Rail Freight Interchange Order 2019 in Wales
S.I. 2019/1358 · Made 9 October 2019 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 9th October 2019
Coming into force 30th October 2019
The application was examined in accordance with Chapter 4 of Part 6 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 2010f3 by a Panel of three members (“the Panel”) appointed by the Secretary of State in accordance with Chapter 2 of Part 6 of the 2008 Act.
The Panel, having examined the application with the documents that accompanied the application, and the representations made and not withdrawn, has, in accordance with section 74(2) of the 2008 Act, made a report and recommendation to the Secretary of State.
The Secretary of State, having considered the representations made and not withdrawn and the report of the Panel, has decided to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial change to the proposals comprised in the application.
The Secretary of State in exercise of the powers conferred by section 114, 115, 117, 120 and 122 of, and paragraphs 1 to 3, 10 to 15, 17, 19, 20, 22 to 24, 26, 33 to 37 of Schedule 5 to, the 2008 Act, makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).
- f2
-
S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2014/469, S.I. 2014/2381, S.I. 2015/377, S.I. 2015/1682, S.I. 2017/524, S.I. 2017/572, S.I. 2018/378 and S.I. 2019/734.
- f3
-
S.I. 2010/103, amended by S.I. 2012/635.
Contents
- Part 1: PRELIMINARY
- 1Citation and Commencement
- 2Interpretation
- Part 2: PRINCIPAL POWERS
- 3Development consent granted by the Order
- 4Parameters of authorised development
- 5Authorisation of use
- 6Maintenance of authorised development
- 7Benefit of Order
- Part 3: STREETS
- 8Street works
- 9Power to alter layout, etc., of streets
- 10Permanent stopping up of streets
- 11Temporary stopping up of streets
- 12Public rights of way – creation, substitution and stopping up
- 13Accesses
- 14Maintenance of highway works
- 15Classification of highways
- 16Speed limits
- 17Traffic regulation
- 18Clearways
- 19Motor vehicle restrictions
- 20Agreements with highway authorities
- Part 4: SUPPLEMENTAL POWERS
- 21Discharge of water
- 22Authority to survey and investigate the land
- Part 5: POWERS OF ACQUISITION
- 23Guarantees in respect of payment of compensation
- 24Compulsory acquisition of land
- 25Compulsory acquisition of rights
- 26Private rights
- 27Power to override easements and other rights
- 28Compulsory acquisition of land – incorporation of the mineral code
- 29Time limit for exercise of authority to acquire land and rights compulsorily
- 30Modification of Part 1 of the 1965 Act
- 31Application of the 1981 Act
- 32Statutory undertakers and operators of the electronic communications code network
- 33Rights under or over streets
- 34Temporary use of land for carrying out the authorised development
- 35Temporary use of land for maintaining the authorised development
- 36Apparatus and rights of statutory undertakers in stopped up streets
- 37No double recovery
- Part 6: MISCELLANEOUS AND GENERAL
- 38Operation and use of railways
- 39Operational land for the purposes of the 1990 Act
- 40Charges
- 41Defence to proceedings in respect of statutory nuisance
- 42Felling or lopping of trees and removal of hedgerows
- 43Protective provisions
- 44Governance of requirements and governance of protective provisions relating to highway works
- 45Disapplication, application and modification of legislative provisions
- 46Certification of plans and documents
- 47Service of notices
- 48Arbitration
- Signature
- Schedule 1: AUTHORISED DEVELOPMENT
- 1NSIP: THE CONSTRUCTION OF A RAIL FREIGHT INTERCHANGE
- 2ASSOCIATED DEVELOPMENT
- Schedule 2: REQUIREMENTS
- Part 1: REQUIREMENTS
- 1Interpretation
- 2Time limit
- 3Components of development and phasing
- 4Sustainable transport
- 5Design and phasing of highway works
- 6Design and phasing of highway works
- 7Highway alternatives
- 8Detailed design approval
- 9Detailed design approval
- 10Provision of landscaping
- 11Landscape and ecological management plan
- 12Construction environmental management plan
- 13Earthworks
- 14Archaeology and built heritage
- 15Lighting details
- 16Building sustainability
- 17Flood risk and surface water drainage
- 18Flood risk and surface water drainage
- 19Flood Risk
- 20Foul water drainage
- 21Construction hours
- 22Construction noise
- 23Noise during the operational phase
- 24Monitoring of complaints
- 25Contamination risk
- 26Contamination risk
- 27Waste management during the operational phase
- 28Employment
- 29Community liaison group
- 30Rail Central
- 31Rail Central
- 32Rail Central
- Part 2: PROCEDURE FOR APPROVALS ETC. UNDER REQUIREMENTS
- 1Applications made for certain approvals
- 2Further information
- 3Fees
- 4Appeals
- 5Interpretation of Part 2 of Schedule 2
- Schedule 3STREETS SUBJECT TO STREET WORKS
- Schedule 4STREETS TO BE PERMANENTLY STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
- Schedule 5: PUBLIC RIGHTS OF WAY
- 1PUBLIC RIGHTS OF WAY TO BE PERMANENTLY STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
- 2PUBLIC RIGHTS OF WAY TO BE PERMANENTLY STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
- 3NEW PUBLIC RIGHTS OF WAY TO BE CREATED
- Schedule 6: PRIVATE MEANS OF ACCESS
- 1PRIVATE MEANS OF ACCESS TO BE REPLACED
- 2PRIVATE MEANS OF ACCESS TO BE CLOSED FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
- 3NEW PRIVATE MEANS OF ACCESS CREATED
- Schedule 7: CLASSIFICATION OF HIGHWAYS
- 1NEW HIGHWAYS
- 2EXISTING HIGHWAYS
- Schedule 8: SPEED LIMITS
- 1EXISTING ORDERS
- 2HIGHWAYS SUBJECT TO 50MPH SPEED LIMIT
- 3DERESTRICTED HIGHWAYS
- 4TEMPORARY SPEED LIMITS
- Schedule 9: TRAFFIC REGULATION
- 1AMENDMENTS TO EXISTING ORDERS
- 2CLEARWAYS
- 3ENVIRONMENTAL WEIGHT LIMIT
- 4PROHIBITED MOVEMENTS
- Schedule 10LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 11LAND IN WHICH NEW RIGHTS MAY BE CREATED
- Schedule 12: MODIFICATIONS OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS
- Compensation enactments
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Application of Part 1 of the 1965 Act
- 5Application of Part 1 of the 1965 Act
- Schedule 13: PROTECTIVE PROVISIONS
- Part 1: FOR PROTECTION OF RAILWAY INTERESTS
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- 22Dispute Resolution and Arbitration
- Part 2: FOR THE PROTECTION OF HIGHWAYS ENGLAND
- 1Application
- 2Interpretation
- 3Prior approvals and security
- 4Carrying out of works
- 5Payments
- 6Provisional certificate
- 7Handover certificate and defects period
- 8Final certificate
- 9Security
- 10Commuted sums
- 11Insurance
- 12Indemnification
- 13Warranties
- 14Land transfer
- 15Approvals
- 16Expert determination
- 17Expert determination
- Part 3: FOR THE PROTECTION OF THE LOCAL HIGHWAY AUTHORITY
- 1Application
- 2Interpretation
- 3Prior approvals and security
- 4Carrying out of works
- 5Payments
- 6Provisional certificate and defects and maintenance period
- 7Final Certificate
- 8Security
- 9Commuted sums
- 10Insurance
- 11Indemnification
- 12Warranties
- 13Approvals
- 14Expert determination
- 15Expert determination
- Part 4: FOR THE PROTECTION OF CADENT GAS LIMITED AS GAS UNDERTAKER
- 1Application
- 2Interpretation
- 3On street apparatus
- 4Apparatus of Cadent in stopped up streets
- 5Acquisition of land
- 6Removal of apparatus
- 7Facilities and rights for alternative apparatus
- 8Retained apparatus: protection
- 9Expenses
- 10Indemnity
- 11Enactments and agreements
- 12Co-operation
- 13Access
- 14Arbitration
- 15Notices
- Part 5: FOR THE PROTECTION OF ANGLIAN WATER LIMITED
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 6: FOR THE PROTECTION OF ELECTRICITY UNDERTAKERS
- 1Application
- 2Interpretation
- 3On street apparatus
- 4Apparatus in stopped up streets
- 5Acquisition of land
- 6Removal of apparatus
- 7Facilities and rights for alternative apparatus
- 8Retained apparatus
- 9Expenses and costs
- 10Expenses and costs
- 11Expenses and costs
- 12Co-operation
- 13Co-operation
- Part 7: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Schedule 14: MISCELLANEOUS CONTROLS
- Public general legislation
- 1Introduction
- 2Highways Act 1980
- 3New Roads and Street Works Act 1991
- 4Local Government (Miscellaneous Provisions) Act 1976
- Schedule 15: MEMBERSHIP, ROLE AND PROTOCOL OF THE SUSTAINABLE TRANSPORT WORKING GROUP
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- Schedule 16CERTIFICATION OF PLANS AND DOCUMENTS
- Explanatory note